ML20085K011
ML20085K011 | |
Person / Time | |
---|---|
Site: | Dresden, Duane Arnold, 05000000 |
Issue date: | 04/29/1974 |
From: | Abel J COMMONWEALTH EDISON CO. |
To: | Skovholt D US ATOMIC ENERGY COMMISSION (AEC) |
Shared Package | |
ML20085K016 | List: |
References | |
NUDOCS 8310190308 | |
Download: ML20085K011 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N5521999-10-21021 October 1999
[Table view]Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses ML20217H8921999-10-18018 October 1999 Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217F4801999-10-14014 October 1999 Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request ML20217F7221999-10-0707 October 1999 Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted ML20212L0411999-10-0505 October 1999 Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 ML20217A9331999-09-30030 September 1999 Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl ML20212J8761999-09-30030 September 1999 Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212H2121999-09-27027 September 1999 Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20212H2151999-09-22022 September 1999 Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 ML20212A8711999-09-14014 September 1999 Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20211M5621999-09-0202 September 1999 Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F7831999-08-26026 August 1999 Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV ML20210V1231999-08-17017 August 1999 Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program ML20211A8731999-08-16016 August 1999 Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L1061999-08-0202 August 1999 Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable ML20210L8311999-07-27027 July 1999 Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/As ML20210E9781999-07-26026 July 1999 Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6) ML20210E1431999-07-22022 July 1999 Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout Encl NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 ML20210B7161999-07-20020 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01 NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210B5271999-07-16016 July 1999 Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209E8401999-07-13013 July 1999 Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 ML20209G4991999-07-12012 July 1999 Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations Noted 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217H4661999-10-18018 October 1999
[Table view]Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041999-07-0101 July 1999 Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl1999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests1999-06-23023 June 1999 Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests ML20196F9531999-06-21021 June 1999 Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs NG-99-0468, Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center1999-06-0303 June 1999 Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center NG-99-0625, Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b)1999-05-24024 May 1999 Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b) ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB NG-99-0741, Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed1999-05-19019 May 1999 Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed NG-99-0700, Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6)1999-05-17017 May 1999 Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6) ML20206S7951999-05-11011 May 1999 Informs That Temporary Addendum to DAEC Security Plan Is No Longer Required & Should Be Removed.Addendum Was Transmitted to NRC in 981015 Licensee Ltr NG-99-0664, Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.7901999-05-10010 May 1999 Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.790 ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape NG-99-0636, Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements1999-04-29029 April 1999 Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements NG-99-0633, Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs1999-04-29029 April 1999 Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs NG-99-0605, Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center1999-04-28028 April 1999 Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center NG-99-0622, Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl1999-04-28028 April 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl ML20206B1501999-04-22022 April 1999 Forwards 1998 Occupational Radiation Exposure for Dresden Nuclear Power Station,Units 1,2 & 3. Rept Was Revised to Rept Only Individual Radiation Exposures Greater than 100 Mrem ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 1999-09-09 Category:UTILITY TO NRC MONTHYEARNG-90-2226, Forwards Proposed Operator Licensing Exam Schedule for FY91- FY94 in Response to Generic Ltr 90-071990-09-17017 September 1990
