0 0
A, Tlv1ti IsSTONG N POINT CO ffn#Mo',7%omacTicur ceiot A flORTHEAST UTtuTIES COMPANY July 27, 1973 United ~ States Atomic Energy Coninission
/
4' Directorate of Licensing Washington, D. C., 20545
/
-Dyt %.
lE7
['bdiYb
/
\\
Attention: Mr. A. Giambusso Deputy Director for Reactor Projects
(
AUG 2 1973> Ql R
\\
aw
Reference:
Provisional License DPR-21 4
y rinal bc rr ce A0-73-7
/
W. ;
Dear Mr. Giambusso:
On July 17, 1973, the Millstone Point Company notifed the AEC of a potential problem with the control blades and the notification was followed
. 3 on July 18, 1973 with a written notice A0-73-7.
This letter is being written to satisfy the ten-day requirement for j
reporting an abnormal occurrence to the Directorate of Licensing.
g 6pftM
\\*k'c', M; A report entitled " Reactor Control Blade EvaluatMtaining a 6//IN p
description of the problem, safety evaluation and an outline of the proposed k (ph plan of action was already filed with Mr. Donald Skovholt of the Directorate
('
of Licensing on July 23, 1973. The spe'cial report satisfies the requirements of a ten-day letter but does not refer to the abnormal occurrence number.
i 3 ;4 g It is the intent of this letter to satisfy the reportir.g requirement and to
\\,%#
establish the document of July 23, 1973 as the response for the abnormal yU occurrence.
As pointed out in the report, additional investigation is underway and -
further reports will be filed with the AEC.
Yours truly, JC Y
((ohnKufel
/
l Plant Superintendent L
8306230320 730727 Millstone Nuclear Power Station gDRADOCK05000 DPR-21
' tl
/
JK/fM:e1 5
dh f,gpr 5911 3
f I
COPY SENT REGION
- n. -
.