ML20084N984
| ML20084N984 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/05/1975 |
| From: | Stephenson B COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084N979 | List: |
| References | |
| NUDOCS 8306090148 | |
| Download: ML20084N984 (1) | |
Text
_ _ _ _ _ _ _ _
a f -)
~i 2-f
-WU MVN I L bM3N m.!
AGCY WHEA OE JUN
_E E
WUA 209 JP 537P CDT
'{
VEC317(1620)(2-034616E156)PD 86/05/75 1619
- #D 'd /N "jj ICS IPMSNGZ CSP 8159424449 TDBN MORRIS IL 88 96-55 5419P EST PMS 'J AMES G KEPPLER REGIONAL DIRECTOR DIRECTORATE OF ' REGULATORY-OPERATIONS REGION 3' WUX US NUCLEAR REGULATORY COMMISSION, DLR E
739 P.00SEVELT RD GLEN ELLYN IL g-SUBJECT DPR-25 DRESDEN NUCLEAR POWER STATION,> UNIT:3'.-
b-THIS WILL CONFIRM A CONVERSATION WITH MR P JOHNSON ~0F YOUR 0FFICE AT
' 1500 HOURS THIS DATE CONCERNING ACTUATION OF THE STANDBY LIQUID CONTROL SYSTEM PUMP DISCHARGE RELEASE VALVE BELOW TECH SPEC LINITS DURING REFUELING OUTAGE SURVEILLANCE. THE "AS FOUND" SET POINTSGF usgs THE ~3 A AND 3B VALVES WERE 1250 AND 1320 PSI RESPECTIVELY. DUE TS A PROCEDURAL INADEQUACY, THESE ACTUATIONS WERE PERFORMED 13 DAYS PRIOR-
_ T01THIS NOTIFICATION, _ DURING ' REVIEW OF THE SURVEILLANCE PACKAGE.
4.E
-55 h
e30609014e 750613 DR ADOCK 05000 B B STEPHENSON SUPERINTENDENT DRESDEN NUCLEAR' POWER-STATION" I
-E COMMONWEALTH' EDISON C0 RURAL ~ ROUTE 1 MORRIS IL 65450 s
% m To:
U MVN ILL b.
ssic _
JUN 6 W5
- hge, U AGCY WHEA UC --.
_O
,