Telecopy of Rept Requested in Re Shoulder Bolt Piece Discovered in Steam Generator 2.Caused by Accident During Shipment of May 1969.Lock Bars Installed.Reactor Operability Acceptable
ML20085B575
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/06/1972
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20085B488 List:
References
NUDOCS 8307080197
Download: ML20085B575 (4)


Text

-

p n" 1 gaggg3g cao

-]

l'-02.9204A147 05/26/72 0 g

C O TLX CONSPOWER JKN gl Western union ZIP G0137

~

j 006 JACKSON MICHIGAN 5-26-72 O

w/r e

O e

O a b h 3412a e

Cli1 CA JO OPatA flu!JS OFFICE UNI f dD SfA f ES ATOMIC EtJERGY COMMISSI0tJ Q aLEN ELLYN ILL 60137 O

e CONSUMED 3 POWin COMPAtJY JACKSON MI CllI GA fJ Q

5-zG-72 10:56P EDT g

M.c d G CASd"S LdTTER OF MAY 19, 1972 REQUESTED THAT PRIOR TO O nESUMI Nd RdACI0d OPERATION, CONSUMERS POWER COMPANY REMOVE TliE g

PALISADiS ildACTod VdSSEL HEAD AND INSPdCT THE COMPdNSAIING RING SHIM AND Tlid UPPin GUIDE STRUCTUitE.

If FURTHER REQUESTED THAT Q

Illd RESULTS OF THIS It;SPECTION, IOGdTHER WITH OUR ANALYSIS OF TliE g

SUI fab 1LIfY OF Tlid REACT 0il Fait FUTURE OPERAIION, ad itEPollIED TO YOU.

IliIS TWX IS WRIfTEN TO PROVIDE THE REQUdSTED REPORT.

42 HAVE COMPLETED A DETAILED INSPECTION OF THE PALISADES UPPER JUIDE STRUCTURE COMP 2NSATING RING SHIM, UPPER GUIDE STRUCTURE, O INTEdNALS ALIGNMENT KEYS AND VESSEL CLOSURE HEAD MATING SUR-g FACIS AS MADE AVAILABLE BY REACTOR VESSEL HEAD REMOVAL.

O THE P0HTION OF THE 5/8 INCH SHOULDER BOLT RECOVERED liROM THE g

NO. 2 STEAM GdNERATod INLET PLENUM ON MAY 7 1972, WAS DEIERMINdD fo HAVE COME F;iOM THE No.1 LOCATING BOLT POSITIotJ ON THE UPPER l O auIDI ST.tdCTUdd RIN3 SHIM.

IliE RING SHIM BOLT LOCATIONS WditE g

STA7,P MA.;KdD AU FOLLOWS/

/1 AT 146 DEGREES, /2 AI 101 DEGRidS,

/3 A f 96 DdadddS, /4 AT 11 DEGREES, /5 AT 326 DdGREES, /6 AI 281 O

Dim..'CES, /7 A f t3G DdGREES, AND /8 AT 191 DEGREES, THE 180 DE-g i

d.u.dS AZIMUfhAL OdIENTATION OF THE HING SHIM CORRESPONDING TO THE l

Nod f H ALIJNMENT KEY AT 180 DEGREES.

lO e

l IHd 5/8 INCH SHOULDER UGLI LOCATED AT POSI TION /7 WAS FOUND TO l Q uEdlN, AS WAS Ilid /1 UOLT PORTION PRdVIOUSLY RECOVERED.

ud SdVdadD Af THd dND OF THE SHOULDER SECTION WHeliE THE THREADS l

THE Rd-g ACf03 VdSSEL HiAD APPARENTLY COVERED A SUFFICIENT PORIION OF THd COUNTE.iUORE TO EFFdCTIVELY CAPTURE THE BOLT HEAD AND SHOULDER POR-O fiON OF THe Cne screw.

THE LOOSE e0RrION OF THE /7 BOLT WAS Rd-g MOVED.

O IN ADDI FION TO THE ABOVE OBSdRVATIONS, DIMENSIONS WERE TAKEN AND g

adCO3DdD Iti ACC0dDANCE WITH THE APPROVED PROCEDURE USED FOR THIS I NVdS TIGA fl 0N.

THESE DIMENSIONS PLUS OBSERVATIONS LEAD US TO Q

fHddi CONCLUSIONS:

g o

8307080197 720712 g 30 D PDR ADOCK 05000255 S

O al\\

c

>2 g

^

O-o O

Eg Mailgram em z o

o 1.

THEdE IS No SIGNIFICANT SHIFT IN POSITION OF TH5 RING SHIM Q HILA FI Vi TO THE UPPin GJIDE STRUCTURE FLANCE AS COMPARED TO SIMI-g L/w DIMENSIONS HECOHadD IN SEPT 19G9.

O u.

THide. IS fl0 EVIDENCS OF ANY ADNCHMAL MOTION BETWEEN THE RING g

SliI M, UPPEa Julod SIHUCTURE, CORZ SUPPORT BAHHEL, HZACTOR VESSSL nUO ddAC fon VESSEL HEAD.

