Licensee Performance Review https://www.nrc.gov/about-nrc/contactus.html Westinghouse Electric Company Columbia Fuel Fabrication Facility (CFFF)

March 31, 2020 6:00 PM (EDT)

ML20085G909

Agenda https://www.nrc.gov/about-nrc/contactus.html NRC Our Mission NRC How We Regulate NRC Performance Review Results CFFF Westinghouse Remarks NRC Adjourn Business Portion NRC Question & Answer with Public NRC Adjourn Meeting

Our Mission https://www.nrc.gov/about-nrc/contactus.html

How We Regulate Inspections Investigations Allegations Incident

Response

Enforcement Performance Assessment https://www.nrc.gov/about-nrc/regulatory.html

https://www.nrc.gov/about-nrc/contactus.html IMC 2600 - Fuel Cycle Facility Operational Safety and Safeguards Inspection Program Baseline (Core)

Reactive Supplemental 12 Inspection Areas for Category III Facilities Inspection Program

How We Regulate Inspections Investigations Allegations Incident

Response

Enforcement Performance Assessment https://www.nrc.gov/about-nrc/regulatory.html

Licensee Performance Review Process IMC 2604 - Licensee Performance Review Plant Events Safety Significance Assessment Reactive Inspections Inspection Follow-up Emergent Performance or Generic Safety Issues Assessment Inspection Program Adjustment Inputs NRC Review Results NRC Response Other NRC Actions

  • Enforcement Actions
  • Previous Performance
  • Safety Significance
  • Performance Trends
  • Cross Cutting Issues
  • Corrective Actions No Performance Issues
  • Core Insp. Program
  • Inform the Public Area Needing Improvement (ANI)
  • Insp. Program Changes
  • LPR Frequency
  • Inform the Public Or LPR = Licensee Performance Review Performance Areas

LPR Results https://www.nrc.gov/about-nrc/contactus.html Assessment Period January 1, 2019 - December 31, 2019

https://www.nrc.gov/about-nrc/contactus.html 2019 Inspection Summary 6

Core Inspections 11 Modules 9

Event Follow-ups 7

CO Items Inspected 17 Inspectors 546 hours0.00632 days <br />0.152 hours <br />9.027778e-4 weeks <br />2.07753e-4 months <br />

Notable Issues https://www.nrc.gov/about-nrc/contactus.html SAFEGUARDS Two SL IV violations were issued in inspection report 70-1151/2019-401 (details not released to public, both remain open)

RADIOLOGICAL CONTROLS One SL IV violation was issued in inspection report 70-1151/2019-004 for licensees failure to perform adequate surveys on outgoing shipments of 30B cylinders (now closed)

SAFETY OPERATIONS None FACILITY SUPPORT None OTHER AREAS None

Plant Events No program adjustment warranted or ANI identified The NRC identified three SL IV violations They were not all in the same performance area The causes were not similar The NRC grouped the events across performance areas No cross-cutting issues No need for additional focus by the licensee or NRC at this time The NRC followed up on nine events (six reportable)

No safety-significant issues No security-significant issues https://www.nrc.gov/about-nrc/contactus.html

Previous Area Needing Improvement (ANI) https://www.nrc.gov/about-nrc/contactus.html

  • In 2017, an ANI was identified in Safety Operations, due to a safety significant issue involving the S-1030 scrubber.
  • The identified supplemental inspection activities associated with the ANI were completed in 2018, and earlier this year the inspection activities associated with the Confirmatory Order (CO) were also completed.

The ANI is closed.

The commitments detailed in the CO have been implemented.

https://www.nrc.gov/about-nrc/contactus.html Summary

  • No additional ANI was identified in any performance assessment area
  • NRC will conduct the core (routine) inspection program in the next performance assessment cycle (January 1, 2020 - December 31, 2021)

Westinghouse Remarks https://www.nrc.gov/about-nrc/contactus.html

Informal Question and Answer Session between the NRC and the Public https://www.nrc.gov/about-nrc/contactus.html

Closing Remarks https://www.nrc.gov/about-nrc/contactus.html

https://www.nrc.gov/about-nrc/contactus.html Please submit feedback by emailing Thomas.Vukovinsky@nrc.gov or Katherine.McCurry@nrc.gov

List of Publicly Available Documents https://www.nrc.gov/about-nrc/contactus.html 2019 License Performance Review report 2020-005 -

ML20072L915 2019 Final CO Inspection Report 2020-006 - ML20071H554 2019 Westinghouse CO Completion Letter - ML20063M239 ANI supplemental report 2018-006 - ML18089A060 ANI supplemental report 2017-009 - ML17356A091 CAL inspection report 2017-008 - ML17290A133 CAL inspection report 2017-006 - ML17132A333 Enforcement actions report 2017-007 - ML17058A448 NRC Program Adjustment Letter - ML16355A078 Augmented Inspection Team report 2016-007 - ML16301A001 Confirmatory Action Letter (CAL) - ML16224B082 Confirmatory Order (CO) - ML17221A103