h-MEE Log # TXX 95152 File # 10010.2
~~
C Ref. # 10CFR50.36 1UELECTRIC June 15,.1995
. C. Lance Terry omy Wrmiew.Nacisar -
U. 5. Nuclear Regulatory Commission l-Attni Document Contro1 Desk i
~
Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
UNITS 1 AND 2 DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR MAY 1995
~
1 Gentlemen:
1 Attached is the Monthly Operating Report for May 1995, prepared and i
submitted pursuant to Techrical Specification 6.9.1.5 contained in Appendix A to the Comanene Peak Steam Electric Station Units 1 and 2 Operating License Nos. NPF 87 and NPF 89, respectively.
]
Sincerely, j
C. L. Terry 4
B.
S'. Marshall J
Generic Licensing Manager
(
JMK/jak Attachment c
Mr. L. J. Callan Region IV Hr. L. A. Yandell Region IV Resident Inspector. CPSES (1)
Mr. T. J. Polich. NRR i
c.
l 9506200078 950531, i
.1 i
Energy Plaza. idol Bryan Street DeHas. Texas 75201 3418
(
s
~
.. ~ - -
U, 2
Attachment to TXX-95152 i
Page 1 of 8 "
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1' l
l NRC MONTHLY OPERATING REPORT l l
DOCKET NO.:
50-445 l
l UNIT:
CPSES 1 DATE:
06/09/1995' COMPLETED BY:
Ed Sirois j
TELEPHONE:
817/897-5664-I OPERATING STATUS 1.
REPORTING PERIOD: MAY '
.1995
' GROSS HOURS IN REPORTING PERIOD: 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150 *
. DESIGN ELECTRICAL RATING (MWe-Net): 1150 l
l 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
'NONE 1
4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE - CUMULATIVE 1
5.
NUMBER OF HOURS REACTOR WAS CRITICAL 720
, 2,566
.33,779 l
6.
REACTOR RESERVE SHUTDOWN HOURS 0
0.
2,440 1
l 7.
HOURS GENERATOR ON LINE 717 2,485 33,231 8.
. UNIT RESERVE SHUTDOWN HOURS O
O 0
I 9.'
- GROSS THERMAL ENERGY GENERATED (MWH) 2,399,707' 8,137,279 107.072,385
' 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 804,061 2,721,817 35,618,444
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
.769,346 2,594,678 33,958,125 l
- 12. ' REACTOR SERVK'E FACTOR 96.8 70.8 80.3
' 13. REACTOR AVAILABILITY FACTOR 96.8 70.8 86.1
- 14.. UNIT SERVICE FACTOR 96.4-
.68.6 79.0
- 15. UNIT AVAILABILITY FACTOR
'96.4 68.6' 79.0
- 16. UNIT CAPACITY FACTOR (USING MDC) 89.9 62.3 70.2
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 89.9 62.3 70.2
- 18. UNIT FORCED Olli AGE RATE 3.6 2A 4.6
- 19. SHUTDOWN 6 SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DUP.ATION OF EACH) :
1
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
- ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED l
i l
l
l l
[
l~
i-i Attachment to TXX-95152
- Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 445 c
UNIT:
CPSES 1 DATE:
06/09/1995 COMPLETED BY; Ed Sirois TELEPHONE:.
817/897-5664 MONTH : MAY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEi.
(MWe-Net)
(MWe-Net) 1 1097 17 1099 2
1094 18 1100 3
1094 19 1100 i
4 1096 20
'1099 5
919 21 1099 6
0 22 1099-7 483
'23 1099' 8
1038 24
'1099 9
1100 25 1099 10 1101 26 1097-11 1101-27 1096 12 1101 28 1096 t
13 1101 29 1095 14 1101 30 1096 15 1099 31 1095 16 1099
T I
Attachment to TXX-95152 i
Page 3 of 8 -
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH j
DOCKET NO.?
50-445 UNIT:
CPSES 1 i
DATE:
06/09/1995 I
COMPLETED BY:
Ed Sirois TELEPHONE:
817/897 5664.
MONTH : MAY 1995 DAY.
TIME REMARK / MODE I
05/01
'0000 Unit started the month in MODE 1 @ 100% power.
s 05/05 2008 Reactor tripped due to a lightning strike which caused a surge in the Rod l
Control Power Supplies. Unit in MODE 3 05/06 1957 Unit returned to MODE 2.
l i-2241 Unit returned to MODE 1.
2300 Unit synchronized to the grid.
05/08 1026 Unit returned to 100% power.
05/31 2400 Unit ended month in MODE 1 @100% power.
l r
i
. Attachment to TXX-95152
+
Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-445.