[Table view]Forwards Proposed Operator Licensing Exam Schedule for FY91- FY94 in Response to Generic Ltr 90-07 ML20059F0311990-08-27027 August 1990 Provides Schedule for Completion of Installation of Mods to Plants Reactor Water Level Instrumentation,Per Generic Ltr 84-23.Penetrations Will Be Installed During Outage 13 for Dresden & During Outage 12 for Quad-Cities NG-90-2088, Forwards Summary of Root Cause & Corrective Action Plan Re Operator Requalification Training Program,Per NRC 900713 Confirmatory Action Ltr CAL-RIII-90-131990-08-25025 August 1990 Forwards Summary of Root Cause & Corrective Action Plan Re Operator Requalification Training Program,Per NRC 900713 Confirmatory Action Ltr CAL-RIII-90-13 ML1124202601990-08-17017 August 1990 Forwards Summary of Changes Omitted from 900814 Transmittal of Emergency Plan NG-90-1894, Forwards Licensed Operator Requalification Exams & Evaluations for Accelerated Remedial & Enhanced Training1990-08-0101 August 1990 Forwards Licensed Operator Requalification Exams & Evaluations for Accelerated Remedial & Enhanced Training ML1122122061990-07-27027 July 1990 Forwards Exams & Evaluations for Licensed Operator Requalification Documentation of Remedial & Enhanced Training.Both Types of Training Conducted in Segments of 30 H & 20 H.Encl Withheld ML20055H7631990-07-25025 July 1990 Forwards Financial Info Re Decommissioning of Plants ML1122122001990-07-20020 July 1990 Forwards Licensed Operator Requalification Documentation of Remedial & Enhanced Training,Per 900713 Confirmatory Action Ltr.Encl Withheld NG-90-1741, Discusses Collateral Operator Duties for Reactor Operators Restricted from Performing Licensed Activities.Individuals Will Perform in Support Role Until Such Time as Remedial Training & Followup Testing Completed to Restore License1990-07-13013 July 1990 Discusses Collateral Operator Duties for Reactor Operators Restricted from Performing Licensed Activities.Individuals Will Perform in Support Role Until Such Time as Remedial Training & Followup Testing Completed to Restore License ML17202L2861990-07-0202 July 1990 Forwards Dresden II Upper Vessel Contract Variation Review, La Salle II Upper Vessel Fabrication Summary & Quad-Cities II Upper Vessel Fabrication Summary. ML20043H2471990-06-18018 June 1990 Forwards Description of Security Plan Change SPC-24, Evaluation of Change W/Respect to 10CFR50.54(p),security Plan & Security Plan Addendum Re Intake Structure Mods.Encl Withheld (Ref 10CFR73.21) ML20043D3231990-06-0101 June 1990 Forwards Rev 31 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043C8181990-05-30030 May 1990 Forwards Rev 1 to Core Operating Limits Rept,Dresden Station Unit 2,Cycle 12. Rev Reflects MCPR Limit Adjustment for Cycle 12 Due to Number of Reused Channels,Per Discussion of Channel Bow Effects in BWRs in NRC Bulletin 90-002 ML20042E6381990-04-20020 April 1990 Forwards Environ Radiological Monitoring Program for Duane Arnold Energy Ctr,Annual Rept - Part I Summary & Interpretation,Jan-Dec 1989. ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML20011F7961990-02-28028 February 1990 Forwards Rev 23 to Plant Security Plan & Contingency Plan, Incorporating Numerous Editorial Changes & Upgrades made-to- Date on Perimeter Barrier Surrounding Plant Protected Area. Rev Withheld (Ref 10CFR73.21) ML18094B3221990-02-28028 February 1990 Forwards Executed Amend 14 to Indemnity Agreement B-74 ML15217A1031990-02-28028 February 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals ML20011F3821990-02-26026 February 1990 Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices ML20006G0621990-02-22022 February 1990 Forwards Revised Proprietary Pages to DPC-NE-2004, Core Thermal Hydraulic Methodology Using VIPRE-01, Reflecting Minor Methodology Changes Made During Review & Approval Process.Pages Withheld ML20006E1441990-02-16016 February 1990 Forwards Suppl to Rev 1 to Updated FSAR for Braidwood Station,Units 1 & 2 & Byron Station,Units 1 & 2,per 881214 & 891214 Submittals ML20006E9071990-02-16016 February 1990 Discusses Plants Design Control Program.Util Adopted Concept of Design Change Implementation Package (Dcip).Dcip Will Contain or Ref Design Change Notice Prepared Per Approved Procedures ML20006E4201990-02-14014 February 1990 Requests NRC Approval for Use of Alloy 690 Steam Generator Tube Plugs for Facility,Prior to 900301,pending Final ASME Approval of Code Case for Alloy 690 ML20011E6151990-02-12012 February 1990 Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21) ML20006D9781990-02-0909 February 1990 Responds to Notice of Violation & Proposed Imposition of Civil Penalty Transmitted in NRC 900110 Ltr.Corrective Actions:Secondary Containment Operability Test Revised to Require Securing Main Plant Exhaust Sys During Test ML20011E4991990-02-0606 February 1990 Discusses Liability & Funding Requirements Re NRC Decommissioning Funding Rules & Verifies Understanding