Forwards Emergency Response Data Sys Implementation Plan Milestones,Per Rev 1 to NUREG-1394.Sys Will Be Installed by 930213
ML20085K076
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/22/1991
From: Randolph G
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1394 ULNRC-2503, NUDOCS 9110300127
Download: ML20085K076 (2)


Text

..

c')'

  • 1 Cawnha Pcs Que &a Fin l Fuimn. W w CE?5!

1 ' -

October 22,1991 UYlON Euenue

$ ULNRC-2503 U. S, Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, D. C. 20555 Gentlemen:

DOCKET NUMBER 50-483 CAL.LAWAY PLANT EMERGENCY RESPONSE DATA SYSTEM IMI'LEMENTATION PLAN MILESTONE & SCllEDUI E As required by a recent amendment to the Code of Federal Regulations Title 10 Part 50 (10 CFR50, Appendix E.XI) and by NUREG-1394, Rev,1, Union Electric submits the attached Emergency Response Data System (ERDS) Implementation Plan Milestones which should ensure implementation of the system at the Callaway Plant by February 13,1993.

Callaway is a single computer feeder site with the Plant Computer System (PCS) located in the Computer Room near the Control Room. The ERDS modem will be located in the Computer Room.

The ERDS system will have the capability to be activated in the TSC, EOF, Control Room, and Computer Room and will be password protected to prevent inadvertent activation. Other details will be proviled in the Data Point Library and Plant Attribute Library as indicated on the attached milestone schedule.

Pl:ase contact Mr. Al White, Supenisor, Emergency Preparedness, (314) ti76-8261, or M r. Eric Schulte, Engineer, Computer Support, (314) 676-8486, for follow-up discussion or questions.

h G. L Randolph Vice President - Nuclear Operations GLR / MAS /ams Attachment cc: A. B. Davis, Regional Administrator, USNRC Region til R. L llague, Chief, Reactor Projects Section 3C, USNRC Region til M. D. Lynch, USNRC , Licensing Projects Manager (2 copics)

Manager, Electric Department, Missouri Public Service Commission B. L Bartlett, Senior Resident Inspector Shaw, Pittman, Potts, & Trowbridge

~

g} l 951(500i@ 9110 M PDR f4 DOCK 0500g3 F

. . ~j' o

" . A*lTACllhtENT EhtERGENCY RESPONSE DATA SYSTEM INSTALLATION PI AN MILESTONE SClf 5?DUIE August 13,1991 Final Rule for Emergency Response Data Sptem (ERDS) published in Federal Register September 12,1991 Rule for ERDS becomes effective October 9,1991 Utility, NRC, and llalliburton NUS personnel meet to discuss implementation Plan, Site Survey Questionnaire, Data Point Library (DPL), Plant Attribute Library (PAL), and other pertinent questions.

(Utility and NRC action)

October 23,1992 ERDS Implementation Plan hiilestone Schedule submitted to NRC (Utility action)

January 2,1992 Submit Data Point Library (DPL) and Plant Attribute Library (PAL) to NRC (Utility action)

' February,1992 Phone line installed and modern supplied (NRC action)

March 1,1992 Complete development of computer progrnm that sends the data to ERDS (Utility action)

' July,1992 Preliminary software test complete (Utility and NRC action)

  • August,1992 Final site acceptance test complete (Utility and NRC action)

August 15,1992 Revision of Emergency Plan implementing Procedure for activation of ERDS complete (Utility action)

Revision of Communications Test procedures for periodic testing of ERDS completed (Utility action)

Revision of Procedures controlling plant computer changes to allow NRC review of changes affecti .g the ERDS, (Utility action)

September 1,1992 Callaway Plant Emergency Response Data System on-line

' Dates subject to change based on NRC and llalliburton NUS availability