3 THE NUnMAL IfJ01 CAT 10tJS RESULTING FHOM COMPONENT INSTALLATION AND HEMOVAL AND BdAttING vf ONE COMPolldNT AGAIDST ANOTHdd WERd Q OuSidV20 Id HEACTOH VESSEL HEAD TO ALIGNMEfJT KEYS AND ilEACfoil g

VdSSEL HEAD TO HING SHIM, Q

4.

THEdE WAS NO EVIDENCE OF ANY VIBRATION OR FitdIIING OF THE g

MAJ0a COMPONENTS.

THE ONLY INDICATION OF VIndATION WAS THd FACf FHA f THE /7 UGLI APPARENTLY JIGGLED IN ITS liOLE SUdSEQUENT TO Q

FA I L Ua r. AND CAJSid A SMOUTH SUHFACE AT THE FitACTutti AND ALOND g

fHc LOWZo SECTION OF fild CAP SCHEW Si(0ULddH.

Q wc HsVi CONCLuddo IHAT Tild CAUSE OF THE FAILURE ORIGINATED WITli g

flic ACC10dNf 00 DING SHIPMENT OF THE UPPER GUIDE SfauCTURE TO THE SI f E IN MAY 1969.

INSPdCTIONS CONOUCTED SUBSEQUENT TO THAT AC-Q CIddNT INulCAliD TWO A idAS OF SIGNIFICANT GOUGING ON THE RING g

SHIM.

THE HEAVIESI dOUGd EXISTED AT 140 DiGitdES AND WAS S/16 INCH WIud BY G-1/4 INCHES LON3 BY 3/64 INCll DEdP.

FOUR Q

joJ3dS Wda d RdP0d f dd A f 240 OdGRidS, EACH G0dGE BdING APPROXI-g MA FELY 3/16 I NCH WIDE BY 1/2 INCll LONG BY 3/64 INCH DEEP.

f H2.id Win E NO OTHEu GOUGES ON Tlid HING SliIM DESPEit IllAN 1/64 Q

INCH DIEP AucuT 1/G4 INCH IN DIAMETER.

ALL GOUGIS WERE SUdSE-g GUINILY DLENDED IN PHIOR TO USE OF THE UPPEil GUIDE STRUCTURE.

Q I f IS SluNIFICANT THAf THE /1 LOCATING BOLT WAS AT 146 DEGHEdS, g

fMI POSIfl0N OF f HE lidAVIEST GOUGING BEING AT 140 DEGREES, ANJ FHA f Ilic /7 HOL T WAS AT LOCATION 23G DEGREES, WITH THE FOUd SIMI-Q LA. HEAVY Gudic.J ddI NJ A T 240 DIGRdis.

WE THdHEFORE CONCLUDi g

THAT THc IMPACI F0dCd3 WilICH CAUSEo Tlid G0036S AT 140 DiGHEES A NJ L-40 di S.ddJ iiESULTid IN HIGH IMPACT LOAOS IN THE uoLTS LO-Q CAfdd Af 146 DijdEES ANJ 23G DEGH6dS //l AND /7 RESPdCIIVELY/

g sHICli UL TIMA fELY LEAD TO THdlit FAILUHE.

IN A00lTION TO THESd INPACT F0 acid Aud DING DEF0iiMATION RdSULTING FROM THE ACC10idf, Q

filidd AdE THd No.iMAL LOADS ON THE HIN3 SHIM LOCATING BOLIS DUI g

TO OVALI fY OF THE HINJ SHIM DuilING MANUFACTURE AND ORIGINAL SHOP I NSTALLA IION, PLUS THE NORMAL LOADS WHICli Tlid RING SHIM IS Sub-Q JiCico f0 DURINJ VESSdL CLOSURE HEAJ INSTALLATION ANJ HEMOVAL, g

PLA Nf HEA TUP AND C00LDOWN, AND VARI ATIONS IN AVdHAGE C00LANf FEMPidA TUHi DURI Nd OPEH A fl0N.

COMBINATIONS OF THESE LOADS Q PHOPAGA TED THE FAILUHE OF BOLTS /1 AND /7.

g fHIS FAILJHL MECliANISM IS CONFIhMEd BY THd METALOGRAPHIC EXAMI-Q NA TIONS PidFedMid ON THE /1 BOLT.

THE METALOGRAPHIC EXAMINATIONS g

SliU W Ille. FAILudc. MiCliANISM TO BI LOW CYCLE FA TIGUE FROM HEAVY SIJi LOAJIN JJ.

THESE EXANIDA fl0NS ALSO SHOW THAI THE FAILURE WAS Q IMPACf INIflAfid, 4HICH COHiidSPONDS TO Thi SHIPPING ACCIdiNT, g

O O

O rs o

O eA

!M!ML Mailgram O

O TO P.idCLUDI Tild POSSlulLITY OF FUiiTHEfl BOLIS dSCAPIN3 FROM Tlid Q JI N.i SHIM,

  • HAVE INSTALLdd LOCK DAHS IN ACCoitDANCE WITH THE g

APPa0Vid PacCcaudd AT ALL G itdMAlfjING DOLT LOCATIolJS.

