ML20084M551

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1983
ML20084M551
Person / Time
Site: Saint Lucie, Turkey Point, 05000000, 05000257
Issue date: 04/15/1983
From: Pace P, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-83-278, NUDOCS 8306020216
Download: ML20084M551 (13)


Text

.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-250 UNIT Turkey Point _3 DATE April 15, 1983 COMPLETED 15Y P 1 paco TELEFilONE _'(305) 552-3654 MONDI tiarch, 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (5 Y Net)

~

.(Mget) i 17 697 698 2

3 696 643-3 339 4

20 691 692 5

689 697 6

22 7

689 700 23 696 699-8 24 593 701 9

25 10 696 702 26 699 700 27 I

698 I2

,g 05 697 13 702 695 14 30 696 IS 3,

700 16 INSTRUCTIONS On this format.hst the ases. ige daily unit power leselin MWe-Set for ea:h day in the reportin;inonth. Compute to the nearest whole megawart.

(9/77) 8306020216 830415 DR ADOCK 05000250 PDR

\\

OPERATING DATA REPORT DOCKET NO.

50-250 DATE Anril 1s 1983 COMPLETED BY P'. L. Pace TEl.EPilONE (305) 552-3654 OPERATING STATUS

1. Unit Name:

Turkey Point 3 Not" Unit 3 operated at es-March, 1983 sentially full power except

2. Reporting Period:
3. Licensed Thermal Power (MWt):

??00 for a brief 0utage for

4. Nameplate Rating (Gross MWe):

760 plant modification.

693

5. Design Electrical RatinglNet MWe):

680

6. Maximum Dependable Capacity (Gross MWe):

646

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
9. Power Lesel To which Restricted. If Any (Net MWe):
10. Reasams For Restrictions,if Any:

This Month Yr..:o-Date Cumulatise 744 2160 90.465.6 i1. Hours in Reporting Period

12. Number Of Hours Reactor Was Critical 741.6 2126.8 63,646.1 0

0 844.4

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 735.2 2046.9 61.552.0
15. Unit Resene Shutdown Hours 0

0 121.8

16. Gross Thermal Energy Generated (MWH) 1,615,637 4,487,068 125,904,980 532,920 1,477,585 40,139,705
17. Gross Electrical Energy Generated (MWH) b @,'7 F ~

l,408,59/

3/ 996,149

18. Net Electrical Energy Generated (MWH)
19. Unit Senice Factor 98.8 94.8 68.0 98.8 94.8 68.2
20. Unit Asailability Factor 105.8 100.9 65.0
21. Unit Capacity Factor IUsing MDC Net) 98./

94.1 60.6

22. Unit Capacity Factor (Using DER Net)

U 4*D D/

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEP.ATION 19/77)

JN

T UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turkey Point 3 DATE April 15, 1983 REPORT MONDI flarch, 1983 COMPLETED BY P. L.

Face TELEPHONE (305) 552-3654 x

=, _

p 7 s 'A Licensee S"

ei 3 = ::

3e c -r.

5;.

Cause & Correceive No.

Date g

3g g

jgg Event u?

E"E Action to

$5 5

j di g Report =

$0 L

Preve,1 Recurrence 6

5 830320 S

8.8 H

1 EB ELECON The unit was removed from service to facilitate installation of auxiliary power upgrade modifications.

I 2

3 4

F: Forced Reason:

Method:

Exlubit G - Instructions S: Scheduled A Equipment Failure (Explain) 14hnual for Preparation of Data B-Maintenance of Test 2 Manual Scram-Entry Sheets for beensee C Refuehng 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction C{Other (Explain) 0161)

EOperator Training & License Examination F-Administratise 5

G-Operational Error ( E xplam )

s. to ac. 44a,ve.a..ct Exhibit I - Same Source (9/77) llother (Explam) i t

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO,.

,50-250 UNIT

_ Turkey Point 3 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH March, 1983 Unit 3 operated at essentially full power execpt for a brief outage to facili-tate auxiliary power upgrade modifications.

11ajor safety related maintenance activities included:

Several reactor protection circuits were repaired.

A boric acid heat tracing circuit was replaced.

A reactor.incore instrumentation detector cable was replaced.

Inspections and reiuirements of IE Bulletins and NUREG-0737 are continuing.

l Florida Power & Light Company. commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional informa tion.

f i

l l

l

[

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 April 15, 1983

~

DATE COMPLETED BY P. L. P' ace TELEPflONE 1305) 552-3654 f

MONTH thrch. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)

-(MWe-Net )

I,e 2

gg 3

6 22 y

g

~

9 25

~~~

10 26 12 3

13 39 14 30 IS 33 I

INSTRUCTIONS On this format. fist the average daily unit power leselin MWe-Nei for each day i.: the reporting:nonth. Compute to the nearest whute megawart.

l (9/77)

OPERATING DATA REPORT DOCKET NO. 50-251 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 OPERATING STATUS

1. Unit Name:

Turkey Point 4 Notes Steam Generator Repair

2. Reponing Period:

fiarch, 1983 program in progress.

2200

3. Licenwd Thermal Power (MWI):

760

4. Nameplate Rating (Gross MWe):
5. Design Elcetrical Rating (Net MWe):

693 680

6. Maximum Dependable Capacity (Gross MWe):

646

7. Masimum Dependable Capacity (Net MWef:
h. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Ghe Reasons:

~

9. Power Lesel To Which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr. to-Date Cumularise 744 2160 84.193 i1. Hours in Reporting Period

12. Number Of Ilours Reactor Was Critical 0

0 59.855.3 0

0 166.6

13. Reactor Reserve Shutdown Hours 0

0 57.896

14. Hours Generator On-Line
15. Unit Resene Shutdown Hours 0

0 31.2

16. