ML20084P283

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1984
ML20084P283
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 04/30/1984
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-84-68, NUDOCS 8405180087
Download: ML20084P283 (17)


Text

.

AVERAGE DAILY UNIT POWIR LEVEL DOCKET NO. 50-250 UNIT Turkey Point #3 5-15-84*

DATE COMPLETED BY N.W. Grant TELEPilONE (305) 552-3675 April 1984' MONE DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) lMWe Neti 690 I

i]

684 l8 AR7 3

621 19 688 l

687 682 4

20 689 679 5

,3 674 6

7 691 673 7

23 0

463 8

24 687 594 9

25 686 130 to 26 686 II 684 12 13 ara 39 I4 656 30 608 1S 31 675 16 INSTRUCTIONS I of 88 ay in the reporting inanth. Compute to he neare t h il ga var:

(9/77) 8405180087 840430 PDR ADOCK 05000250 R

PDR f $bfl

m OPERATING DATA REPORT DOCKET NO.

50-250 DATE.3-15-84 COMPLETED BY N.W. Grant TELEPHONE (105) 552-367@

OPERATING STATUS Turkey Point #3 Notes

1. Unit Name:
2. Reporting Period:

An ril. 1984 Unit #3 operated at full power except as indicated in

3. Licensed Thermal Power (MWI):

2200 the " Unit Shutdowns and Power 760

4. Nameplate Rating (Gross MWe):

Reductions" Report.

5. Design Electrial Rating (Net MWe): 691
6. Maximum Dependable Capacity (Gross MWe):

700

7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report, Give Reasonc
9. Power Level To which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr to-Date Omnulatige

!!. Hours in Reporting Period 719 2903 99 968.6

12. Number Of Hours Reactor Was Critical 607.3 2353.6 68 659.8
13. Reactor Reserve Shutdown Hours 0

0 644.4

14. Hours Gei.erator On.Line 604.5 2273.0 68 195.0
15. Unit Reserve Shutdown Qours 0

0 121.8

16. Gross Thermal Energy Generated (MWlf) 1 101 105 4 R12 154 140 300 946
17. Gross Electrical Energy Generated (MWH) 422 985 1 557/160 44 767 725
18. Net Electrical Energy Generated (MWH) 401 868 1 472 420 42 385 437
19. Unit Service Factor 84.1

/6.3 08.2

20. Unit Availability Factor d?.1

/8.3 68.3

21. Unit Capacity Factor (Using MDC Net).

ca.3 76.2 65.5

./

u.2 61.2

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 1.3 13.3 5.6
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eachl:
25. If Shut Down At i e d Of Report Period. Estimated Date of Startup:

Mav 13. 1984 (actual)

26. Units in Test Statu. (Prior to Commercial Operation):

Forecast At hined INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCI AL OPER ATION (9/771

-,a 50-250 NO UNIT SHUTDOWNS AND FOWER REDUCTIONS lurkey Point ed E

DATE b-15-84 ColWLETED BY N.W. Grant REPORT 40 NTH APF11' 1984 TELEPHONE (305) 552-3675 33 3

hE Licensee

,E g Cause & Corrective N...

Dare i

3g i

2s&

Event g

?

Action to fE E

j g.g Report a v> U 0

Prevent Recurrence F

g d

11 840424 F

.7.7 A

3 250-84-14 1B GENERA Reactor tripped on high pressure following runback caused by non-licensed operator error on removal of an invertor from service.

12 840426 S

106.8 B

l ZZ ZZZZZZ Unit taken off line for Unit 4 safe-guards test, snubber inspection and steam generator feedwater nozzle inspections.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S StheduleJ A-Equiprnent Failure (Euplain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licemec C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction

$Other t Explain) 0161)

I 4)perator Training & License Esamination 9,

5 F-Adrrunntrative G Operati.wial I~rrior (F = plain) 4. 4eao AEowc.,..e#

Exhibit I - Same Source l'8/77)

Ilf)ther i Esplaini

CUMMARY OF OPERATING EXPER.TENCE i

DOCKET NO.

50-250 UNIT Turkey Point' Unit #3 DATE May 15,1984 COMPLETED BY N.W. Grant

~

TELEPHONE REPORT I40 NTH Anril. 1984 Unit #3 operated at essentially full power except as indicated in the

" Unit Shutdowns and Power Reduction" Report.

Inspectica and requirements of IE Bulletins and NUREG-0737 are continuing.

l Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional infonnation.

1

+

4 f

[

l

U AVER AGE CAlLY UNIT POWER LEVEL DOCKET NO.

