ML20086D814

From kanterella
Jump to navigation Jump to search
AO 73-06:on 730302,chemist,while Attempting to Draw Offgas Sample,Discovered Improper Flow Through Offgas Sample/ Monitoring Sys.Caused by Two Lines to Sys Rolled During Mods Made During Plant Outage
ML20086D814
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/02/1973
From: Riley B
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086D809 List:
References
AO-73-06, AO-73-6, VYV-2480, NUDOCS 8312050135
Download: ML20086D814 (1)


Text

_ _

{ >

)b o,s m c

' -[

C N 7g VERMONT YANKElc NUCLEAR POWER ObRPORATION seventy esvem onove svarcr RUTt.AND, VERMONT 0370L Viv - 2480 *"*

  • o. sov is7 VCRNON. VERMONT 093s4 March 2, 1973 United States Atomic Br.svgy Crnmelselon laineto ate of Eagalatory Optrations, F.931on 1 97"> Broad Street Nevark. New Jersey C7102 l

REl'EkENCE: Operating Licecae DPP-28 Dociet Nee. 50-271

, Abnom al Occurrsote No. A0-73-06 Ger.tle.nen :

Aa dGfinSd by TBehnical Sp2cifications for th3 Vernent '/ar}tet ,

Puelear Fowar Sta*. ton, Section f,.7.4.c, va are reporcing the follooring Abncrual Cccurrence as AC-73-05 att confituing our telephcna converentio:-

with your office.

At apptcS.fmetely 0800 on Hart.h 2 darir.g a plant startup and power ascenion, a chamist while attempting to draw an off-gas sample dia-covered that there vaa impropar flow through the off-Esa sample / monitoring systema. This ircperability of the cff-gas monitoring eyeten er.ceeds i

the Lin.iting Condition for Opsration as d6 fined by Saction 3.S.A.1 of Technical Spacification.. 1hs subject section t~equires that at laaet en off-gae monitorin; system ts opsrable at all t.imes. The rea: tor was-operating at 47% p w ar at ths tina of this incide:t with a stack gas.

dischstgs r+te of ap;roximately 600 p01/sec.

Investigation revealed that two 11nsa going to tha cff-gas monitoring system had bson rolled during system modificatf or.a made during the last plant outage. Sin:o Technical Sp2cification Sectiors 3.8.A.2 Er.3 vare not being exceehd at 47% rever leval, ne red'.setion of power was necessary, Tha srystem was repstred, checked out, ar.d placed tack in eparation by {

2 00~, on March 2.

Very cru3y yours.

VERMOMT YAFKE8 DU% BAT. POWER CGFOMTIM k

G DO O .h / (

Ersdford U. F11sy o Plant Suparinter. dant: (

n .

FBT/sas I I

, L c(e *hf

1 '

4 ,

, .....a,-

?