ML20084U358

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re RCIC Turbine Ddn 143 EGM Speed Control & Governor.Initially Reported on 730606.Cold Functional Test Unsuccessful Due to Lack of Speed Control & Speed Indication.Final Rept to Be Submitted by 730730
ML20084U358
Person / Time
Site: Browns Ferry, 05000000
Issue date: 07/06/1973
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084U341 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8306280644
Download: ML20084U358 (1)


Text

l l

ENNESSEE VALLEY A * ~ HOAlW y

CHA'TTANOOGA, TENNESSEE E

3'7401 40

\\

July 6, 1973

$NI E%

1 1

PAATNEASHip

(:

Mr. F. E. Kruesi, Director Directorate of Regulatory Operations 1

U.S. Atomic Energy Commission Q

Washington, DC 20545

Dear Mr. Krueci:

This is an interim report of a deficiency in Browns Ferry Nuclear Plant unit 1 RCIC Turbine (DDN 143) EGM Speed Control and Governor.

That deficiency was initially reported by M. M. Price to DRO Inspector W. S. Little on June 6, 1973, at the Browns Ferry site.

During an attempt to run a cold functional test on the RCIC turbine on May 31, 1973, the operator was not completely successful in running the turbine due to a lack of speed

+

control and speed indication. We are continuing our investigation (9

of the deficiency and the corrective action to be taken.

We e

expect to submit the final report on this deficiency by July 30, 1973

^

.A Very truly yours, s

  1. J. E. Gilleland Assistant to the Manager of Power j

]

CC:

Mr. Norman C. Moseley, Director h

Directorate of Regulatory Operations U.S. Atomic Energy Commission F

Region II - Suite 818 230 Peachtree Street, NW.

[

Atlanta, Georgia 30303 E

lf v9