Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Point _3 DATE April 15, 1983 COMPLETED 15Y P 1 paco TELEFilONE _'(305) 552-3654 MONDI tiarch, 1983 .
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (5 Y Net)
~
.(Mget) i 17 2 697 698 3
696 643-3 4 339 20 691 692 5 .,
689 697 6 22 ___
7 689 23 700 8 696 699-24 '
593 701 9 25 10 696 702
. 26 699 700 27 I 698 I2 ,g 05 697 13 -
702 695 14 30 IS 696 3,
700 16 INSTRUCTIONS On this format.hst the ases. ige daily unit power leselin MWe-Set for ea:h day in the reportin;inonth. Compute to the nearest whole megawart.
(9/77) 8306020216 830415 DR ADOCK 05000250 PDR
\
OPERATING DATA REPORT DOCKET NO. 50-250 DATE Anril 1s 1983 COMPLETED BY P'. L. Pace TEl.EPilONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name:
Turkey Point 3 Not" Unit 3 operated at es-March, 1983 sentially full power except
- 2. Reporting Period:
??00 for a brief 0utage for
- 3. Licensed Thermal Power (MWt): ,
760 plant modification.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical RatinglNet MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 680 646
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lesel To which Restricted. If Any (Net MWe):
- 10. Reasams For Restrictions,if Any: -
This Month Yr..:o-Date Cumulatise i1. Hours in Reporting Period 744 2160 90.465.6
- 12. Number Of Hours Reactor Was Critical 741.6 2126.8 63,646.1
- 13. Reactor Reserve Shutdown Hours 0 0 844.4
- 14. Hours Generator On.Line 735.2 2046.9 61.552.0
- 15. Unit Resene Shutdown Hours 0 0 121.8
- 16. Gross Thermal Energy Generated (MWH) 1,615,637 4,487,068 125,904,980
- 17. Gross Electrical Energy Generated (MWH) 532,920 1,477,585 40,139,705 b @ ,'7 F ~ l,408,59/ 3/ 996,149
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor 98.8 94.8 68.0
- 20. Unit Asailability Factor 98.8 94.8 68.2
- 21. Unit Capacity Factor IUsing MDC Net) 105.8 100.9 65.0
- 22. Unit Capacity Factor (Using DER Net) 98./ 94.1 60.6 U 4*D D/
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEP.ATION 19/77)
JN
T UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turkey Point 3 DATE April 15, 1983 COMPLETED BY P. L. Face REPORT MONDI flarch, 1983 TELEPHONE (305) 552-3654 x -
= ,_
3e ei p
3 = :: .-
Licensee S" Cause & Correceive
. 7 s 'A jgg c -r. 5; .
No. Date g 3g g Event u? E"E Action to
$5 j di g Report = Preve ,1 Recurrence 6
5 830320 S 8.8 H 1 EB ELECON The unit was removed from service to facilitate installation of auxiliary power upgrade modifications.
I 2 3 4 F: Forced Reason: Method: Exlubit G - Instructions S: Scheduled A Equipment Failure (Explain) 14hnual for Preparation of Data B-Maintenance of Test 2 Manual Scram- Entry Sheets for beensee C Refuehng 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction C{Other (Explain) 0161)
EOperator Training & License Examination F-Administratise 5 G-Operational Error ( E xplam ) s . to ac. 44a,ve.a. .ct Exhibit I - Same Source (9/77) llother (Explam) i t
~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO,. ,50-250 UNIT _ Turkey Point 3 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH March, 1983 Unit 3 operated at essentially full power execpt for a brief outage to facili-tate auxiliary power upgrade modifications.
11ajor safety related maintenance activities included:
Several reactor protection circuits were repaired.
A boric acid heat tracing circuit was replaced.
A reactor .incore instrumentation detector cable was replaced.
l Inspections and reiuirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company. commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional informa tion.
f i
l l
l
[
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 April 15, 1983
~
. DATE COMPLETED BY P. L. P' ace TELEPflONE 1305) 552-3654 f
MONTH thrch. 1983 -
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net) -(MWe-Net )
, --- I ,e 2 gg 3
6 22 y .__ .._
g
~
9 25
--- ~~~
10 , 26 12 3 13 39 14 30 IS 33 I
INSTRUCTIONS On this format. fist the average daily unit power leselin MWe-Nei for each day i.: the reporting:nonth. Compute to the nearest whute megawart.
l (9/77)
OPERATING DATA REPORT DOCKET NO. 50-251 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 OPERATING STATUS Notes
- 1. Unit Name:
Turkey Point 4 Steam Generator Repair
- 2. Reponing Period:
fiarch, 1983 program in progress.
- 3. Licenwd Thermal Power (MWI):
2200 760
- 4. Nameplate Rating (Gross MWe):
- 5. Design Elcetrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 680
- 7. Masimum Dependable Capacity (Net MWef: 646
~
- h. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Ghe Reasons:
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr. to-Date Cumularise i1. Hours in Reporting Period 744 2160 84.193
- 12. Number Of Ilours Reactor Was Critical 0 0 59.855.3
- 13. Reactor Reserve Shutdown Hours __
0 0 166.6 0 0 57.896
- 14. Hours Generator On-Line
- 15. Unit Resene Shutdown Hours 0 0 31.2
- 16. Gross Thermal Energy Ge'nerated (MWH) 0 0 121,918,244
- 17. Gross Electrical Energy Generated (MWHI 0 0 38,775,512
-1553 -3526 36~,727,096
- 18. Net Electrical Energy Generated (MWil)
- 19. Unit Senice Factor 0 0 68.8
- 20. Unit Asailability Factor 0 0 68.8
- 21. Unit Capacity Factor (Using MDC Net) 0 0 67.5
- 22. Unit Capacity Factor IUsing DER Net) 0 0 62.9 0 0 3.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type, Date,and Duration of Each):
- 25. C." Shut Down At End Of Report Period. Estimated Date of Startup: Ma y. 1983
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION i
DOCKET NO'. 50 251 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT N AME Turkey Point 4 DATE April 15, 1983 COMPLETED gy _P . L . Pa c e REPORT MONTH March, 1983 i TELEPHONE (305) 552-3654 1
":= c 53 3 -.*$5 Licensee 5 r, jeo Cause & Currective l No. Date {
i-3g
( jg5 Event Reporia m 3, V7 93 E'
Action to
$ 3 e 5 =! v Prevent Recurrence i 6 i
4 18 821009 S 744 H 4 HB HTEXCH Steam Generator Repair Program in
- accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.
h i
i l
l 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions ,
S: Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data !
