AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-250 UNIT Turkey Point _3 DATE April 15, 1983 COMPLETED 15Y P 1 paco TELEFilONE _'(305) 552-3654 MONDI tiarch, 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (5 Y Net)
~
.(Mget) i 17 697 698 2
3 696 643-3 339 4
20 691 692 5
689 697 6
22 7
689 700 23 696 699-8 24 593 701 9
25 10 696 702 26 699 700 27 I
698 I2
,g 05 697 13 702 695 14 30 696 IS 3,
700 16 INSTRUCTIONS On this format.hst the ases. ige daily unit power leselin MWe-Set for ea:h day in the reportin;inonth. Compute to the nearest whole megawart.
(9/77) 8306020216 830415 DR ADOCK 05000250 PDR
\\
OPERATING DATA REPORT DOCKET NO.
50-250 DATE Anril 1s 1983 COMPLETED BY P'. L. Pace TEl.EPilONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name:
Turkey Point 3 Not" Unit 3 operated at es-March, 1983 sentially full power except
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
??00 for a brief 0utage for
- 4. Nameplate Rating (Gross MWe):
760 plant modification.
693
- 5. Design Electrical RatinglNet MWe):
680
- 6. Maximum Dependable Capacity (Gross MWe):
646
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lesel To which Restricted. If Any (Net MWe):
- 10. Reasams For Restrictions,if Any:
This Month Yr..:o-Date Cumulatise 744 2160 90.465.6 i1. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 741.6 2126.8 63,646.1 0
0 844.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 735.2 2046.9 61.552.0
- 15. Unit Resene Shutdown Hours 0
0 121.8
- 16. Gross Thermal Energy Generated (MWH) 1,615,637 4,487,068 125,904,980 532,920 1,477,585 40,139,705
- 17. Gross Electrical Energy Generated (MWH) b @,'7 F ~
l,408,59/
3/ 996,149
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor 98.8 94.8 68.0 98.8 94.8 68.2
- 20. Unit Asailability Factor 105.8 100.9 65.0
- 21. Unit Capacity Factor IUsing MDC Net) 98./
94.1 60.6
- 22. Unit Capacity Factor (Using DER Net)
U 4*D D/
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEP.ATION 19/77)
JN
T UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turkey Point 3 DATE April 15, 1983 REPORT MONDI flarch, 1983 COMPLETED BY P. L.
Face TELEPHONE (305) 552-3654 x
=, _
p 7 s 'A Licensee S"
ei 3 = ::
3e c -r.
5;.
Cause & Correceive No.
Date g
3g g
jgg Event u?
E"E Action to
$5 5
j di g Report =
$0 L
Preve,1 Recurrence 6
5 830320 S
8.8 H
1 EB ELECON The unit was removed from service to facilitate installation of auxiliary power upgrade modifications.
I 2
3 4
F: Forced Reason:
Method:
Exlubit G - Instructions S: Scheduled A Equipment Failure (Explain) 14hnual for Preparation of Data B-Maintenance of Test 2 Manual Scram-Entry Sheets for beensee C Refuehng 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction C{Other (Explain) 0161)
EOperator Training & License Examination F-Administratise 5
G-Operational Error ( E xplam )
s. to ac. 44a,ve.a..ct Exhibit I - Same Source (9/77) llother (Explam) i t
~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO,.
,50-250 UNIT
_ Turkey Point 3 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH March, 1983 Unit 3 operated at essentially full power execpt for a brief outage to facili-tate auxiliary power upgrade modifications.
11ajor safety related maintenance activities included:
Several reactor protection circuits were repaired.
A boric acid heat tracing circuit was replaced.
A reactor.incore instrumentation detector cable was replaced.
Inspections and reiuirements of IE Bulletins and NUREG-0737 are continuing.
l Florida Power & Light Company. commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional informa tion.
f i
l l
l
[
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 April 15, 1983
~
DATE COMPLETED BY P. L. P' ace TELEPflONE 1305) 552-3654 f
MONTH thrch. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)
-(MWe-Net )
I,e 2
gg 3
6 22 y
g
~
9 25
~~~
10 26 12 3
13 39 14 30 IS 33 I
INSTRUCTIONS On this format. fist the average daily unit power leselin MWe-Nei for each day i.: the reporting:nonth. Compute to the nearest whute megawart.
l (9/77)
OPERATING DATA REPORT DOCKET NO. 50-251 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name:
Turkey Point 4 Notes Steam Generator Repair
- 2. Reponing Period:
fiarch, 1983 program in progress.
2200
- 3. Licenwd Thermal Power (MWI):
760
- 4. Nameplate Rating (Gross MWe):
- 5. Design Elcetrical Rating (Net MWe):
693 680
- 6. Maximum Dependable Capacity (Gross MWe):
646
- 7. Masimum Dependable Capacity (Net MWef:
- h. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Ghe Reasons:
~
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr. to-Date Cumularise 744 2160 84.193 i1. Hours in Reporting Period
- 12. Number Of Ilours Reactor Was Critical 0
0 59.855.3 0
0 166.6
- 13. Reactor Reserve Shutdown Hours 0
0 57.896
- 14. Hours Generator On-Line
- 15. Unit Resene Shutdown Hours 0
0 31.2
- 16. Gross Thermal Energy Ge'nerated (MWH) 0 0
121,918,244 0
0 38,775,512
- 17. Gross Electrical Energy Generated (MWHI
-1553
-3526 36~,727,096
- 18. Net Electrical Energy Generated (MWil) 0 0
68.8
- 19. Unit Senice Factor
- 20. Unit Asailability Factor 0
0 68.8 0
0 67.5
- 21. Unit Capacity Factor (Using MDC Net) 0 0
62.9
- 22. Unit Capacity Factor IUsing DER Net) 0 0
3.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type, Date,and Duration of Each):
- 25. C." Shut Down At End Of Report Period. Estimated Date of Startup:
Ma y.
