ML20086B473

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips. Central Files Version of Revised EPIPs Withheld
ML20086B473
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/29/1995
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19330G121 List:
References
PBL-95-0163, PBL-95-163, NUDOCS 9507050397
Download: ML20086B473 (1)


Text

-

Wisconsin g

POWERCO PANY Point Beoch Nuclear Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 PBL 95-0163 June 29, 1995 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUC1&AR PLANT. UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance

'th the attached instructions.

Please t..

. hat the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rcoms.

Sincerely, r'

-n G. J. Maxfield Manager dms Enclosure cc:

NRC Resident Inspector (w/o/e)

Incident Response Center, Region III i

l

]

W Bel.

j 9507050397 950629

/

/

/g M PDR ADOCK 0500 6

f 1

)

.4 subsWwrofHiuvnsm Enegr Guyorahm

.