UNIT:
CPSES'1 DATE:
06/09/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897-5664 REPORT MONTH : MAY 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR
~NO DATE S: SCHEDULED (HOURS)
. REASON REDUCING POWER
. CORRECTIVE ACTIONS / COMMENTS f
3-950505 F
26.87 H
3 Reactor trip induced by lightning strike. See
. previous page.' 1-LER-95-002.
l 4
l
[
.1) REASON
- 2) METHOD A: EQU!PMENT FAILURE (EXPLAIN)
E: OPERATOR TRAIN'.NG AND UCENSE EXAMINATION :
1: MANUAL
- B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERAT!OMAt. ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN).
i
-.,., -. - ~... -..... - -.. - -,
=
t2-Attachment to TXX-95152" Page. 5.of. 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT 3
DOCKET NO.:
.50-446 UNIT:
CPSES 2.
DATE:
06/09/1995-I COMPLETED BY:
Ed Sirois TELEPHONE:
817/897-5664 OPERATING ' STATUS I
1.
REPORTING PERIOD: MAY 1995 GROSS HOURS IN REPORTING PERIOD: 744 4
~
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411.
MAX. DEPEND. CAPACITY (MWe-Net): 1150
DESIGN ELECTRICAL RATING (MWe-Net): 1150 3.
~ POWER LEVEL TO WHICH RESTRICTED'(IF ANY)'(MWe-Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
. ~ CUMULATIVE' THIS MONTH YR TO DATE 5.
NUMBER OF HOURS REACTOP WAS CRITICAL 486 3,365 12,482 6.
REACTOR RESERVE SHUTDOVIN HOURS 0
0'
'2,154 7.
HOURS GENERATOR ON LINE 475-
. 3,326 12,266 8.
UNIT RESERVE SHUTDOWN HOURS 0-0 0J 9.
GROSS THERMAL ENERGY GENERATED (MWH) 1,629,662 11,225,107 38,525,033 10.-
GROSS ELECTRICAL ENERGY GENERATED (MWH) 524,309 3,793,710 12,949,765
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
-495,799 3,636,549 12,331,505
- 12. REACTOR SERVICE FACTOR 65.3
-92.9 78.0
- 13. REACTOR AVAILABILITY FACTOR 65.3 92.9 91.5 s
- 14. UNIT SERVICE FACTOR 63.8 91.8 76.7
- 15. UNIT AVAILABILITY FACTOR 63.8 91.8 76.7
- 16. UNIT CAPACITY FACTOR (USING MDC) 57.9 87,3 67.0
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 57.9 87.3 67.0
- 18. UN!T FORCED OUTAGE RATE 5.3 1,6 9.5
- 19. SHUTOOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH).
- 20. IF SHUTDOWN AT EM0 OF REPORTING PERIOD, ESTIMATl*D DATE 05 STARTUP:
- 21. UNITS IN TEST S7ATUS (PRIOR TO COMMERCIAL OPERAT,0N):
ACHIEVED COMMERCIAL OPERATION 030803 ESTIMATED 1
9 t5'*-1++
i l
' Attachment to TXX-05152 '
i Page 6 of 8
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-446.
UNIT:
CPSES 2 DATE:
.06/09/1995 l
COMPLETED BY:
Ed Sirois-TELEPHONE:
817/897-5664 MONTH : MAY 1995 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net)
+
1 1118
-17 196 2
1118 18 891 3
1118 19 1109-4 1118 20 1109 l
6 939 21 1111 l
6 0
22 1113 7
0
'23 1113 8
0 24 1115 9
0 25 1114 10 0
26 1113 i
11 0
27
.1114 i
12 0
28 1113-t 13 0
29 1112 14 0
30 1112 15 0
31 1110 16 0
i i
i
l.
l
- Attachment to TXX-95152 '
Page 7 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH j
DOCKET NO.:
50-446-UNIT:
CPSES 2
.i l
. DATE:
.06/09/1995 COMPLETED BY:
L Ed Sirois l
TELEPHONE:
817/897-5664 l
l l
l MONTH : MAY 1995 l
DAY TIME
. REMARK / MODE 05/01 0000 Unit started month in MODE 1 @ 100% power 05/05 2009 Reactor tripped due to a lightning strike which caused a surge in the Rod '
Control Power Supplies. Unit in MODE 3.
I 05/06 2300 Unit entered maintenance outage to repair leaks on charging line check valves.
ll l
05/08 1723 Unit entered MODE 4 05/09 0315 Unit entered NODE 5.
05/14 1249 Repairs to check vJves complete; Unit entered MODE 4.
05/15 0327 Unit entered MODE 3.
05/16 1436 Unit entered MODE 2.
l 05/17 0047 Unit entered MODE 1.
0107 Unit synchronized to the grid.
I-05/18 1803 Unit returned to 100% power.
05/31 2400 Unit ended month in MODE 1 @ 100% power.-
l l
l l'
L l:
l I
g d
Attachment to TXX-95152 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446-UNIT:
CPSES 2 DATE:
06/09/1995 COMPLETED BY:
Ed Sirois
~ TELEPHONE:
817/897-5664' REPORT MONTH : MAY 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 3
950505
'F 26.85 H
3 Reactor trip induced by lightning strike.-
1-LER-95-002.
4 950505 S
242.12 A
4 Reactor was already in MODE 3. See previous page.
- 1)._ REASON
- 2) METHOD A: - EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
.