50-251 Turkey Pt. #4 g,7 DATE 5-15-84 COMPLETED BY N.W. Grant TELErilONE (305)S52-3675 April, 1984 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

. (Mw,. Net )

1 If 2

is 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 II 27 12 25 13 29 14 30 IS 31 16 t

r INSTRUCTIONS On this format.hst the ases. ige daily unit power leselin MWe Nei for each day til the reporting m.mth. Compute to I

she nearest whole twgawati.

t l

(9/77) i I

l

OPERATING DATA REPORT DOCKET NO.

_50 '251 DATE 5-15-84 COMPLETED BY N.W. Grant TELEPHONE (1nRI RR2-367@

OPERATING STATUS

1. Unit Name:

Turkey Point Unit #4 Notes

2. Reportingreriod: April, 1984 Unit #4 remained out of 2200
3. Licensed Therrsal Power (MWt):

service for refueling and

4. Nameplate Rating (Gross MWe):

scheduled. maintenance.

/60

5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe):

700 666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power f.evel To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to Date Omnulatise II. Hours in Reporting Period 719 2 903 93 696

12. Number Of Hours Reactor Was Critical 0

1 316.6 65 955.2

13. Reactor Reserve Shutdown Hours 0

0' 166.6

14. Hours Generator On.Line 0~

1 269.3 63 737.4

15. Unit Reserve Shutdown Qours 0

0 31.2

16. Gross Thermal Energy Generated (MWil) 0 2 761 901 134 508 642
17. Gross Electrical Energy Generated (MWH) 0 898 385 42 819 687

-1 003 SU IW

% W 228

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor n

43.7 68.0

20. Unit Availability Factor 0

43.7 68.1

21. Unit Capacity Factor (Using MDC Net) -

0 43.8 66.8 42.1 62.5

22. Unit Capacity Factor (Using DER Net) 0
23. Unit Forced Outage Rate n

21 1 4.8

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl:

May 22, 1984

25. If Shut Down At End Of Report Period. Estimated Date of Startup:'
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achioed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION (9/771

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turkey Point #4 DATE 5-15-84 ND BY NW Grant REPORT MONTH Aoril. 1984 TELEPHONE ( 'tn g i qq9_tg74 Licensee Eg h*l,

.5?

3 h Y~k Cause & Corrective 1

Action to No.

Date g

3g

(

,;; g 5

-Event u?

j'3 c$ E E

jdi-y Report a rN G Prevent Recurrence c5 07 840308 S

719.0 C

4 RC FUEL XX Unit #4 remained off line for re-fueling and scheduled maintenance.

i I

2 3

4 F: Forced Reason:

Method:

Exhibit G -Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report iLER) File (NUREG-D-Regulatory Restrietion 9-O her(Explain) 016l) t Operator Training & Ucense Examination F-Administrative 5

G-Operational Er ror ( F splain) 4-. f.o ao AEeve Exhibit I - Same Source (9/77) 11-01her ( Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-251 UNIT Turkey Poi'nt Unit #4 DATE May 15,1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH April, 1984 Unit 4 remained off line for a refueling and scheduled maintenance outage.

Inspections and requirements of IE Bull'etins and NUREG-0737 are continuing.

Florida Pcwer & Light Company commitments to NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional infonnation.

..)

6 0

e

m AVERAGE DAILY UNIT POWIR LEVEL DOCKET NO.

50-335 UNIT St. Lucie #1 DATE 5-15-84 COMPLETED BY N.W. Grant 00 W -3 M TELEPilONE April, 1984 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)

.(MWe Net)

If 2

18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 Il 27 12

~~

~

28 13 29 14 30 IS 33 16 o

INSTRUCTIONS On this funnai,hst the aserage daily unit power leselin MWe Nei for each day in the reportirg in.inih. Compute lo the nearest whole exgawait.

(9/77) 9 L

I t

EE UNtT SHUTDOWNS AND POWER REDUCT10,3 DOCKET NO.

UNIfMAME St. Lucie Unit #1 DATE S-15-84 April, 1984 Courtz1tD sy N_W_ Grant REPORT MONTH TELgygaONE (1ng) E g 7_ v 76 f*3 5?

3 Ei Licensee Ca== & Correctiw Da'e i

5' 4

.2 s E Event

?

c-Actiin to

$5 s

jdi.g Repswt *

'E V O

Prevent Recurrence d

03 830226 5

719.0 C

4 RC FUEL XX Unit #1 prepared to return to power following refueling and scheduled maintenance. The reactor was made critical during the period, but the unit was not placed on line and the reactor was subsequently shutdown again.

