Clarifies Response to NRC Re Violations Noted in IE Insp Rept 50-482/84-05.Corrective Actions:Const Will No Longer Have Blanket Directive to Install Nylon Screws. Installation Will Be Made on case-by-case Basis
ML20084Q071
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/18/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20084Q063 List:
References
KMLNRC-84-065, KMLNRC-84-65, NUDOCS 8405210087
Download: ML20084Q071 (1)


Text

.

KANSAS GAS AND ELECTRIC COMPANY THE ELECTFhC COMPANY CLENN L M O E S T el R wact entssoENT. Nuce aan April 18, 1984 Mr. E.H. Johnson, Acting Chief Reactor Project Branch 2

~~

q 20W2 W U.S. Nuclear Regulatory Commission i

Region IV I

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

'Ob KMLNRC 84-065 Re:

Docket No. STN 50-482 Ref: Letter KMLNRC 84-050 dated 3/29/84 from GLKoester, KG&E, to JEGagliardo, NRC Subj: Supplemental Response to Inspection Report STN 50-482/84-05

Dear Mr. Johnson:

The Reference provided Kansas Gas and Electric Company's (KG&E) response to the Notice of Violation documented in Inspection Report STN 50-482/

84-05.

This letter provides a clarification to one of the statements in the Reference concerning the corrective steps taken by KG&E.

In the last sentence under Response a) on page two of the Reference, KG&E stated that "The practice of using nylon screws as isolators by Construction has been terminated and is no longer authorized." The intent of this statement was to indicate that Construction would no longer have a " blanket" directive to install nylon screws. KG&E does intend to continue using nylon screws and in some caseu these screws will be installed by the Constructor. However, the Constructor will not be authorized to install nylon screws unless specifically directed on a case-by-case basis by KG&E Startup. Startup will then maintain traceability of Constructor installed nylon screw.; in accordance with Administrative Procedure ADM 14-405, "Te'mporary Modification Control" and/or other approved tracking mechanisms to assure that the isolators get removed.

If you have any questions concerning this clarification, please contact me or Mr. Otto Maynard of my staff.

8405210087 840502 Yours very truly, PDR ADOCK 05000482 Q