ML20085K665
| ML20085K665 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/10/1983 |
| From: | Wells D DETROIT EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, EF2-65287, NUDOCS 8310210066 | |
| Download: ML20085K665 (2) | |
Text
6 x
h 0,$
Donald A. Wells Mamer Qua'ay Assurance om mes' 6
gg Edison BEE 5==
October 10, 1983 EF2-65287 Mr. James G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Cmmission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Report of 10CFR50.55(e) Its on Unacceptable Contractor Practice regarding Ultrasonic Testing of Flued Head Structures (#100)
Dear Mr. Keppler:
On September 9,1983, Detroit Edison's Mr. W.R. Wingfield, Quality Engineer - Construction Quality Assurance telephoned Mr. J. Konklin of NRC Region III to report on unacceptable contractor practices regarding Ultrasonic Testing (UT) of Flued Head structures.
A problem was identified concerning a site contractor's (Wismer and Becker) Ultrasonic Testing practices. The problem is inconsistent implementation of the UT procedure, inconsistency in technique utilization, and a deficiency in their Quality Control program by which known deficiencies were not reported in a timely manner.
This has affected remedial and preventative corrective action.
(i.e.
Rejectable UT reports over one and a half years old had not been processed, nor had the rejectable item been repaired).
The extent of the problem, and the safety implications have not yet been determined. An investigation is continuing.
Another report on this item, either interim or final, will be sent when further infor: nation is availabic. If you have questions con-cerning this matter, please contact Mr. G.M. Trahey, Assistant Director - Project Quality Assurance.
Very truly yours, k.-
l}
DAW /EHN/pn Ah k
10
~<
B310210066 831010 PDR ADOCK 05000341 S
PDR OCT 171983
.o Mr. James G. Keppler, Regional Adninistrator October 10, 1983 EF2-65287 Page Two cc:
Mr. Richard DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Ca mission Washington, D.C.
20555 Mr. Paul Byron, Senior Resident Inspector U.S. Nuclear Regulatory Ccmnission 6450 North Dixie Highway Newport, Michigan 48166