Forwards Detailed Control Room Design Review Program Plan for Peach Bottom Atomic Power Station, in Response to Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability (Generic Ltr 82-33) & Generic Ltr 83-18
ML20085N615
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/31/1983
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20085N628 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, GL-83-18, NUDOCS 8311110136
Download: ML20085N615 (2)


Text

_ _ _ _ _ _ . _ _ _ . __ ____ ____

PHILADELPHIA ELECTRIC COMPANY  ;

2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 SHIELDS L. DALTROFF ELECTm C Pm CION October 31, 1983 Docket Nos. 50-277 50-278 Mr. Darrell G. Eisenhut Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Peach Bottom Atomic Power Station Program Plan for Control Room Design Review (NUREG-0737, Supplement 1)

References:

(1) Supplement 1 to NUREG-0737 - Requirements for Emergency Response Capability (Generic Letter No. 82-33) dated December 17, 1982 (2) NRC Staff Review of BWR Owners' Group Control Room Survey Program (Generic Letter 83-18) dated April 19, 1982 (3) Correspondence dated April 15, 1983, S. L. Daltroff, PECo, to D. G. Eisenhut, NRC

Dear Mr. Eisenhut:

This letter transmits the attached document titled,

" Detailed Control Room Design Review Program Plan for Philadelphia Electric Company's Peach Bottom Atomic Power Station". The document describes the program for identifying needed improvements in the design of the control room and provides the information requested by Section 5.7.a of Reference 1, and Item (a) of Reference 2. Additionally, the document describes the method for implementing Items (b) through (e) of Reference 2. The document supersedes the description of the Peach Bottom Control Room Design Review Program Plan submitted in Attachment II of Reference 3.

8311110136 831031 hDRADDCK 05000277 8 0$

PDR I \

Mr. Darrell G. Eisenhut Page 2 ,

1 i

1 1

I Our plans for performing the CRDR at Limerick and Peach

Bottom Stations, utilizing a common Human Factors Engineering consultant firm, was described in correspondence dated September

) 14, 1983 (J. W. Gallagher, PECo, to D. G. Eisenhut). The plan

. was submitted on the Limerick docket on August 31, 1983 (J. S.

Kemper, PECo, to A. Schwencer, NRC). Subsequently, several editorial changes have been made in the attached document,

submitted on the Peach Bottom docket. Additionally, figure 3 of the attached document has been modified to exclude the ,

requirement for a mockup of the control room. The decision

, regarding the need for a mockup will be deferred until we have determined the number and extent of modifications to be made. As committed to in the September 14, 1983 letter, we propose to i submit a summary report of the completed review outlining proposed control room improvements by March 15, 1985.

t Should you have any questions regarding this matter, please do not hesitate to contact us.

4 I

Very truly yours, i

/, ^ [

.f /

,/