I i

3 4

F-F wsJ Reaum:

Method:

Exhibit C - Instructites 5 Schedde3 A Equipment Fadure(Esplain)

1. Manual for Preparation of Data B-42mtenance ct Test 2-Manual Scram.

E itry Sheets for fxensee ORefae!rg 3-Automate Scram.

Event Report iLER) Fde (NUREG.

t>Repdatm Restrict im

@@heriEsplamI 0161)

I Operator Trammg & 1xense Isansnathm 9,

5 F-Adnunntrat rie GOperatum,I Fir..e Fsplamt 4

44. A sewc

.,3 Eshibit I - Same Source raf77)

II O terdE=plaml

OPERATING DATA REPORT DOCKET NO. 50-335 DATE 5-15-84 COMPLETED alY N.W. Grant TELEPHONL ho4) 647-367!

OPERATING STATUS

3. Unit Neme:

St. Lucie Unit #1 Noin 2, Royertingreelod: MI M84 Unit #1 prepared to return to 2700

3. Lleensed t hesmal Power (MWt):

service fol)owing refueling g,

4. Nenwpiste Rating (Gross MWe):

and scheduled maintenance.

N S. Design Electrieel Rating (Net MWe):

6. Menimum Dependable Cepecity (Grow MWe):

867 022

7. Menimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasone l

l

9. Power Leel To Which Restricted. lf Any (Net MWe):
10. Reasons F6: Restrictions.If Any:

This Month Yr..to Dete O..m.i :he ll. Hours in Reporting Period 719 2 903 6d 8;11

12. Number Of Neers Reector Was Critical 53.6 53.6 44 519 7 5
13. Reactor Resem Sheedown Hom 0

0

'205.3 U

U 43 b/b.2 Bd. Hows Gawrotor On4.Ine 0

0 39.3

15. Unit Reserve Shutdown gour,
16. Genes Thermel Energy Gemreted (MWH) 2 025 2 025 108 669 963 0

0 35 J/3 Ulb 17, Crom Electrical Energy Genreted (MWH)

~D

  • JJ J" #
14. Net Electrieel Energy Genmied (MWH)
19. Unit Service Facto, 0

0 67A

30. Unit Aveleobility Feeto, 0

0 67.6 0

0 65.4 i

21. Unit Cepecify Factor (Using MDC Ne )

U U

63*7 l

22. Unit Cepecify Factor (Uning DER Net) u u

{

23. Unit Forced Outage Rete g.o 24, Shutdowns Scheduled 0$er Neat 6 Monthi(Type.Dete and Duratkin of Eachl:

4 l

25. If Shut Down At [nd Of Neport Perl, titimated Dele of Stettup-N8Y 10' I984

]

24. Uniti ln 1nt Status lPalor to Commmlet Operation):

Forecent Ailin ied i

INiilAL CRITICALITY INITIAL ELFC1RICliY l

COM4LRCIAL OPER AT10N mw

i i

(

SUMMARY

OF OPEllAT NC _E.XPEltIENCC i

I I

DOCKET No, 50-335 l

St. Lucie Unit 1 l

UNIT DATE l'ay 15,1984 COMPLETED BY N.l!. Grant TELEPHONE (305) 552-3675 April 1984 MM MNTH i

St. Lucie Unit 1 prepared to return to power following a refueling and scheduled maintenance outage.

Inspections and requirements of IE Dulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional infonnstion.

in accordance with requirements of NUREG-0737 Item !!.K.3.3, there were no challenges to PORV or safety valves during the report month.

e t

__________m.____________

r

+

AVER ACE CAlLY UNIT POWER LEVEL DOCKET NO.

50-389

2 UNIT 4t I ochi Unit #f DAlt 5-15-84 N.W. Grant COM.aLETED BY 1ELEPilONE (305) 552-3675 I

MONnt _ April.1984 DAY AVER ACE DAILY POWER LEvr.L DAY AVER AGE DAILY POWER LEVEL (MWe Net!

lMWe Nets 814 814 806 814 2

la 814 3

I' 814 OIO i

4 20 013 813 3

.I 806 814 6

22 7

747 23 812 747 s

24 813 816 810 25 10 815 26 810 816 790 11 27 12 815 24 nin 13 815 807 29 14 nu 30 nnn 15 814 J1 816 4

16 INSTRUCTIONS On this funn,e,in, the dsef ase daily una pinwer I,,,g in yw,3,, gor each day in the rep enn; ni. nth Compute su the nearest wh.,1,,wpw,,,,

49/771 6

4

OPERATING DATA REPORT DOCKET NO.

