ML20085N382

From kanterella
Jump to navigation Jump to search
Forwards Results of Requalification Exam 50-443/91-31 Conducted During Wk of 911021,per NUREG-1021,Rev 6.All Eight Operators Completed All Portions of Exam.Job Performance Measure Procedures Will Be Revised by 920228
ML20085N382
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/04/1991
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
RTR-NUREG-1021 NYN-91181, NUDOCS 9111150051
Download: ML20085N382 (4)


Text

,

~.. -

~. -, ~,. -,~

- ~.....

)

w

_.l

%w Fjampshiro Yankee

=&"-

Chief Eme<viive Off::er t

4 NYN 91181 November 4,1991

.=

Mr. Thomas T, Martir.

Regional Administrator United State ls Nuclear Regulatory Commission Region !

' 475 Allendale~ Road

- King of Prussia, PA' 19406

Reference:

Facility Operating License NPF-86, Docket No. 50-443

Subject:

Facility Results for Requalification Examination 9131

Dear Mr. Martin:

The facility results for Requalification Examination 9131, which was conducted at Seabrook Station.during the week of October 21,1991, are provided in the Enclosure. The examination' was conducted in accordance with the f Examiners Standard, NUREG 1021 Rev, 6, 'This-information war-requested by Lead Examiner, Kerry thnen of your staff.

.Should you i, ave any questions concerning this evaluation, please contact Mr. Peter

' M. Richardson, Training Manager, at (603) 47409521, extension 2605.

- Ve y -(*uly yours,

1;

.)

Ted C, F 'genbaum-Enclosure-TCF:PMR/act

' New Hampshire Yankee Division of Public Service Company of New Hampshire fgf//d P.O. Box 300

  • Seabrook, NH 03874
  • Telephone (603) 474 9521 y

.9111150051 911104 iPDR-ADOCK 05000443 M

EDR

_____,4._-,_.

.. ~ -. _

Un'ited States' Nuclear Regulatory Commission November 4,1991 Attention: Mr. Thomas T, Martin Page two ec:

Mr. Kerry Ihnen United States Nuclear Regulatory Commission 475 Allendale Road

- King of Prussia, PA 19406 Mr. Noel Dudley NRC Senior Resident inspector P.O. Box ' 1149 Seabrook, NH 03874 Mr. Peter W. Escigroth, Chief Pressarized Water Reactor Section United States Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 60cumehidsntr$IIkiesb'i '

U$ited States Nuclear Regulatory Commission Washington, DC 20555 4

e

i New llampshire Yankee November 4,- 1991 ENCLOSURE TO NYN-91181 Results for Requalification Examination 9131

}

.m..

i.---.--.- -.... - -., -

New Hampshire Yankee e

November 4,1991 The Nuclear Regulatory Commission (NRC) audited Licensed Operator Requalification Training (LORT) annual examination, conducted during the week of October 21,1991, was the first such examination of operators at New Hampshire Yankee (NHY), using Alternative B of the Examiners Standard, NUREG 1021, Rev. 6.

Eight ope.ators, consisting of one operating crew and one staff crew, were examined.

The Annual Requalification Examination consist of three parts: Job Performance Measures (J PMs), Simulator Demonstrative Examinations, and a Written Examination. The written examination is a two section examination consisting of Section A: Static Simulator and Section B: Limits and Controls.

All eight operators completed all sections of the examination. The results of each section of the examination are provided below.

Total Number Individual JPM of JPMs Pass / Fall Job Performance Measures 40 40/0 Individual Crew Pass / Fail Past! Fail Simulator Demonstrative 8/0 2/0 Examinations Pass / Fail Written Examinations 8/0 SUMM ARY-Two procedures that were used during the performance of the Job Performance Measures were determined to require enhancement. These procedures are being evaluated by Reactor Engineering. It is anticipated that the procedures will be revised by February 28, 1992.

o

__