Intervenor Exhibit I-MOSBA-53,consisting of Conversation Taken from Tape 184,Segment 1
ML20086A585
Person / Time
Site: Vogtle  
Issue date: 05/17/1995
From:
AFFILIATION NOT ASSIGNED
To:
References
OLA-3-I-MOSBA53, NUDOCS 9507030292
Download: ML20086A585 (1)


Text

T AMSAV] - 53 og /

Tape 184 00CKETED USNRC Exhibit $~2, page J

)

SEGMENT #1 Tr. pg. 26 95 WN -6 P3 :31 Date: End of August Location: 2nd floor Service Bid. War Room

'0FFICE OF SECRETARY Bockhold: Lets go to the first paragraph.

DOCKETING & SERVICE Horton : Hold on a minute. There's another 'hsue on $'pq0M s

Horton : Uh, previously Note 2 said, well we'll get to it in a minute in that paragraph, but I want to point out to the board members the one, two, three, four, five, six, the first seven runs,120 thru 126. We-we're fixing to cour,t start attempts in that Note 2 as - not counting five, the first five starts.

I just want everybcdy to look at it now when we get back to the verbiage we're going to need to address our Vogtle definition of a post maintenance start.

This is an issue with the NRC.

Bockhold : What that we-Horton

. That we have post maintenance uh, shakedown is the word that is used by one of the region folks.

Bockhold : What. I mean if you got,if you are doing a post mainrtenance run and you had the machine apart, uh-Horton :

There's no such thing in the reg. guide.

Aufdenkampe: I remember all of a sudden. The more I do the more i remember.

What we did was tie the words, should be considered valid tests Horton:

I think it's the first sentence in paragraph 7 on the next page.

i They should be considered valid tests.

O SEGMENT #2 Tr. pg. 28, 29 Date: End of August Location: 2nd floor Service Bid. War Room Horton. Okay, my final issue here was really with number 124. Uh, based on my research, we're hard pressed to call that a post maintenance run.-

I'm not sure how somebody decided previously that start 120 thru 124 were post maintenance runs.

Bockhold: Was that in, in any of the previous documentation?

Voice

No.

Horton : Well every sheet is checked off post maintenance-Bockhold: No, no, no, no, no, no I'm talking about the LER or any other-Then then it's not an issue.

NUCLEAR REGULATORY COMMISSION y -wr.c4 -3 Docket No. hr m -3 Otheial Exh. No. L+

C In the matter of G PC <+

c(.

Straf IDENTIFIED Apphcant RECEIVED

/

latervenct 7

REJECTED Conto Offr 9507030292 950517 Contractor DATE 07' /7' N gDR ADOCK 05000424 Other Witness Simid<f PDR Reporter C. A,v