ML20084N651

From kanterella
Jump to navigation Jump to search
Submits Correction to AO 50-249/75-44.Release Activity Was 0.694 Ci/S Instead of 0.694 Mci/S
ML20084N651
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/23/1975
From: Stephenson B
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084N649 List:
References
841-75, NUDOCS 8306080409
Download: ML20084N651 (1)


Text

r.

(" g[f U X. Q..

-Q, C: mmh: lth Edis::n

,, g; g f, k.

_*,.g

'( =. ;

one First..mxnal Plaza. Chicago. luncr

'v-

\\*. g\\

~A Address Rep:y to: Post Office Box 767 Ibg{,, p {j J

\\-

g Chicago. lHinois 60690 JAN.L21976

  • i C

u,s.,m w r : m s k 52EEN c

ss BBS Ltr. #841-75 Dresden Nuclear Power Station RR #1 Horris, Illinois 60450 December 23, 1975 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operation-Region ill U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

SUBJECT:

CORRECT 10t1 TO ABNORMAL OCCURREllCE REPORT ENTITLED "0FF-GAS INCREASE ON UNIT-3" (Report I;o. 50-249/75-44)

Reference:

Abnormal Occurrence Report 50-249/75-44 dated December 11, 1975 Report Number: 50-249/75-44A Report Date:

December 23, 1975 Facility:

Dresden Nuclear Power Station, Morris, Illinois 60450

{

Dear Mr. Keppler:

An error has been identified in the referenced report under the caption " Conditions Prior to Occurrence." Stack release activity of November 25 was erroneously given as.694 curies /second:

the actual stack release approximated.694 millicuries /second.

I Sincerely, AW'

, f SNDO h

B. B.'Stephenson Superintendent BBS:smp File /NRC gg 8306080409 770331 PDR ADOCK 05000249 S