Responds to NRC Re Violations Noted in IE Insp Rept 50-482/84-05.Corrective Actions:Startup Administrative Procedure ADM14-405, Temporary Mod Control, Revised to Require Use of Temporary Mod Tags When Nylon Screws Used
ML20084Q012
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/29/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20084Q000 List:
References
KMLNRC-84-050, KMLNRC-84-50, NUDOCS 8405210064
Download: ML20084Q012 (2)


Text

r f

unsas cas ano necinc cowaur

^

TFE ELECTFhC COMPANY OLENN l MOESTER v>CE PRE S#DLu?. usuCLE AN March 29, 1984 Mr. J.E. Gagliardo, Acting Chief 5^WP i

'{ 2 3 Reactor Projects Branch 2

.i21Y p1 U.S.. Nuclear Regulatory Commission Region IV g

2@

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 I

KMLNRC 84-050 Re:

Docket No. STN 50-482 Subj: Response to Inspection Report STN S0-482/84-05

Dear Mr. Gagliardo:

This letter is written in response to your letter of February 29, 1984, which transmitted Inspection Report STN 50-482/84-05. As requested, the violation (482/8405-1) identified in the Inspection Report is being addressed in three parts.

a) The corrective steps which have been taken and the results achieved; b) Corrective steps which will be taken to avoid further violations; and

3) The date when full compliance will be achieved.

VIOLATION: FAILURE 'IO PROVIDE CONTROL OF ' HIE USE OF NYLON SCREWS IN ELECTRICAL TERMINATIONS Finding:

10CFR Part 50, Appendix B, Criterion V, requires that activities affecting quality shall be prescribed by documented instructions, procedurea, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instruction, procedures, or drawings.

Contrary to the above, there was no procedure to control the temporary use of nylon fasteners for electrical terminations

\\

0 nor to control the replacement of these temporary nylon fasteners 8405210064 840412 PDR ADOCK 05000482 0

PDR 201 N. Market - Wichita, Kansas -Man Address: PO. Box 208 I Wwhita, Kansas 67201 - Telephone: Area Code (316) 261-6451

I 1(

'I 4

.w.

Mr. J.E. Gagliardo KMLNRC 84-050 March 29, 1984 Finding (continued) :

with permanent metal fasteners or to assure during this replace-ment, that all the electrical terminations were landed on cor-rect termination points.

Response :

a) Corrective steps which have been taken and results achieved:

Startup Administrative Procedure ADM 14-405, " Temporary Modification Control" has been revised to require the use of Temporary Modification Tags when nylon screws are to remain installed upon completion of Startup Testing.

This provides identification and traceability for removal prior to conducting Preoperational Testing. The practice of using nylon screws as circuit isolators by Construction has been terminated and is no longer authorized.

b) Corrective steps which will be taken to avoid further violations:

Startup and Construction hae developed a Two Phase Program to identify (Phase I) and remove (Phase II) all previously installed nylon screws.

During Phase I of the program the Construction group will physically identify by panel and termination the location of installed nylon screws.

During Phase II of the program, Startup will review the results of Phase I identification program and will replace the temporary nylon screws with permanent terminations in accordance with approved procedures. Additionally, twenty (20) other panels not identified in Phase I will be randomly selected and inspected to ensure the program identifies and removes all of the temporary nylon screws.

c) Full compliance will be achieved prior to Fuel Load.

Please contact me or Mr. Otto Maynard of my staff if you have any questions concerning this response.-

Yours very truly, ft

///

Glenn L. Koester Vice President - Nuclear GLK bb cc: WSchum-