Text
e
. New Hampshire Yh hh.
Ted C. Feigenbaum Presdent and Chief E xecutive Of ficer NYN-91166 October 16, 1991 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
Reference:
Facility Operating License NPF.86, Docket No. 50 443
Subject:
Monthly Operating Report Gentlemen:
l l
Enclosed please find Monthly Operating Report 91-09.
This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of September,1991' and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
1.
Very truly yours, f)gh'th/tb
~
Ted C. Fprgenbaum l
l Enclosure (s)
TCF:WJT/ tad cc:
Mr, Thomas T, Martin l
Regional Administrator i
United States Nuclear Regulatory Commission l
Region 1 475 Allendale Road King of Prussia, PA 19406 l
Mr. Gordon E. Edison, Sr. Project Manager Project Directorate I-3 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 l
Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Seabrook, NH 03874 l
l 9110180222 910930 PDR ADOCK 05000443
/
R PDR
/ t-l New Hampshire Yonkee Division of Public Service Company of New Hampshire
!k j.
=
i c,
4. t b,,. g,_0..
P.O. Box 300 = Seabrook, NH 03874
- Telephone (603) 474-9521 V
....4-i New llampshire. Yankee October 16, 1991 p
p
=
L.
ENCLOSURE 1 TO NYN 91166 l
- c.,
j 3
OPERATING DATA REPORT l
DOCKET NO '
50,443 UNIT Seabrook 1 DATE 10/16/01 COMPLETED BY P.-Nardone TELEPHONE (603) 474-9521 (Ext. 4074) 19?IRbTING STATUS
- 1.. Unit Names _ _ _
Seabrook Station Unit 1
'2.-
_ Reporting! Period:
SEPTEMBER 1991 3.-
Licensed Thermal Power (HWt):
3411
- 4.
Nameplate: Rating (Gross MWe):
1197 5.
Design Electrical-Rating-(Net MWe):
1148 6.
Maximum Dependable Capacity (Gross HWe):
1200
'7..
Maximum Dependable Capacity.(Net MWe):
1150
- 8. :If Changes Occur in Capacity Ratings (Items Number 3 Threugh 7)
Since Last Report, _Give Reasons:
Not Applicable 19.
Power LevelfTo Which Restricted..If Any:
None
- 10. Reasons For Restrictions, If Any Not ADolicable This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.0 6551.0
__ 43440,0
- 12. Number Of Hours Reactor Was Critical 0.0-4650,1 10369.4
- 13. Reactor Reserve Shutdown Hours 0,0 0,0 953.3 14._ Hours Generator On-Line 0,0 4575,6 8703,0
-15. Unit' Reserve Shutdown Hours 0,0 0,0 0,0
- 16. : Gross Thermal Energy Generated (MWH) 0 14687730 272R8055
- 17. Gross. Elec. Energy Generated-(MWH) 0 5107161 9379078
'18._ Net-Electrical Energy Generated (MWH) 0 4904131 8998129
- 19. Unit Service Factor 0.0 69.8 75,0
- 20. Unit Availability Factor 0,0
-69,8 75,0
- 21._ Unit Capacity Factor (Using MDC' Net).
0.0 65,1 70,8
- 22. Unit _ Capacity Factor (Using DER Net)
-0.0 65.2 71,0
-*23.
Unit Forced Outage Rate 0,0 7.9 10.5
- 24. Shutdowns. Scheduled Over Naxt 6 Months (Type. Date, and Duration of Each):
REFUELING. 07/27/91. 67 DAYS-
_25.,If Shut Down At_End Of Report Period. Estimated Date Of Startup:
10/10/91
-* NOTE: Values based on accumulated hours starting 08/19/90, date Regular Full' Power Operation began.
1 of 4
~a
- c; a
7
- ~, - -
- ,..s y
AVERAGE DAILY UNIT-POWER LEVEL 4
DOCKET NO.
50-443 UNIT Seabrook 1 DATE 10/16/91 CCMPLETED BY,_f Nardone--
TELEPHONE (603) 474-9521 (Ext; 4074).
__ MONTH SEPTEMBER. 1991 DAY: -AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe-Net)--
(MWe Net)--
~
1 0
16 0
2--
0-17 0
3:
0 18 0
.4 :
0 19 0
5 0
20 0
6-0-
21 0 -
0 22 0
8 0
23 0
r-
,9-0-
24 0
m26
/10 0'
25 0
11
-0 26 0
- 0 27 0
. 13,
0 28-0 14 0
-29 0
15 0-30 0
' INSTRUCTIONS-
.On this: format -list the average ' daily unit-power level in MWe-Net for each day in the:
reporting month.. Compute to the nearest whole megawatt.
2 of 4 p
i muism iss4m4M
.f
..ie, ii.1 UNIT SHUTDOWNS AND POWER REDUCTIONS-DOCKET CO.
50-443 ' "
~'
-UNIT-S** brook-l'
- DATE ~10/16/91' REPORT HONTH SEPTEMBER. 1991
. COMPLETED BY:
P. Na rde_n_e -
TELEPHONE (603) 474-9521-(Ext. -' 4 074 )
No.
lDate
' Type Duration.
Reason
. Method of Licensee Cause is Corrective 3
i Event Action to-(Hours)-
Shutting
.3
= Down Reactor -
Report #4 Prevent Recurrence Page 1 of 1.
91-08 09/01/91
.S 720 C
4
-N/A
-Scheduled refueling outage.
l 3
1 2
Method F: Forced Reason:
1-Manual S:
Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test 2-Manual Scram 3-Automatic Scram C-Refueling 4-Continued from D-Regulatory Restriction E-Operator Training E License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain)
(Duration = 0)
H-Other_(Explain) 9-Other (Explain)-
3 of 4 i-
I DOCKET NO.
$0-443 UNIT Seabrook 1
].
DATE 10/16/91 COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4074)
REFUELING INFORMATION REQUEST 1.-Name of facility ' Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown:
07/27/91 actual 07/25/91
- 3. Scheduled date for restart following refueling: 09/30/913 estimated 10/16/91
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No
- 5. Scheduled date(s) for submitting licensing action and supporting information:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pools (a)
In Core:
193 (b) 60
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned.
9.-The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
l I
l Licensed capacity of 1235_ fuel assemblies bated on fourteen refuelings and full core offload capability.
l l
The current licensed capacity is adequate until at least the l
year 2010, 4 of 4 l