ML20084R947
| ML20084R947 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/24/1974 |
| From: | Stephenson B COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084R941 | List: |
| References | |
| NUDOCS 8306160082 | |
| Download: ML20084R947 (1) | |
Text
.--
l, t
x,
-g i
h l r
OV C/
VU AGCY WHEA' VU MVN ILL i
E Q
5
$ pg 3 4
s yb I
umma WU VN ILL
. (&
815S422920 TDBN MORRIS IL 69 09-24 0333P EDT 5
PMS JAMES G KEPPLER, REGINAL DIRECTOR DIRECTORATE OF REGULATORY E
OPERATIONS-REGION IIIUS ATOMIC ENERGY COMMISSION, DLR
{
[799 ROOSEVELT RD M
GLEN ELLYN IL 50137 E
SUBJECT DPR-25 DRESDEN NUCLEAR POWER STATION UNIT' 3 WILL CONFIRM A CONVERSATION WITH F. MAURA 0F YOUR OFFICE AT llAM THIS DATE CONCERNING A THROUGH WALL CRACK DISCOVERED ON TORUS PURGE INLET LINE 3-8506-18".
THE CRACK WAS DISCOVERED
(~:
WHILE THE UNIT VAS SHUT DOWN AND LOCAL LEAK RATE TESTING WAS
.O IN PROGRESS.
'b INVESTIGATION INTO THE FAILURE MODE AND REPAIR' PROCEEDURES IS UNDERWAY.
STEPHENSON SUPERINTENDENT DRESDEN NUCLEAR POWER STATION COMMON WEALTH EDISON COMPANY RTE 1 MORRIS ILLINOIS 60450 suma 8306160082 760218