Requests Input,Providing Instructions to Operators Re Actions to Be Taken to Maintain Plant Safety,Per 791206 Meeting.Instructions Should Be Integrated Into Operator Training Program
ML20085A976
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/10/1979
From: Hallman D
BABCOCK & WILCOX CO.
To: Pearson R
AFFILIATION NOT ASSIGNED
References
TASK-01, TASK-1, TASK-GB GPU-0542, GPU-542, NUDOCS 8307070444
Download: ML20085A976 (2)


Text

.

n c c --

..__?*

  • I

+l :a. j..,

~

~....

M4 naat #D mas Babcock &Wilcox Ml%.ma Power Generaten Gmp P.o. Scz 126o. L>rc.wra. Va. 245Cs Telephone:(804)334 5111 December 10, 1979

%q.y[f3r Richard G. Pearson, PhD pp 9,,

Consultant dl.n,g f y Industrial Engineering Departe.ent M.

V".[

P. O. Box 5511 Raleigh, NC 27607

Dear Dr. Pearson:

During cur meeting in t.ynchburg on December 6,1979, Babccck & Wilcox identified I

the need for the ir.:ediate outputs frcm you as identified in Attachment 1.

I l

Our short-tem objective deserves restating. It is to provide instructions to 4

plant operators such that the operators can recognize sit: etions described cn i

3 the " event trees" we shcued you, and readily take actions as needed to raintain plant safety during these situations.. These irstructions cust also be integrated into the oper6 tors training program. Mcwever, cur short-tem target is pre ara-tien of instructions and not new strulat'ica ceilces er redesigned training pro-i gra.s. Ycur input will assure use of proper hu.1an factors engineering princi-3 pies when preparing these instructions.

Sincerely.

.:g-

/A//*

i

.V U D. F. Hallran,:;anager j

Plant Perforcance Services Section DFH/fch Atta chr.ent l

t cc:

J. F. Walters R

C. Tuilley D. A. Napior i

i 1

i j !

8307070444 791210

?

PDR ADOCK 05000289 P

HOL j

The Saxxk &'.'.'.:cca Cc :a f I Estid:.sneo la57

-~~~~~'

.. " ~.

--- ::- - : z9 3 =- -.. - - - - - - - -

w.s= :.---

=

a w.i.q 3 p. y i

0 019; b c.

~

v.

.-.-.~~~;.

.3EST CUPY J

.,___m

.s.

p s

m u

~

1.

A " position paper" su:marizing hcw we have applied cethods and principles of Hucan Factors Engineering in our prob'lem solving process. Include a discussion of the R + S (design code) vs.. S + R (training and operation's -

mode) concepts as applicable to our situation. Also include cor:.entary of. our "old" procedure approach from the Hunan. Factors Engineering view-point. This is needed by Dececher 17, 1979.

2.

In the very near future we intend to " test" the guidelines on our simula-tor. We can judge the success from a ' technical angle (f.e.; the intended objective is reached), however, we lock to you to judge hcw well the pro-cedure is followed frcm the Hu=an Factors Engineering angle. For example, does the peccedure prcperly direct'the cperator to do what we want, given a

the existing control roem layout and the irpcrtance of his actions. A i

paper or outline describing ycur cethods and criteria for taking such a l

judgment will be required.