ML20084S159
| ML20084S159 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/16/1973 |
| From: | Worden W COMMONWEALTH EDISON CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084S151 | List: |
| References | |
| NUDOCS 8306160191 | |
| Download: ML20084S159 (1) | |
Text
_
{
l i
L._-
(.
f Telegram -_
EA3 E E
- M meglem union m
.C gg73nPR 16 PM 6: 18
~
VE3246(1916) (1-032340C106)PD 04/16/73 1914 ICS IPiVEIA MVN
(
01237 TDVE MORRIS IL 112 04-16 535P CST PMS MR BOYCE GRIER, DIRECTOR DIVISION OF COMPLI ANCE 4
REGION THREE US ATOMIC ENERGY COMMISSION 799 ROOSEVELT R0 GLEN ELLYN IL 60137 g
SU3 JECT DP4-25 DRESDEN NUOLEAR POWER STATION UNIT THREE.
(
THIS WILL CONFIRM A CONVERSATION WITH MR MAURA 0F YOUR OFFICE AT 1530 HOURS THIS DATE CONCERNING TWO SUSTAINED HIGh j
(
REACTOR PRESSURE SWITCHES BEING OUT OF CALI3 RATION. THESE PRESSUHE SWITCHES,1NI ATE ISOL AT ION CONDENSGR AFTEH A FIFTEEN SECO ND r.
TIME DELAY. ON 4-13-73 PS3-263-533 WAS FOUND TO TRIP AT
-,_[
1075PSIG AND PS3-263-53D W AS FOUND TO TRIP AT 1073PSIG. TABLE j
3.2.2 0F THE TECHIN AL SPECIFIC ATION ST ATES THE TRIP LEVEL SETTING SHOULD BE LESS THAN OR EQUAL 10 1070PSIG.
OF-121 M s
L
. _. _ _ ~.
AFTER THE CALIBRATION SWITCH 53B TRIPPED AT 1052PSIG ~ AND TH CWITCH 53D AT 1056PSIG.
W P WORDEN SUPERINTENDANT
&._JjDRESDEN NUCLEAR POWER STATI0ti
{ COMMONWEALTH EDISON CO e
IIs RR1
(
f
!MORRISILLINOIS h
(
0 t r usunaza (0111111 ina.a msar I Unbr.ats,
oAL DELIVEhY reqceste ?
(YES-AGENT, NO-AD au~
mac d
E8 s
16 n ADDJT,. Et, SECTION Ar b.. ~ t.
4Q I o
N.r.
o By Es k uw fl
'lia,e dad 9$h 4 To a l7 '
.w 8{
l f
To be.. A dr filed MM CJ -
a.m.
4ttempts to deliver (Indicate D& or BY)
.. -