ML20086C769
| ML20086C769 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 11/18/1991 |
| From: | Barrett R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20086C771 | List: |
| References | |
| NUDOCS 9111250075 | |
| Download: ML20086C769 (8) | |
Text
~ >SRIGO
'o UNITED STATES I,'g
[
NUCLEAR REGULATORY COMMISSION 4,.,y g
.t W ASHINo ton. D. C. 205b5 p.,
c
.%...+y COMMONWEALTH EDISON COMPANY AND IOWA-ILLINOIS GAS AND ELECTRIC COMPANY DOCKET NO.56-254 QUAD CITIES NUCLEAR POWER 51 ATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No,133 License No. DPR-29 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
Tr.e appli:ation for amendment by Commonwealth Edison Company (the licensee) dated September 24, 1991, complies witt' the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulatioM, of the Commission; C.
The'e is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be i,iimical to the common defense and security or to the health and safety of the public; and l
E.
The issuance of this-amendment is in accordance with 10 CFR rart 51 of the Commissinn's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-29 is l
hereby amended to read as follows:
l l
i l
i 9111250075 9.1111D PDR ADOCK OSOOOD54 P
ppn
^
. B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.133, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This-license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION (s'
bV d. Iar(r[ett, Director Riche Project Directorate 111-2 Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation Attachment.
Changes to the Technical Specifications Date of Issuance: November 18, 1991 4
9 e
~ _ _ _..
/
ATTACHMENT TO LICENSE AMENDMENT NO.133 FACILITY OPERATING LICENSE NO. DPR-29' DOCKET NO. 50-254 Revise'the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.
The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of chcage REMOVE INSERT 3.8/4.8-20 3.8/4.8-20 I-l b
i I
i
4 QUAD-CITIES DPR-29 2)
In place test the charcoal adsorber banks with halogenated hydrocarbon tracer to verify leak tight integrity.
- 3) Remove one carbon test canister from the charcoal adsorber.
Subject this sample to a lat, oratory analysis to verify methyl iodide removal efficiency, b.
The results of in place o.
At least or.se per operating halogenated hydrocarbon cycle, but not to exceed 18 tetts at 2000 cfm (+ 10%) on months, the following the charcoal banks ihall conditions shall be show < 1% penetration.
demonstrated:
- 1) Pressure drop across the combined filters is less than 6 inches of water at 2000 cfm (
10%) flow rate.
- 2) Operability of inlet heater demonstrates heater AT determined by the following formula:
c.
The results of laboratory AT B 28.5-(0.0075F);
carbon sample analysis shall where AT is the differ-show > 90% methyl iodide ential temperature and removal efficiency when F is the flow (cfm) at tested at 130 C and 95% R.H.
which the test is performed.
3.
Postmaintenance Requirements 3.
Postmaintenance Testing a.
After any maintenance or a.
After any maintenance or heating that could affect testino that could affect the HEPA filter or HEPA the lean tight integrity of filter mounting frame the HEPA filters, perform leaked tight integrity, the in place DOP tests on the results of the in place D0P HEPA filters in accordance tests at 2000 cfm (+ 10%) on with Specification 3.8.H.2.a.
HEPA filters shall ihow < 1%
DOP penetrat;on.
3.8/4.8-20 Amendment No. JJA,133
4 g># RIGg%
UNITED STATES
!\\
I'n NUCLE AR REGULATORY COMMISSION
,, c W. f i
WASHINoToN, O C. 20%s a....
COMMONWEALTH EDISON COMPANY AND IOW) 'LLIN015 GAS AND ELECTRIC COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 128 License No. DPR-30 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Commonwealth Edison Company (the licensee) dated September 24, 1991, complies with the standards and requirements of the Atomic E ergy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compli.1ce with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the l-common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 l
of the Commission's regulations and all applicable requirement-l have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attacnment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-30 is hereby amended to read as follows:
l l
l l
a 2-B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 128, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE ilVCLEAR REGUL TORY COMMISSION
(/
,qp Richarc v/ a Fett, Director Project Firectorate III-2 Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to 'Me Technical Specifications Date of Issuance:
.. o..,ber 18, 1991 a
a
e ATTACHMENT TO LICENSE AMENDMENT NO.128 FACILITY OPERAllNG LICENSE NO. OPR-30 DOCKET NO. 50-265 i
Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.
The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE INSERT 3.8/4.8-14b 3.8/4.8-145
..__________._._..__,________.____._._______________.______-__m_____
__m_
OUAD CITIES DPR-30 3)
Remove one caroon test canister from the charcoal absorbar.
Subject this sample to a laboratory analysis to verify methyllodine removal efficiency.
b.
At least once per operating cycle, out not to exceed 18 months, the following conditions shall be demonstrated:
1)
Pressure drop across the combined filters is less than 6 inches of water at 2000 cfm (110%) flow rats.
2)
Operability of irlet heater demonstrates heater AT determined by the following formula:
AT ;> 28.5-(0.0075F);
where AT is the differential temperature and F is the flow (cfm) at which the test is performed.
3.
Postmaintenance Requirements 3.
Postmaintenance Testing a.
After any mrintenarice or a.
After any meintenance or testing heating that could affect the that could affect the leaktight HEPA filter or HEPA filter integrity of the HEPA filters, mounting frame leak tight perform in place DOP tests on intagrity, the results of the the HEPA filters in accordance in-place DOP tests al 2000 cfm with Specification 3.8.H.2.a.
(+ 10%) on HEPA filters shall show 3; 1% DOP penetration.
b.
After any maintenance or testing that could affect toe leaktight b.
After any maintenance or testing integrity of the charcoal that could afbet the charcoal absorber banks, perform absorber lea.stight integrity, the halogenated hydrocarbon tests
(
results of in place halogensted on the charcoal absorbers in -
L hydrocarbon tests at 2000 cfm accordance with Specification
(+ 10%) shall show 3; 1%
3.8.H.2.b.
o penetration.
l l
3.8/4.8 14b Amendment No. 9Cr,128
[-
D U
...