Interim Deficiency Rept CP-91-006 Re Potential Failure of Limitorque 8-ft-lb Motors to Meet Rated Capacity During Max Expected Differential Pressure Valve Operation.Initially Reported on 910926.Next Rept Will Be Submitted by 911216
ML20085K153
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/25/1991
From: William Cahill, Webb Patricia Walker
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-91-006, CP-91-6, TXX-91399, NUDOCS 9110300172
Download: ML20085K153 (1)


Text

-

~

Log # TXX-91399 Fi1e # 10110 C

C 905.4 908.3 711 ELECTRIC GL 89-10 Ref. # 10CFR50.55(e) w m J. c a m,3,.

October 25, 1991

<;~., va, r,w,,,,

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

'0MANCHE PEAK STEAM ELECTRIC STATION (CPSES) UNIT 2 00CKET NO. 50-446 POTENTIAL FAILURE Of LIMITORQUE MOTOR OPERMOR DURING DESIGN BASIS CONDITIONS SDAR: CP-91-006 (INTERIM REPORT)

Gentlemen:

On September 26, 1991, TU Elt tric orally notified your Mr. C. Johnson of a deficiency involvin{.5e potential failure of Limitorque 80 ft-lb motort to meet rated capacity ( ring mximum expected differential pressure valve operation. This is an interim report of a potentially reportable item under the provisions cf 10CFR50.55(e).

TU Electric is continu'ig the evaluation of this issue's impact upon the safety of plant operations.

TU Electric's next report on this issue will bc submitted by December 16, 1991.

Sincerely, led 4 h f?.

William J. Canill, Jr.

By:

M he

~

Roger' O. WalPe-Manager of Nucle 6r titensing JLR/gj c: Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (2) 9110300172 911025

(\\

DR ADOCK 0500' 6

g

/p

> b 400 N. Olive Street LB. 81 Dallas. Texas 75201 j