ML20085B876

From kanterella
Jump to navigation Jump to search
Confirms That Listed Responses to Region III Inspector R Landsman Questions,Provided to B Burgess,Nrc Resident Inspector,On 830608.Responses Concern Concrete Truck Drum Revolving & Drawing C-1427
ML20085B876
Person / Time
Site: Midland
Issue date: 06/28/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6773, NUDOCS 8307080508
Download: ML20085B876 (2)


Text

_

O C011SumBl3 power

=

Executive Atmager Atidimd I+oject office General Offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788-0774 June 28, 1983

[lNC STAFF DO ' N DN Ei.Sl 3

d> ' 3 M CR' Mr J J Harrison 3pya ic Midland Project Section muss i

U S Nuclear Regulatory Conmission 33 -

i j

Region III wt i

~ ~f 799 Roosevelt Road OL l

F1LU V

Glen Ellyn, IL 60137 MIDIAND ENERGY CENTER GO 7020 RESPONSE TO NRC QUESTIONS File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6773 70*01 The following responses to questions raised by Dr. Ross Landsman, NRC

. Region III Inspector, were provided to B. Burgess, NRC Resident Inspector, on June 8,1983, by R. H. Wieland of Consumers Power Company.

QUESTION:

1.

Is there a requirement for the revolving of the concrete truck drum from charging to discharging?

RE5PONSE:

There are no specific requirements for continuous drum rotation bet-ween charging and discharging for a fully batched mix. This same question was discussed previously with MPQAD, Project Engineering, and NRC Personnel. The specific requirements relative to this act-ivity are 300 revolutions maximum and 90 minutes total elapsed time prior to discharge.

QUESTION:

2.

Why wasn't the QC Inspector present at the W10 Pier pour on June 7, 1983, aware of any requirements relative to the stopped drum?

l

RESPONSE

Since there is no specific requirement to maintain the dmm revolving, the QC Inspector had no reason to document the fact that the drum was not rotating.

8307080508 830628 N

gDRADOCK 05000329 1)o T a y

QUESTION:

3.

Ilow many attachments are on Drawing C-1427?

RESPONSE

An inspection of controlled Drawing C-1427 shows 13 FCR attachments which is within the project requirements for number and type of attachments.

JAM / RIM /klm