ML20085E886
| ML20085E886 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/02/1976 |
| From: | Gilleland J TENNESSEE VALLEY AUTHORITY |
| To: | Jennifer Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20085E878 | List: |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8308170089 | |
| Download: ML20085E886 (1) | |
Text
r W"%
830 Power Building
- aO A
IE FILE COPY UENNESSEE VALLEY AUTH TY 9
t\\
5 g
[
CHATTANOOGA. TENNESSEc 374ot h
[
0\\
efe,ge April 2, 1976 r
< e }y
,\\ i Mr. John C. Davis, Acting Director Office of Inspection and Enforcement U.S. Nucicar Regulatory Commission Washington, DC 20555
Dear Mr. Davis:
BROWNS FERRY NUCLEAR PLANT UNITS 2 AND 3 - REPORTABLE DEFICIENCY - USE OF IMPROPER SCIIEDULE PIPE IN STANDBY LIQUID CONTROL SYSTEM l
Initial report of the subject reportable deficiency was made to G. R. Klingler, NRC-IE, Region II, on January 12, 1976.
In compliance with paragraph 50.55(e) of 10 CFR Part 50, we submitted a report on the deficiency on February 11, 1976, J. E. Gilleland to Donald F. Knuth.
To prevent the recurrence of similar deficiencies, the Director of Engineering Design will prepare a memorandum requesting project managers to reevalucte existing controls for drawing verification. The memorandum will also instruct project managers to make appropriate changes or additions to detailed project level engineering procedures to ensure compliance with DED-EP 3.10, " Design Verification Methods and Performance of Design Verifications."
Very truly.yours,
- E
.b n J. E. Gilleland'-
Assistant Manager of Power CC:
Mr. Norman C. Moseley, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 818 230 Peachtree Street, NW.
Atlanta, Georgia 30303 83081700g9 760911
{DRADOCK 05000260 FDR An Equal Opportunity Ernployer 6a36'