ML20085H575

From kanterella
Jump to navigation Jump to search
Second Interim Rept Re Significant Deficiency 83-03 Concerning Potential for Misoperation of DS-416 Reactor Trip Switchgear Undervoltage Attachments.Initially Reported on 830426.Westinghouse Task Force Results Expected by 840109
ML20085H575
Person / Time
Site: Beaver Valley
Issue date: 08/26/1983
From: Woolever E
DUQUESNE LIGHT CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-3-067, 2NRC-3-67, 83-03, 83-3, NUDOCS 8309120130
Download: ML20085H575 (4)


Text

- _ _.

L 2NRC-3-067 (412)787-5141 Telecopy 1 6

Nuclear Construction Division Robinson Plaza, Building 2, Suite 210 August 26, 1983 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Mr. Richard W. Starostecki Division of Project and Resident Programs

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Do cke t No. 50-412 Pot ent ial fo r Mi sope ra t ion of DS-416 Reactor Trip Switchge ar Undervoltage Attachments Significant Deficiency Report No. 83-03 Gentlemen:

The attached, Interim Report No. 2, is in reference to the potent ial for misoperation of DS-416 reactor trip switchgear undervoltage at t achme nt s reported to the Nuclear Regulatory Camission by S. D. Hall of Duqmsne Light Company (DLC) on April 26, 19 83.

Wes t inghouse has es t ab lished a task fo rce to evaluate this pr oblem.

When the result s of this evalua t ion are ava ilab le, DIE will issue anot her report on this subject.

It is expected that this report will be submitted to the Region I of fice by January 9,1984.

DI1QUESNE LIGHT COMPANY By

.P E. J. Woolever JMM/wjs Vice President At tachment cc:

Mr. R. DeYoung, Director Of fice of Inspect ion and Enforcement (3) (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment)

Ms. L. Lazo, Project Manager (w/ attachment)

NRC Docu;nent Control Desk (w/ attachment) rgg --

j"g INPO Records Center (w/ attachment)

BSCRIBED AN ORN TO BEFORE ME THIS

'my

%DAYOF mW

, 1983.

$6 l$W~MJ

/

Not ary Public

-Q ELVA G. LESONDAK, NOTARY PUBLIC Ob ROBINSON TOWNSHIP, ALLEGHENY COUNTY

$q O'

MY COMMISSION EXPIRES OCTOBER 20,1986 h1 m e.m l L t

. United ' States Nuclear Regulatory Conuniscion Dr. 'Ihonias E. Murley i

Page 2 COMMONWEALTH OF PENNSYLVANIA )

) SS:

COUNTY OF ALLEGHENY

)

On this 8 Q day of o,#

,75 8, before me, a Notary 7

Public in and for said Conunonwealg and County, ' personally appeared R. J.

Washabaugh, who being duly sworn deposed and said that (1) he is duly authorized to execute and file the foregoing Submittal on behalf of E. J.

Woolever, Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3)

I the statements set forth in the Submittal are tr'ie and correct to the best of his knowledge.

(

, Jef Notary Pflic j

l ELVA G. LESONDAK, NOTARY PUBLIC ROSINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPlRES OCTOBER 20,1986 1

i-

?

I l

t f

L l

I i

i.

i:

l i

~

d 4

=

,-e--

s~

.+e,,

,--.,.--r,,

,, -, -, - - ~,-

i---,-, -.,

--,.,.-.,-.-ea-

.r.%

,-m-.--*-

BEAVER VALLEY POWER STATION UNIT NO. 2 DUQUESNE LIGHT COMPANY Interim Report No. 2 on the Potential for Misoperation of DS-416 Reactor Trip Switchgear Undervolt age Attachment s L.

SUMMARY

On March 30, 1983, Wes tinghouse (W) advised af feeted opetating plant s of the potential for misoperation ofI)S-416 reactor trip switchgear undervol-t age at t achment s based on repo rt ed mal f unct ions at one pla nt during testing.

W advised operating plants on April 15, 1983, of an additional misopera-t ion of another DS-416 undervoltage at t achme nt.

Inves tigation of this eve nt reve aled a missing retaining ring on one of the two undervolt age attachment pivot shafts.

2.

IMMEDIATE ACTION TAKEN On April 20, 1983, W advised the Nuclear Regulatory Commission (NRC) of the potential for misoperation of DS-416 reactor trip switchgear undervol-t age at t achme nt s.

S.

D.

Hall, Duque sne Light Compa ny, not ified E.

Brunner, Region I of fice, on April 26, 1983, that an evaluation of this problem for Beaver Valley Unit No. 2 (BVPS-2) was underway.

3.

DESCRIFTION OF DEFICIENCY Based on repo rt ed mal funct ions at one plant during t es t ing, W advised af fected operating plants on March 30, 1933, of the pot ent ial fo r misope r-ation of DS-416 reactor trip switchgear undervolt age attachment s.

W began an evaluation of the input from several af fected operating pla nt s con-j cerning dimensiores of several clearances in the undervoltage attachment.

I On April 15, 1983, W advised operating plants of an additional misopera-t ion of another DS-416 undervoltage at t achment.

Investigation of this event revealed a missing retaining ring on one of the two undervolt age a t t achme nt pivot shafts.

This allowed the pivot shaft to move laterally such that one end came out of its guide hole in the frame of the undervol-tage attachment, and did not permit the attachment to operate on demand.

4.

ANALYSIS OF SAFETY IMPLICATIONS W evaluated the input from several af fected operating plant s concerning dimens ions of seve ral c le arances in the unde rvo lt age at t achme nt ani concluded that devi at ions from the recommended clearances could increase the pot ent ial fo r miso pe ra t ion of the a t t achme nt, the reby creating a condition wherein the reactor trip switchgear might not open on automatic demand from the reactor protection system.

The W evaluation of the retaining ri ng issue reve aled a discrepancy in design.

The gr oove in che shaft receiving the retaining ring was not l

increased in width to be consistent with an earlier (1972) retaining ring

design ch ange.

The new retaining ring is wider than the original design and does not seat prope rly in the existing gr ooves.

This disc repancy increases the pot ent ial fo r misope ra t ion of the DS-416 unde rvo lt age

]

a t t achme nt, thereby creating a condition wherein the reactor trip switch-gear might not open on automatic demand from the reacto r prot ect ion system.

5.

CORRECTIVE ACTION TO REMEDY DEFICIENCIES Westinghouse has established a special task force to evaluate this problem and the corrective action required to remedy the deficiency.

BVPS-2 will issue another report on this subject when the results of this evaluation are available.

6.

ADDITIONAL REPORTS i

It is expect ed that a subsequent repo rt on this matter will be submitted l

to the Region I office by January 9,1984.