50I389 DATC Mav 16. 19" COMPLETED BY N_id. Grant TELEPHONL I tnqi (;2-3L OPERATING STATUS

{g u d.Q apris, ivu9 Unit #2 operated at essentially St. Lucie Unit #2 Wies

3. Lleensed Thennel Power (MWI):

2560 full power

4. Nameplete Rosing (Geees MWe):

850 804 S. Design Electrieel Reting (%t MWe):

OE

6. Mesimum Dependable Cepecity (Grom MWe):
7. Mealmwn Ikpendeble Capaciay (Et MWe):

7AI!

8. If Changes Occur in Cepecify Ratinge (Items Nwnber 3 Through 7) Since last Report. Give Renone
9. Power Lawl To Which Restakted.lf Any (Net MWe):
10. Restone For Reserktions.lf Any:

This Month Yr. to Dete O.mulatise i1. Heun In Reporting Period

12. Number Of Neurs Reectw Wes Celtical 719 2 884.4 6 111.4
13. Reseter Reserw Sheldown Hows 0

0

0

14. Hours Generefor On4.Ine 719 7 7an r, q n7o_n
15. Unit Reerew Shutdown gours 0

0 n

16.' Crem Thor nel Energy Genreted (MWH) 1 829 680 6 931 557 14 589 501

17. Crees tlectrieel Energy Genereted (MWH) 612 700 2 328 280 4 871 500 500 586 2 201 054 4 598 640
18. Net Electriesl Energy Genereted (MWH) 133 a u a - r-'-

r

20. Unit Availability Factor
21. Unit Cepecity Factor (Using MDC NI) 102.7 96.5

_ _.21.3

22. Unit Cepecity Factor (Uning DER Nt) 100.4 94 3 89,3 2
23. Unit Forced Outage Rete 0
4. T _

/.8

24. Shutdowns scheduled Oier Next 6 Months (Type. Dete.end Duration of Each):
25. If Shut Down At End Of ReporI Period. Estimated Date of Startup:
26. Units in Test sielui(Psior to Commercial Operation):

Forecast Ailiined INITIA L CRiilCALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION e

1

.,,e LMIT SHUTDonNS AND FUWER REDtsCTIONS DOEEETNO. M 'IRQ UlWT NAISE

<t turin e tn i t #2 DATE E IE ?*

REPORT e00 NTH April, 1984 N BY

% ",. C r; 7. :

TEurse0NE i,

s c-s

,e,e t m' u J J J JL av s J

.=

-c w.m i?

E 3s4 Lxensee

.E

  • j"?

Oswer a correcti.e W

Ih'c i

3=

4 2s&

Event

=7 a.

Acti.m to j0

!.E E

j i.=

Ree=t *

  • E G Prevent Recurrence d

Unit #2 had no shutdowns or significan :

power reductions.

I 3

4 F-F.wed Reaum:

44ethod Eskibit G. Instructions

% Sim!ufed A Equrpment Fai1=re(Euptain)

I-Menest for Preraration of Data B-Mamtenance er Test 2 94anual Scram.

Entry Sheets for IArnsee C-Refueteg 3-Aatomatic Scram.

Event Report (LE R) File (NUREG-D Regularm Restrictum QOhcriEsplaml 0161)

I I);wator Trainmg & lxenw Esammatam I ~

O'** * ***"

5 F-Adrrmarstratise Goreratavial f rme tF =plam) a. 4 4.

A A nwr Esh+it I - Same s.=r.x I"8/77)

II-Orher Ii urtaal

SUMMARY

OF OPERATING E.XPnitIENCC

{

f DOCKET NO.

50-389 I

l UNIT St. Lucie Unit #2 l

l DArg May 15, 1984 l

i COMPLETED BY N.W. Grant l

1 (305) 552-3675 i

t TELEPHONE l

33 PORT MONTH Apri). 1984 L

i Unit 2 operated at essentially full power.

l Inspections and requirements of IE Dulletins and NUREG-0737 are continuing.

[

Florida Power & Light Company comitments for NUREG-0737 implementation are l

l continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6.9.1.6 there j

l were no challenges to PORV or safety valvos during the report month.

l 5

i i

l t

l

[

t l

l l

l

\\

[

F LOlilD A POWf H & t,1GH T COMP ANY I

fiay 15, 1984 PNS-LI-84-68 i

Director. Of fice of Resource finnagement U.S. Nucicar Regulatory Commission Washington. D.C.

20555

Dear Sir:

r Attached are the April 1984 Operating Status Reports and Operating Sunmary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours.

Y&dM J.W. Williams, Jr.

Group Vice President Nuclear Energy JWW/PLP/cas Attachment 1

cc:

J.P. O'Rollly. Region !!

1 l

'h

,, m...,

s,..

-