B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Pefueling 3-Automatic Scram. Event Report tLER) File (NURI G-i D-Regulatory Restriction 9-Ot her ( Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative p ,
5 G-Operational Error (Explain) c . /.e; 4. asewci..cl Eshibit I - Same Source (9/77) Il-O her(Explain) b
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH u,,,.s, 3003 Unit 4 continued the Steam Generator Repair Program. -
Other major safety related maintenance activities included:
Several reactor protection circuits were repaired.
Numerous instrumentation transmitters were replaced.
A boric acid heat tracing circuit was repaired. .
A safety injec_tio.n breaker was repaired.
Inspections and requirements of IE Bulletins and flVREG-0737 are contin'uing.
Florida are Power & Light Company commitments for flVREG-0737 implementation continuing.
in forma tion. Refer to correspondence between FPL and flRC for additional r.
4
- p
..'y f:
- 4" l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St. Lucie 1 April 15, 1983
, DATE COMPLETED BY - P. L. Pace TELEPHONE (-305) 552.365'4 MONTH !brch. 1983 -
DAY AVERAGE DAILY POWER LEVEL - DAY AVER 3 GE DAILY POWER LEVEL (MWe Net) -(MWe-Net) g 2 gg 3 39 4 ---
20 ---
5 -
3 6 22 7 .
23
-~ ~~~
8 24 .
10 1 26 1,
28 13 29
( ,,
15 3g 16 INSTRUCTIONS On this format.hst the average daily unit power lesel in MWe-Nei for each day in the reporting anonth. Compute to the nearest whole megawart.
(9/77)
OPERATING DATA REPORT DOCKET NO. 50-335 DATE April Ib, 1983 COMPLETED BY P. L. Pace TEI EPilONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name:
St. Lucie 1 Note $ Unit I remained out of flarch, 1983 service for refueling and
- 2. Reporting Period; 2200 scheduled maintenance.
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 890
- 5. Design Electrical Rating (Net MWe):
830 862
- 6. Masimum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe): 817
- 8. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumularise i1. Ilours in Reporting Period 744 2160 55.008
- 12. Number Of Ilours Reactor Was Critical 0 1366.9 44,466.1
- 13. Reactor Reserve Shutdown Hours 0 0 205.3
- 14. Ilours Generator On-Line 0 1350.9 43,576.2
- 15. Unit Rewrve Shutdown l{ours 0 0 39.3
- 16. Gross Thermal Energy Generated (MWil) 0 3.532.422 108.667.938
- 17. Gross Electrical Energy Generated (MWil) 0__ , _ 1,160,280 35,373,875 IS. Net Electrical Energy Generated (MWH) -3003 1,096,534 33,360,725
- 19. Unit Service Factor 0 62.5 79.2
- 20. Unit Availanility Factor 0 62.5 79.3
- 21. Unit capacity Factor iUsing MDC Net) 0 62.1 77.3
- 22. Unit Capacity Factor (Using DER Net) 0 61.2 75.2
- 23. Unit Forced Outage Rate 0 1.1 4.6
- 24. Shutdowns Scheduled Over Nest 6 MonthsIType.Date,and Duration of Eachp:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: to be determined
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 19/77i
50-335 UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKET NO. _
" * ' " i UNIT NAME DATE Anril 15. 1993 REPORT MONTH flarch, 1983 COMPLETED BY PI I - Para TELEPHONE (305) 552-3654
~.
- E . E
!? 3 j EE Licensee [g $*t C:ause & Corrective p'
j No. Date g 3g i; jg& Event 3 'y Action to
$~ $ 55:
Report : mL uo Prevent Recurrence
- 6 3 830226 S 744 C 4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.
l 4
1 4
4 i,
1
'l 4
I 2 3
! F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Seram. En ry Sheeis for Licensee C-Refueling 3 Automatic Scram. Event Report (LE R) File (NURI G-D-Regulatory Restriction $0ther (Explain) 0161)
E-Operator Training & 1; cense Examination ,
, F Administrative 5 i
G Operational Error (Explam) s_ toao 44a,vea. .,1 Estubit I - Same Sourse (9/77) 114):her (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie Unit 1 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Ma rch,1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.
Other major safety related maintenance included:
A rod position indication power supply was repaired.
A heat tracing circuit was repaired.
A fire detector was replaced.
The core barrel and thermal shield were inspected. See LER 335-83-22 for details.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in formation.
In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.
a
P.O. BOX 529100 MIAMI, FL 33152 l
l FLORIDA POWER & LIGHT COMPANY April 15, 1983 PNS-LI-83-278 Office of flanagement Information ;
and Program Controls 1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Attached are the March,1983, Operating Status Reports and Operating Summary Reports for Turkey Point Units Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours,
/a J. W. Williams, Jr.
Vice President Nuclear Energy I
JWW/PLP/mpc
\
l' l
l 1
l l
l ,
l 1
/[/
PEOPLE. . SERVING PEOPLE