ML20084R921
| ML20084R921 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/30/1974 |
| From: | Stephenson B COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084R875 | List: |
| References | |
| NUDOCS 8306160063 | |
| Download: ML20084R921 (1) | |
Text
-
I' iC 3
95 3 09/30/74 Luestem union g
g l,
p' I
ICSI7'If3NGZ Cgp 59 20 MGM TD3N MORRIS IL 100 09-30 0522P EDT I
JAMES G KEPPLER REGION AL DIRECT 1R DIRECTORATE OF REGULATORY OPERATIONS REGION 3 !!S ATOMIC ENERGY COMMISSIO N 799 ROOSEVELT RD GLE!! ELLYN IL 60137
~
DPR-25 DRESDEN NUCLEAR POWER STATIO!! UNIT 3 THIS WILL CONFIRM A CONVERSATIO?! VITH C 9ROWN OF YOUR OFFICE AT 1600 HOURS THIS DATE CONCERNING A DISCOVERY OF LITS 3-263-72 A AND THE SET POINTS WHICH EXCEEDED THE LIMITING SETTINGS ALLOWED BY THE TECHNICAL SPECIFICATIONS.
THE SET POINTS WERE DISCOVERED TO 9E APPRnXIMATELY ONE TO TWO INCHES GREATER THAN THE 257 INCHES OF WATER DIFFERENTIAL PRESSURE PERMISSIBLE.
9 B STEPHENSON SUPERIuTENDENT DRESDEN NUCLEAR POWER ST ATION COMMONWEAL TH EDIS0N COMPANY RR 1 MORRIS IL 60450 1727 EDT MGMCG9A CGO 8306160063 74100s PDR ADOCK 05000249 S
'UCT' 1y
~-
v m.