ML20086A879

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR73 Re NRC Initiative to Eliminate Requirement to Post Security at Primary Containment Entrance During Refueling & Major Maint Periods
ML20086A879
Person / Time
Site: Pilgrim
Issue date: 06/14/1995
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-60FR24803, RULE-PR-73 60FR24803-00020, 60FR24803-20, 95-065, 95-65, NUDOCS 9507050078
Download: ML20086A879 (1)


Text

i O DOCKETED soeron Edtson USNRC gO Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 023%  % JJN 19 P4 :07 0FFICE OF SEC RETARY E. T. Bouk,tte, PhD DOCHETING & SERVICE 5 RANCH Senior Vice President-Nuclear June 14. 1995 BECo Ltr. #95-065 U.S. Nuclear Regulatory Commission Washington, DC 20555 DOCKET NUMBER "0 SED RULE N 73 _

' Attention: Docketing and Service Branch Docket No. 50-293 License No. DPR-35 Proposed Rule 10CFR73.55 (60FR24803)

Boston Edison supports the NRC initiative to eliminate the requirement to post security at the primary containment entrance during refueling and major maintenance periods.

We also endorse the letter submitted by the Nuclear Energy Institute on this subject.

h EiE E. T. Boulette, PhD ETB/nas/ Rap 95/SECGUARD Attachment cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - t/II Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint NoP.h 11555 Rockville Pike

~ Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region i 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station 9507050078 950614 PDR PR 73 60FR24803 PDR '(/ [)