of Rules.Ltr from NRC Explaining Liability & Requirements of Rule Requested ML17202G7741990-02-0505 February 1990 Forwards Core Operating Limits Rept,Dresden Station Unit 2,Cycle 12,Rev 0 & Core Operating Limits Rept,Dresden Station Unit 3,Cycle 12,Rev 0. Cycle 12 Startup Expected on 900210 ML20006D6911990-02-0202 February 1990 Provides Alternative Design Solution to Dcrdr Implementation at Facilities.Simpler Design Devised,Using Eyelet Screw Inserted in Switch Nameplate Which Is Identical to Providing Caution Cards in Close Proximity to Switch Handle ML20006C5661990-01-31031 January 1990 Provides Certification Re Implementation of Fitness for Duty Program Per 10CFR26 at Plants ML18153C0951990-01-29029 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Belief in Appropriateness to Address Generic Ltr 89-13 Concerns within Context of Established Programmatic Improvements Noted ML20006B7961990-01-29029 January 1990 Forwards Summaries of Latest ECCS Evaluation Model Changes ML20006C6711990-01-29029 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Plants Have Established Preventive Maint Program for Intake Structure & Routine Treatment of Svc Water Sys W/Biocide to Control Biofouling ML20006D6611990-01-29029 January 1990 Advises That 900117 License Amend Request to Remove Certain cycle-specific Parameter Limits from Tech Specs Inadvertently Utilized Outdated Tech Specs Pages.Requests That Tech Specs Changes Made Via Amends 101/83 Be Deleted ML20011E2521990-01-29029 January 1990 Forwards Proprietary Safety Analysis Physics Parameters & Multidimensional Reactor Transients Methodology. Three Repts Describing EPRI Computer Code Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790) ML20006D2431990-01-26026 January 1990 Provides Info Re Emergency Response Organization Exercises for Plants.Exercises & Callouts Would Necessitate Activation of Combined Emergency Operations Facility Approx Eight Times Per Yr,W/Some Being Performed off-hours & Unannounced ML18153C0871990-01-26026 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures to Be Revised & Familiarization Sessions Will Be Conducted Prior to Each Refueling Outage ML18094B2861990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Aggressive Program of Monitoring,Insp & Matl Replacement Initiated in Advance of Generic Ltr 89-13 Issuance ML20006B9551990-01-26026 January 1990 Responds to NRC 891227 Ltr Re Violations & Proposed Imposition of Civil Penalty.Corrective Actions:Fourteen Improperly Insulated Splices Repaired Per Facility Environ Qualification Program ML19354E6711990-01-24024 January 1990 Requests Approval to Use Alloy 690 Plugs as Alternative to Requirements of 10CFR55(a),codes & Stds for Plants Prior to 900226 ML17347B5451990-01-24024 January 1990 Informs of Plans to Apply ASME Code Case N-356 at Plants to Allow Certification Period to Be Extended to 5 Yrs.Rev to Inservice Insp Programs Will Include Use of Code Case ML19354E4451990-01-22022 January 1990 Submits Update on Status of RHR Sys Iconic Display at Facilities,Per Generic Ltr 88-17 Re Loss of Dhr.Computer Graphics Display Data in Real Time & Reflect Status of Refueling Water Level & RHR Pump Parameters ML19354E4461990-01-22022 January 1990 Forwards Proprietary Rev 1 to DPC-NE-2001, Fuel Mechanical Reload Analysis Methodology for MARK-BW Fuel, Adding Section Re ECCS Analysis Interface Criteria & Making Associated Administrative Changes.Rev Withheld ML20005G7161990-01-20020 January 1990 Forwards Rev 1 to Updated FSAR for Braidwood & Byron Units 1 & 2.Changes in Rev 1 Include Facility & Procedures Which Were in Effect as of 890610.W/o Encl ML20006A8001990-01-19019 January 1990 Forwards Response to NRC 891220 Ltr Re Violations Noted in Plant Insps.Response Withheld (Ref 10CFR73.21) ML16152A9091990-01-18018 January 1990 Forwards Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. W/900131 Release Memo ML18153C0771990-01-17017 January 1990 Forwards North Anna Power Station Emergency Plan Table 5.1, 'Min Staffing Requirements for Emergencies' & Surry... Table 5.1, 'Min Staffing Requirements...', for Approval,Per 10CFR50.54(q),NUREG-0654 & NUREG-0737,Suppl 1 ML20006A2011990-01-16016 January 1990 Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel in Anchor Darling Swing Check Valves.Eight Subj Valves Identified in Peach Bottom Units 1 & 2 & Will Be Returned to Mfg ML18153C0731990-01-15015 January 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High-Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or or Valves.... Util Replaced Studs in twenty-five Valves ML20006B8821990-01-10010 January 1990 Reissued Ltr Correcting Date of Util Ltr to NRC Which Forwarded Updated FSAR for Byron/Braidwood Plants from 881214 to 891214.W/o Updated FSARs ML20005G6431990-01-10010 January 1990 Responds to Generic Ltr 89-21 Re Implementation of USI Requirements,Consisting of Revised Page to 891128 Response, Moving SER Ref from USI A-10 to A-12 for Braidwood 1990-09-17 |
Text
-
^~.
