ML20086B416

From kanterella
Jump to navigation Jump to search
Application for Amend to Licenses DPR-77 & DPR-79,consisting of TS Change 94-14 Re Personnel Airlock Open During Core Alterations
ML20086B416
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/29/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086B418 List:
References
NUDOCS 9507050369
Download: ML20086B416 (3)


Text

f we 9-a RA Tenneswe VaHey Authonry. Post Office Bon 2000. Scudy-Daisy. Tennessee 37379 June 29,1995 TVA-SON-TS-95-14 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 95-14," PERSONNEL AIRLOCK OPEN DURING CORE ALTERATIONS" In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed changes allow the containment personnel airlock doors to be open during fuel movement and ,

core alterations, provided one door is capable of closure and one train of auxiliary building gas treatment remains operable.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. >

SON is planning chemical cleaning of the steam generators that will require additional penetrations. The routing of control cables for the chemical cleaning through the personnel airlocks with quick disconnects will eliminate the need to open additional penetrations. Therefore, approval of this proposed TS change is requested prior to the start of the Unit 1 Cycle 7 refueling outage currently scheduled to begin on September 9,1995.

03CCEJ 9507050369 95062'?

PDR ADOCK 05000327 PDR (ss\

P ,

A.e A ,-A q 6- , s # PAW e4 44w 4tW. J. 4. 5.44& o & as.F 4 4

  • i. '

't 4'_I':i .7

3. _. j ':...

g

,, 't ,

g e

C a

lil t-e-

4

.t m o-F i-.

h te r

I-..

1-e 1

f a

f'.

a 4

J,.

a w

1-4 k.

i t

l .

'1l I ..  ;

b I

0

?

o .. f

, . t*

s f *

! f r

p I

P l

, i 1

g E

s I '

i

)

4 5

=

1 1

1 b

l 7

-I

'.I f

- l l

E

+ww---* r - W erve ne,ww,-.ww,w,y ., .. ,_ . ., . _ , _ . _

s.i ,f,p .

j f

I

U.S Nuclear Regulatory Commission. ,

' Page 2 i June 29,1995 j TVA requests a 45-day implementation period for this TS change following issuance l to revise appropriate procedures. .i Please direct questions concerning this issue to W.- C. Ludwig at (615) 843-7460. l t

Sincerely,  ;

R. H. Shell i Manager -

SON Site Licensing

-Sworn tgand subs ed before me

t. d@. day of M 1995  !

imt 7M W)3/ Lima '

l

' Nota 7y/Mlblic 7 ,

My Commission Expires M 2/ /

Enclosures cc: See page 3 f

j

.)

I i

4

Uc s

3 ; .,

L .

U.S. Nuclear Regulatory Commission Page 3 June 29,1995 (Enclosures):

Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 lgou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

.