1983
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION i
50 251 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO'.
UNIT N AME Turkey Point 4 DATE April 15, 1983 REPORT MONTH March, 1983 COMPLETED gy _P. L. Pa c e i
TELEPHONE (305) 552-3654 1
":=
c 5 3 3
-.*$5 Licensee 5 r, je Cause & Currective o
l No.
Date
{
3g
(
jg5 Event 3, V7 93 Action to 3 5 =!
Reporia E'
Prevent Recurrence i-m e
v i
6 i
4 18 821009 S
744 H
4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.
h i
i l
l 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Pefueling 3-Automatic Scram.
Event Report tLER) File (NURI G-D-Regulatory Restriction 9-Ot her ( Explain) 0161) i E-Operator Training & Ucense Examination p
F-Administrative 5
G-Operational Error (Explain) c. /.e; 4.
asewci..cl Eshibit I - Same Source (9/77)
Il-O her(Explain) b
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point 4 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH u,,,.s, 3003 Unit 4 continued the Steam Generator Repair Program.
Other major safety related maintenance activities included:
Several reactor protection circuits were repaired.
Numerous instrumentation transmitters were replaced.
A boric acid heat tracing circuit was repaired.
A safety injec_tio.n breaker was repaired.
Inspections and requirements of IE Bulletins and flVREG-0737 are contin'uing.
Florida Power & Light Company commitments for flVREG-0737 implementation are continuing.
in forma tion.
Refer to correspondence between FPL and flRC for additional r.
4
- p
..'y f:
- 4" l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-335 UNIT St. Lucie 1 April 15, 1983 DATE COMPLETED BY - P. L. Pace
(-305) 552.365'4 TELEPHONE MONTH
!brch. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER 3 GE DAILY POWER LEVEL (MWe Net)
-(MWe-Net) g 2
gg 3
39 4
20 5
3 6
22 7
23
-~
~~~
8 24 10 1
26 1,
28 13 29
(
15 3g 16 INSTRUCTIONS On this format.hst the average daily unit power lesel in MWe-Nei for each day in the reporting anonth. Compute to the nearest whole megawart.
(9/77)
OPERATING DATA REPORT 50-335 DOCKET NO.
DATE April Ib, 1983 COMPLETED BY P. L. Pace TEI EPilONE (305) 552-3654 OPERATING STATUS St. Lucie 1 Note $
Unit I remained out of
- 1. Unit Name:
flarch, 1983 service for refueling and
- 2. Reporting Period;
- 3. Licensed Thermal Power (MWt):
2200 scheduled maintenance.
890
- 4. Nameplate Rating (Gross MWe):
830
- 5. Design Electrical Rating (Net MWe):
862
- 6. Masimum Dependable Capacity (Gross MWe):
817
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumularise 744 2160 55.008 i1. Ilours in Reporting Period
- 12. Number Of Ilours Reactor Was Critical 0
1366.9 44,466.1 0
0 205.3
- 13. Reactor Reserve Shutdown Hours
- 14. Ilours Generator On-Line 0
1350.9 43,576.2 0
0 39.3
- 15. Unit Rewrve Shutdown l{ours
- 16. Gross Thermal Energy Generated (MWil) 0 3.532.422 108.667.938
- 17. Gross Electrical Energy Generated (MWil) 0__, _
1,160,280 35,373,875
-3003 1,096,534 33,360,725 IS. Net Electrical Energy Generated (MWH) 0 62.5 79.2
- 19. Unit Service Factor 0
62.5 79.3
- 20. Unit Availanility Factor
- 21. Unit capacity Factor iUsing MDC Net) 0 62.1 77.3 0
61.2 75.2
- 22. Unit Capacity Factor (Using DER Net) 0 1.1 4.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 MonthsIType.Date,and Duration of Eachp:
to be determined
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 19/77i
50-335 UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKET NO.
i UNIT NAME DATE Anril 15. 1993 REPORT MONTH flarch, 1983 COMPLETED BY PI I - Para TELEPHONE (305) 552-3654
~.
E E
!?
3 j EE Licensee
[g
$*t C:ause & Corrective j
No.
Date g
3g i;
jg&
Event 3 'y p'
Action to
$~
55:
Report :
mL Prevent Recurrence o
u 6
3 830226 S
744 C
4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.
l 4
1 4
4 i,
'l 1
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Seram.
En ry Sheeis for Licensee C-Refueling 3 Automatic Scram.
Event Report (LE R) File (NURI G-D-Regulatory Restriction
$0ther (Explain) 0161)
E-Operator Training & 1; cense Examination F Administrative 5
G Operational Error (Explam) s_ toao 44a,vea..,1 Estubit I - Same Sourse i
(9/77) 114):her (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-335 UNIT St. Lucie Unit 1 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Ma rch,1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.
Other major safety related maintenance included:
A rod position indication power supply was repaired.
A heat tracing circuit was repaired.
A fire detector was replaced.
The core barrel and thermal shield were inspected.
See LER 335-83-22 for details.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in formation.
In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.
a
P.O. BOX 529100 MIAMI, FL 33152 FLORIDA POWER & LIGHT COMPANY April 15, 1983 PNS-LI-83-278 Office of flanagement Information and Program Controls U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Attached are the March,1983, Operating Status Reports and Operating Summary Reports for Turkey Point Units Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours,
/a J. W. Williams, Jr.
Vice President Nuclear Energy JWW/PLP/mpc
\\
l l
/[/
PEOPLE.. SERVING PEOPLE
.._._.,,.._~__,
_