ML20085A624

From kanterella
Jump to navigation Jump to search
Position Description of Second Manager of Plant Performance Svc for Nuclear Svc Dept
ML20085A624
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/23/1975
From: Coppola E
BABCOCK & WILCOX CO.
To:
References
TASK-*, TASK-GB GPU-0419, GPU-419, NUDOCS 8307060617
Download: ML20085A624 (1)


Text

.__

~ph nW-1 THE 8A8 COCK & WILCOX COMPANY k 4

POWER GENERATION GROUP DIVISION: NUCLEAR POWER GENERATION PCSITION DESCRIPTION Ex. W Fet ID

[ ~b J.R. Danyo j TITLE: SEC. MGR. , Pt. ANT PERFORNANCE SERVICE LEVEL:

OEPARTi4ENT: NUCLEAR SERVICE SECTION: FLSA STATUS: EXEMPT EEO 1 GROUP:

', REPORTS TO: MANAGER, NUCLEAR SERVICE DATE: 9/13/75

. LOCATION: LYNCH 8URG MAJOR RESPONSIBILITIES:

Manage segments of NSS startup.s which encompass fuel loading, physics testing, and power i i

escalation. Manage results engineering and evaluation for these segments. Manage reload l and other post-acceptance core and reactor operation work. Manage the collectior, analys is, l I and dissemination of all field collected data on B&W plants. Respons ib i l i ty includes management of planning, ex(cution, analysis, and reporting. ,

l REPRES ENTAT IVE RES PONS I B I L ITI ES :- "

Create a comprehensive test plan for reactor plant startup from fuel loading to final acceptance of the unit by the customer. Implements this plan by: '

1) Preparation of test specifications arid test guides for startup testing and detailed test procedures if required by contract. s
2) Training of the reactor . operations engineer and his staff of nuclear engineers for j advice and consultation to 88W customers during plant startup.

~

3) Technical support of the site advice and ' consultation team in the srea of nuclear engineering, reactor engineering and overall plant performance.
4) Evaluation of test results for acceptability and recommendation for corrective actions when not acceptable. Recommendation for escalation in power when results are acceptable

+

Manager the ihreparation of draft operating procedures for operation of *.he reactor plant at power, and when required by contract, detailed Operating procedures.

Manage the preparation and delivery of plant performance related nuclear training to

}

custtuner personnel in conjunction with the Manager Nuclear Training.

j Manage the results engineering program in the area of plant perforinance designed to assess the impact of startup testing on documentation and testing methods and techniques, including coordination with engineering units fer nodel checking and systems development.

EDUCATION: Sachelor's degreet in nuclear engineering accompanied by a broad knowledge of j

engineering fundamentals including practical applications.

EXPERIENCE: Approximately ten years experience. The majority of the experience should be in the area of power generation with a mir

  • mum of two years experience in reactor startuo.

(over)

, DATA FVRMisMEO SY E. 3 CoOOoIa F

. _ _ . Ots.ca PTION & EVALuAr: 0m PRtrARto,sv. [ ---

. _ . . .R ev i tu to sY M_Cl '

k)

_OlV.Lsl04 APPROVAT' ' *

  • 23 708

. . . . ._.G R O U P . A P.P R O V A L

.. CORPORAft WAGE & SALARY ADMINisTRAft0N APPRkAL B307060617 75G923 PDRADOCK05000g9 - - - - -- -- -

P