ML20085G274

From kanterella
Jump to navigation Jump to search
AO BFAO-7325T:on 731005,HPCI Sys Failed.Caused by Leaking Ruptured Diaphragm.Surveillance Test Initiated Immediately But RCIC Turbine Governor Failed.Rcic Governor Adjusted & Tested
ML20085G274
Person / Time
Site: Browns Ferry, 05000258
Issue date: 10/05/1973
From: Green H
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20085G265 List:
References
BFAO-7325T, NUDOCS 8308240751
Download: ML20085G274 (1)


Text

, ,,,, _ _ _ -- - --- ----- - - - - -

.my 2-244882 E2 78 10/05 /73 M g t 4A/ g ;E

' [l Westein union ]LC JCl;u ICS IPMBNGZ CSP 2057298316 (CM TDBN AT JS AL 127 10-05 0513P EST h:W 6 i,..m,(

5

)

ZIP 30303 US ATOMIC ENERGY COMMISSION  ;

REGION 2 DIRECTORATE OF REGULATORY OPERATIONS 230 PEACHTREE ST NORTHWEST ATLANTA GA 30303 )

)

)

BFAO-7325T AT 545AM ON OCTOBER 5 1973 DURING PERFORMANCE TEST OF THE HPCI SYSTEM THE HPCI FAILED TO OPERATE PROPERLY. THE HPCI SYSTEM ISOLATED AUTOMATICALLY DUE TO A LEAKING EXHAUST 1 RUPTURED DIAPHRAM. THE REACTOR WAS OPERATING AT APPROXIMATELY 5 PERCENT POWER AT 1000 PSIG PRESSURE. SURVEILLANCE TEST OF REDUNDANT CORE COOLING SYSTEM VAS BEGUN IMMEDIATELY. DURING )

SURVEILLANCE TEST OF THE RCIC SYSTEM AT 745AM THE RUIC TURBINE GOVERNOR t%LFUNCTIONED CAUSING OVERSPEED TRIP. REACTOR SHUTDOWN VAS STARTED IMMEDIATELY. AFTER SLIGitT RCIC GOVERNOR ADJUSTMENT  ;

THE RCIC VAS RETESTED AND DECLARED OPERABLE AND REACTOR SHUTDOWN VAS TERMINATED INVESTIGATION OF THE HPCI RUPTURED DIAPHRAM DISCONTINU ING  ;)

H J GREEN BROWUS FERRY NUCLEAR PLANT SUPERINTENDENT 1715 EST -

~)

MGMATLB ATL 3

'. )

3

)

eggeggggfgogsj, J S PDR

.)

J 3

.s