Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
e I
' l
. New Hampshire i Ted C. Feigenbaum Yh hh. Presdent and Chief E xecutive Of ficer NYN-91166 October 16, 1991 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
Reference:
Facility Operating License NPF.86, Docket No. 50 443
Subject:
Monthly Operating Report Gentlemen:
l l
Enclosed please find Monthly Operating Report 91-09. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of September,1991' and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
1.
Very truly yours, f)gh'th/t b ~
Ted C. Fprgenbaum l
l Enclosure (s)
TCF:WJT/ tad cc: Mr, Thomas T, Martin l Regional Administrator i United States Nuclear Regulatory Commission l Region 1 475 Allendale Road King of Prussia, PA 19406 l
Mr. Gordon E. Edison, Sr. Project Manager Project Directorate I-3 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 l
Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Seabrook, NH 03874 l
l 9110180222 910930 PDR ADOCK 05000443 /
R PDR / t- =
i l
c, 4 . t b, , . g ,_0 ..
New Hampshire Yonkee Division of Public Service Company of New Hampshire !k j.
V P.O. Box 300 = Seabrook, NH 03874
....4-i New llampshire. Yankee October 16, 1991 p
p
=
L. ENCLOSURE 1 TO NYN 91166 l
- c. ,
.. j 3 .
OPERATING DATA REPORT l
DOCKET NO ' 50,443 UNIT Seabrook 1 DATE 10/16/01 COMPLETED BY P.-Nardone TELEPHONE (603) 474-9521 (Ext. 4074) 19?IRbTING STATUS
- 1. . Unit Names _ _ _ Seabrook Station Unit 1
'2.- _ Reporting! Period: SEPTEMBER 1991 3.- Licensed Thermal Power (HWt): 3411
- 4. Nameplate
- Rating (Gross MWe): 1197 ,
- 5. Design Electrical-Rating-(Net MWe): 1148
- 6. Maximum Dependable Capacity (Gross HWe): 1200
'7.. Maximum Dependable Capacity.(Net MWe): 1150
- 8. :If Changes Occur in Capacity Ratings (Items Number 3 Threugh 7)
Since Last Report, _Give Reasons: Not Applicable ,,
- 19. Power LevelfTo Which Restricted..If Any: __ _ None ;
- 10. Reasons For Restrictions, If Any Not ADolicable This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period __
720.0 6551.0 __ 43440,0
- 12. Number Of Hours Reactor Was Critical 0.0- 4650,1 10369.4
- 13. Reactor Reserve Shutdown Hours 0,0 0,0 953.3 14._ Hours Generator On-Line 0,0 4575,6 8703,0
-15. Unit' Reserve Shutdown Hours 0,0 0,0 0,0
- 16. : Gross Thermal Energy Generated (MWH) 0 14687730 272R8055
- 17. Gross. Elec. Energy Generated-(MWH) 0 5107161 9379078
'18._ Net-Electrical Energy Generated (MWH) 0 4904131 8998129
- 19. Unit Service Factor 0.0 69.8 75,0
- 20. Unit Availability Factor _
0,0 -69,8 ___.
75,0 '
- 21._ Unit Capacity Factor (Using MDC' Net). _
0.0 65,1 __,
70,8
- 22. Unit _ Capacity Factor (Using DER Net) -0.0 65.2 71,0
-*23. Unit Forced Outage Rate 0,0 7.9 10.5
- 24. Shutdowns. Scheduled Over Naxt 6 Months (Type. Date, and Duration of Each):
REFUELING. 07/27/91. 67 DAYS-
_25.,If Shut Down At_End Of Report Period. Estimated Date Of Startup: 10/10/91
-* NOTE: Values based on accumulated hours starting 08/19/90, date Regular Full' Power Operation began.
1 of 4
~a - c; . __ . .. __ _ __ -. _._. a
7
-~,-- _ _ _ _ . _ _ _ -
- ,..s y AVERAGE DAILY UNIT-POWER LEVEL 4 ,
, DOCKET NO. 50-443 UNIT Seabrook 1 DATE 10/16/91 CCMPLETED BY ,_f Nardone--
TELEPHONE (603) 474-9521 (Ext; 4074).
__ MONTH SEPTEMBER. 1991 DAY: -AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe-Net)-- ~
(MWe Net)--
1 0 16 0 ..
2-- 0- 17 0 3: 0 18 0
.4 : 0 19 0 5 0 20 0 6- 0- 21 0
- 0 22 0 8 0 23 0 r- ,9- 0- 24 0 m
26 /10 0' 25 0 11 -0 26 0
- 0 27 0
. 13 , 0 28- 0 14 0 -29 0 15 0- _ . _ , , 30 0
' INSTRUCTIONS-
.On this: format -list the average ' daily unit- power level in MWe-Net for each day in the:
reporting month. . Compute to the nearest whole megawatt.
2 of 4 p i muism iss4m4M
..ie, ii .1
.f UNIT SHUTDOWNS AND POWER REDUCTIONS- DOCKET CO. 50-443 ' " '
~'
-UNIT- S** brook-l'
- DATE ~10/16/91' .-
REPORT HONTH SEPTEMBER. 1991 . COMPLETED BY: P. Na rde_n_e -
TELEPHONE (603) 474-9521-(Ext . -' 4 074 )
' Type 3 Duration. Reasoni . Method of Licensee Cause is Corrective No. lDate (Hours)- Shutting Event Action to-
= Down Reactor - .3 Report #4 Prevent Recurrence Page 1 of 1.
4 -N/A -Scheduled refueling outage.
91-08 09/01/91 .S 720 C l
2 3 1
Reason: Method F: Forced S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training E License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain) (Duration = 0)
H-Other_(Explain) 9-Other (Explain)-
3 of 4 i-
I DOCKET NO. $0-443 UNIT Seabrook 1 l
]. DATE 10/16/91 I COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4074)
REFUELING INFORMATION REQUEST 1.-Name of facility ' Seabrook Unit 1 !
- 2. Scheduled date for next refueling shutdown: 07/27/91 actual 07/25/91
- 3. Scheduled date for restart following refueling: 09/30/913 estimated 10/16/91
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No
- 5. Scheduled date(s) for submitting licensing action and supporting information:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pools (a) In Core: 193 (b) 60
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
9.-The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
l I
l Licensed capacity of 1235_ fuel assemblies bated on fourteen refuelings and full core offload capability.
l l The current licensed capacity is adequate until at least the l year 2010, 4 of 4 l