THE fHaiaJid PoafluNS OF fHi /1 ANO /7 UOLIS RdMAINING IN IHi O

JPfan ddIJE SfadC ruaE Ft.ANJc ARE CAPTundJ DY DOWELS INS TALLED g

nhJInLLY Thauddli THE UPPid GUIDE SinUC f udd FLANGE AND PLUG WELddo.

O SHOULD AJDIfl0NAL DOLIS FAIL, fHdY WILL ud HELD CAPTIVd BY Tild LOCK g

cAaS.

  • HILE FAILund UF ALL LOCA TING BOLTS WOULD DEFEA f THdId FUNC-TION OF MAINI AININd THE POSITION OF THE RIlJG SHIM ON THE UPPin Q

JUIDs SfdUCTudE f LANdd DuaINJ REFUELING OPdHATIONS, SUCli FAILURd g

woULD HAVE NO AFFdCT UPON UPidATION OF THd HdACIOn.

THi PadSdNT LOCATION OF Titi RING SHIM Pi10VIdds G00J CONfACf WIIH THd CLOSuild O HEAD.

THIS CONTACT WOULD NOT BE LOSI SHOULD Tlid LOCA FING BOLfS g

FAIL SINCE THd ALIGNMENT KEYS WILL PHOVIDs THE NECESSARY POSITION-INi 0F fHE HIlu SHIM IN IHAT EVENT, I N ADDI f10N TO INSPECfl0NS PdHFORMEJ ON MAY 24 AND 25 1972, THE uPPca GUIJE STadCTUni WAS INSPECTdo SuaSEQUENT TO RIMOVAL OF THE O

VdSS.L CLUSudd HEAD ON NOV 30 1971.

IHS UPPdd GUIDE SfiluCTURE WAS g

ConPLdfdLY ddMOVid Af THAT IIMd AND THd FUEL BUNJLd ALIGNMENT PLATd, FudL ALIGNMENT PINS, LOWEH ALIGNMENT SLOIS AND LOAD CAHHYING Q

Sud FACd3 WdaE I NSPECTED.

NO INDICATIONS OF UNUSUAL MOTION OF THE g

UPPia GUIJE SfKUCIUHd Wind OBSdHVED.

PRI0fl TO THIS flMd THE UPPid GUI0d SfhuCIUMd HAD BdEN IN SdHVICE WITH INSTALLED FUEL Q UUNOLES DudINd POSI-CORE LOADING H0f FUNCfIONAL TdSI, INITIAL g

CHI f1CALI fY, ANJ Zddo POWiH PHYSICS TESTINS SINCE APRIL 1971.

IN ADDI TION, THd UPPdH GUI0d STRUCTund HAD BddN INSTALLEO 00 RING Q ALL PddCOME Hof FUNCTIONAL TESTS CONDUCTED DuitING Tlid PERIOD g

MA d Cll 1970 TO MAhCH 1971.

O e

IN SJMMAaY, Lc CUNCLUOz IHAf fHd POSTULAfdu SOURCE OF THE BOLT Q

Fu Jfh) ON MAY 7,

197P, DESCa ludi) IN UUa TWX OF MAY 15, 1972 AND g

Ldff:.J uF MAY IG, 1970 HAS oddN PHOVdu TO DE ACCURAId.

FURTHER-Mo.. d, we. liAV:. Nui FOUNJ ANY CONJI fl0NS TO EXIST WHICli WOULD NOT Q ac EXPEC fiD Fa0M NORMAL OPdHA fl0N.

IT IS OUH OPINION THAT THE g

acACfun IS SA fISFACIORY Fud UNadSTHICIdo OPdHATION AT LICENSid Pu u c.. LEVdL3.

A S OF flil S WaI TI NG, THE ttdACIGH VdSSEL lidAJ IS BdIN3 INSIALLdd.

Wi PLA N TO iidf un N TO POWid NdXT WidK, POSSlulY AS EAdLY AS O

WEONESDAY, MAY 31.

Wd WILL ASSUME YOU ARE IN AGHdEMENI WITH THIS g

COUdSi 0F ACTION UNLESS YOU INFORM US TO T}ld CONTRAHY.

O d D SEWELL g

NUCLEAH LICENSING ADMINISTHATOR CONSUMEHS POWid COMPANY O

e CC:

B H dd I d.:

ChICA Ju OPdu A fIONS OFFICd Q

UNIId0 STA fdS ATOMIC ENdHGY COMMISSION g

GLEN ELLYN ILL 60137 O

e

O.

O 5t'.g Mailgram

.,.a.

o

O i.

I iO e

IND Cd iO e'

2311 EST l Q MinCduA Cdu g'

l 1

O O

O

~

-O G

O O

!O el

!!O ei

!O e'

iO e

'1 l'O e

0 e<

O e

O e

i O

e O

e O

G.

O O'

O S

- - - _ -