Monthly Operating Rept for Oct 1991 for Monticello Nuclear Generating Plant
ML20086A287
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/31/1991
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111190008
Download: ML20086A287 (5)


Text

__

s Northem States Power Company 414 Nicotiet Mall Minneapohs. Minnesota 55401 1927 Telephone (612) 330-5500 November 12, 1991 Monticello Technical Specifications Section 6.7,A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATINC PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report O_qtober 1991 Attached is the Monthly Operating Report for October 1991 for the Monticello Nuclear Generating Plant.

IN omas M Parker Manager Nuclear Jupport Service TMP/mkl C:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment Y

100010 rp/

l, 9111190008 911031 I

FDR ADOCK 05000263

/

fJ R

PDR

(

L

_ OPERATING' DATA REPORTL DOCKET NO.

50-263 l*

DATE 11-2 COMPLETED BY H.

H. Paustian TELEPHONE 612/295-5151 OPE 3ATING STATUS

+

~] Notes

]-

1;-Unit-Name :

Monticello

)

]

12.: Reporting period OCTOBER

.]

]

,j 3~. Licensed Thermal Power (MWt):

1670

]

)

l

4. Nameplate Rating (Gross MWe):

569

]

1 F

5. DesigneElectrical Rating (Net MWe):

545.4 1

]

'6. Maximum-Dependable. Capacity (Gross MWe):

564

)

]

'7. Maximum Dependable Capacity (Net MWe):

- 536

'l 1

8.'If; Changes-Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

!lC l

9.. Power Level To Which--Restricted, If Any (Net MWe):

N, A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 745 7296 178273 i

11 2. Number Of Hours Reactor Was Critical 745.0 5611.6 141954.4 E13. Reactor-Reserve Shutdown Hours

.0.0 0.0 940.7

-14. Hours Generator On-Line-745.0 5533.4 139283.9 15, Unit Reserve-Shutdown Hours 0.0

_ 0. 0 0.0

'16. Gross Thernal-Energy; Generated (MWH) 1231123 8768060-213090994

17. Gross Electrical Energy Generated (MWH) 416163 2935403_

72063963

.18.LNet Electrical Energy Generated (MWH) 400695 2800919 68908166

19. Unit-Service Factor 100.0%

75.8%

78.1%

20 EUnit-Availability Factor 100.0%

75.8%

78.1%

21'. Unit l Capacity _ Factor (Using MDC Net) 100.3%_

71.6%

72.1%

E22~.-Unit Capacity Factor'(Using DER Net) 98.6%

-70.4%

70.9%

23.-Unit _ Forced Outage-Rate 0.0%

3.9%.

-3 9%

L24. Shutdowns Scheduled Over Next-12 Months (Type,-Date, _and Duration of Each)

L

. :: None 25.LIfTshut Down At End Of Report Period, Estimated Date Of Startup:N/A

'26.fUnits In Test' Status (Prior to Commercial Operation): N/A Forecast Achieved-INITIAL CRITICALITY

__ INITIAL _ ELECTRICITY COMMERCIAL OPERATION e'

77

-w T-yev

----'-'F

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE 4

DOCKET NO.

50-263 DATE 11-2-91 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 MONTH OCT 10-1-91 to Power operation.

10-15-91 10-15-91 Power reduction to replace tachometer for Recirculation to System MG set.

10-16-91 10-16-91 to Power operation.

10-28-91 10-28-91 to Power reduction to repair valve for Condensate Drip Tank.

10-29-91 10-29-91 to Power operation.

10-31-91 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

AVERAGE DAILY UNIT POWER LEVEL p,

.c i4 DOCKET NO.

50-263 UNIT _ Ponticello-DATE 2-91 COMPLETED BY H.

H. Paustian TELEPHONE 612/295-5151

' MONTH OF OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1-542.

17

539, 2-546.

18 543.

3.

543.

19 543.

4

543, 20 545.

-5

._546.

21 544.

6

541, 22 544.

7

541, 23 549.

18 543.

24 544.

9 545.

25 535.

10:

-544 26 546.11-542.

27 544.

12

543, 28

-521.

13-545-29 496._

14-543.

30 541.

15 516.

31 547.

16.

468.

l

. INSTRUCTIONS On this format, list the average daily. unit power level in MWe-Net for each rday in.the reporting-:. month.

Compute to the nearest whole megawatt.

UtilT SIRmXNf15 Af0 POVER REDUCTIOf15 DGGEr 90D. 50-263

'3' IMIT PU.HE ~MonticGTio DATE ~11-02-91 COMPIETED BT 71. U. Paustian

REPORT H0rmi October" TELEP110t1E _612/295-5151-Duration Reason Method

' IER S stem Cause & Corrective IJo.

Date T S>e f)

(hours) l(2) of 11 o.

bode Combe.

Co Action to Shutdown (4)

(5)

Prevent Recurrence (3) 8 10-15-91

S 0.0 B

4 tuA AD TAC Reduced power to 35% to replace recirc.. system MG..

set tachometer.

9 10-28-91 S

0.0 B

4 fuA SD V

Reduced power to 60% to minimize dose during Condensate Drip Tank valve repair.

i

\\

I k

i 1

2 3

4 F: Forced Reason-Hethod:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)

B-Maintenanc.e or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983, E-Operator Training & License Examination F-Administrative

.G-Operational Error (Explain) i II-Other (Explain)

P 4

m...