Telecopy Ro:On 731214,while Conducting Routine post-maint Surveillance,Diesel Generator Cooling Water Pump Breaker Tripped.Investigation Underway
ML20085K119
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/14/1973
From: Worden W
COMMONWEALTH EDISON CO.
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085K115 List:
References
NUDOCS 8310200084
Download: ML20085K119 (1)


Text

.

06 .

O P

Yt.Y5?b.hh$0$Y\EB?ldM

/ ETM _

50-249

  • g i973 DEC 14 p!4 2 51 Cog USAEC HQS GTWN WU WSH U.S. ATOM'C ENERGY COMM.

TLX A 10 9 W AB 123( 1349 )( 1 -0156 99C 348002 )PD 12/v(k}'YI3 1346 ICS IPMVEI6 MVN Ee079 TDVE MORRIS ILL 126 12-14 Il37A CSh

, PMS MR J r O'8#auv

_ DIRECTOR DIRECTORITE OF LICENSING U S ATOMIC ENERGY COMMISSION WUX -

i WASHDC 20 545 SUBJEC T DPR-25 DRESDEN NUCLEAR POWER STATI ON UNI T 3.

THIS WILL CONFIRM A CONVERSATION WITH MR MAURA 0F YOUR OFFICE AT 1030 HOURS TKIS DATE CONCERNING A FAILURE OF THE UNIT 3 DIESEL ENERATOR COOLING WATER PUMP. ON DECEMBER 14, 1973 AT 0P05 HOURS 1+11LE CONDUCTING ROUTINE POS T-MAINTENANCE SURVEILLANCE OF THE UNIT 3 DIESEL GENERATOR THE 480 VOLT BREAKER FEEDING THE COOLING WATER PUMP TRIPPED CAUSING THE DIESEL GENERATOR TO TRIP ON HIGH TEMP ERA TURE.

ALL SYSTEMS REQUIRED TO 8E OPERA 6LE WHEN THE UNIT 3

_ DI ESEL IS OUT OF SERVICE WERE,IMMEDIATELY TESTED AND VEhlFIED TO BE O'ERAdLE. AN INVESTIGATION INTO THE CAUSE OF THE COOLING WATER PUMP FEED 8REAKER TRIP IS UNDERWAY AT THIS TIME. -

W P WORDEN, SUPERINTENDENT y

DRESDEN NUCLEAR POWER STATION  %

COMMONWEALTH EDISON COMPANY h ROUTE 1

MORRIS ILLINOIS 8N ' O f- 1' r

{  :

. 4, w'

.___. .s...--- .wm li # C ':- g [

,. 1 R ; '.

k f ~

226P .' ES T . v l

'

  • k .yt.> + T 892G 8310200084 73122i /b }y1 '

h PDR ADOCK 05000249 g PDR g pyn.bLNi REGION _

.