ML20086A271

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1991 for Jm Farley Unit 1 & Revised Monthly Operating Rept for Aug 1991
ML20086A271
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/13/1991
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086A274 List:
References
NUDOCS 9111190005
Download: ML20086A271 (1)


Text

-

,4

+]

't e e

J' f

. Alabama Power Comp:ny~

a i 4 '4

40 inverness C
nter Parkway.

Port Offica Box 129$,

Birmingham, Alacema 35?01-( =,

Telephone 205 B66 5581.

~

i W. Q. Heltsten. III 4

Senior Vlce President

, g3g3 ggp

-70 Nuclear Operations

-November _ 13 -1991 the southem etectre system 41 o

y Docket No. 50-348?

U.; S.__ Nuclear Regulatory Commission ATT*!:~ Document Control-Desk Washington, D. C.

20555-Joseph M; Farley Nuclear Plant Unit 1 Monthlv Operatino Data Report Oentlemen:-

t.ttacnad is the October 1991 Monthly Operating Report for_ Joseph M. Farley

. iNucitar, Plant Unit.1,-- as required _by Section 6.9.1.10- of the -Technical LSptcitications --.Also included isla revision to the August 1991 Unit 1 Operating: Data Report correcting.the number of hours the reactor was Cr1 &1 Cal. -

~

l1E y have.any: questions,--please advise.

Respectfully submitted,

-[flzf/$'mw:V 2

W. L Hariston, III

-LAEJ:edb5168 -

r/,

Attachments

~

O cc:, Mr.:S.=0.- Ebneter Mr.-S.;T.-Hoffman-

}

-Mr.-G. F. Maxwell-s 3.m L

b d000,79 fgp 9111190005 911[13 Cl

~

DR

-ADOCK-03000349 p~

PDR

~

~

- _ _ _ _.