i C:mm . lth Edis n one First_ _. >nal Pia:LCycago._iny.py O
W g',. / Address Reply to: Post Othee Box 767
% Chicago Ilknois 60600 April 29, 1974 g b Mr. D. J. Skovholt Assistant Director for 2 , $[ '
(
hp 644-3j Operating Reactors Directorate of Licensing g-Office of Regulation 9
- E%".k%
1# ,,
U.S. Atomic Energy Commission co g' Washington, D.C. 20545 .
~
Subject:
Dresden Station Unit 3 Inspection of Fuel Assembly Lower Tie Plates - AEC Dkt 50-249
References:
(1) General Electric Report on Evaluation of Center Line Shrinkage Cracks in Bosses of Fuel Bundle Lower Tie Plates, Submitted in General Electric's letter to D. F. Knuth.
from J. D. Hinds dated August 29, 1973.
(2) Letter to D. L. Ziemann from J. S. Abel dated November 5, 1973.
Subject:
Dresden Station Unit 3 Potential Hairline Cracks in Fuel Assembly Lower Tie Plates.
(3) Letter from D. J. Skovholt to J. S. Abel dated February 15, 1974
Dear Mr. Skovholt:
In response to Reference 3,.an inspection of the lower tie plates on 16 of the Dresden Unit 3 Reload 1 fuel assemblies was conducted on April 11 and 12, 1974. The results of this inspection.are. submitted-for your information.
A visual examination was made using a borescope, with the optics as near as possible to the lower tie plates.
Prior to each inspection, the lower tie plates were brushed.to remove any crud deposited during operation. This provided a good, clear view of the lower tie plates. The inspection included a detailed examination of all the peripheral tie plate bosse's for hairline cracking and a thorough survey of-the remainder of the lower tie plate, covering an area approximately two inches below the tie plate channel' ledge. I
~y! [-
$5AkT8?Poggggg,,
,,g, f,h,Y
....fv M ,
t _ . . _ _ _ _ _ . _ _ _ . . . _ _ _ _ _ _ . _ _ _ . . . . . _ _ . _ _ . . . _ _ _ . _ _ . _ . . _ _ _ _ . _
~
i OcommouwenitataisoocomSr Mr. D. J. Skovholt ,
April 29, 1974 I
t In general, the tie plates were in excellent condition !
with no evidence of any cracking. The inspection procedure and results are on file at Dresden Station and available for your review.
The lower tie plates on the following bundles were inspected:
- 1) GEB 054 9) GEB 086 '
1 2) GEB 056 10) GEB 089
- 3) GEB 058 11) GEB 091
- 4) GEB 063 12) GEB 092
, 5) GEB 068 13) GEB 096
- 6) GEB 074 14) GEB 099 .
- 7) GEB 077 15) GEB 100
- 8) GEB 079 16) GEB 103 As indicated in References 1, 2 and 3, possible cracking in the lower tie plates has been analyzed and is.of ,
no safety consequence. This is a more than adequate basis for considering the 27 suspect fuel assemblies as normal assemblies requiring no further special action.
One signed original and 39 copies of this report are submitted for your information.
Very truly yours,
. S. Abel Nuclear Licensing Administrator Boiling Water Reactors l