Telecopy Ro:On 750218,during Local Leak Rate Testing,Leaking Containment Inserting Isolation Valve A03-1601-21 Discovered.Subsequent Insp of Valve Revealed Cracked Seat. Investigation in Progress to Determine Cause
ML20084R623
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/18/1975
From: Stephenson B
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084R621 List:
References
NUDOCS 8306150249
Download: ML20084R623 (2)


Text

.

C s

l Jc E8, Telegrarn '*

ln tuestem union 1

l 6

r

[f VEB332(l 738)(2-036754E049) PD 02/I8/75 1737 ICS IPMBNGZ CSP N

8159404449 TDBN MORRIS IL 02-18 0537P EST PMS JAMES G KEPPLER, REGIONAL DIRECTOR DIRFCTOR ATE OF REGUL ATORY }"

~

OPER ATIONS REGION 3 U.S.

ATO9IC ENERGY COMMISSION, VUX 2

ro 799 ROOSEVELT RD GLEN ELLYN IL_60137

SUBJECT:

DPR-25 9RESDEN NUCLEAR POWER STATION UNIT 3.

i mEE l

THIS WILL CONFIRM A CONVERSATION WITH PHIL JOHNSON OF YOUR OFFICE AT Q

1530 HOURS THIS DATE CONCERNING DISCOVE9Y OF A LEATING CONTAIN"ENT g

INERTING ISOLATION VALVE A03-1601-21, DURING LOC AL LEAK R ATE l

[jg TESTING. AT THE TIME, 1800 HOURS 2-14-75 UNIT 3 WAS OPERATING AT l

hO 396MWE. THE VALVE WAS BLIND PHLANGED TO SEAL OFF THE PENETRATION BY 0500 HOURS ON 2-15-75. S'JBSEQUENT INSPECTION OF THE VALVE VITH THE 4

j 4N,y COLD SHUT DOWN ON 2-16-75 REVEALED THE SEAT TO BE CRYMFD.

INVESTIGATION IS IN PROGRESS TO DETERMINE CAUSE AND ADDITIONAL INFORMATION WILL FOLLOW IN A 10 DAY REPORT.

B B STEPHENSON SUPERINTENDENT DRESDEN NUCLEAR POWER STATION COMMONWEALTH EDISON C0 RR t MOR9IS ILLINOIS 60450 i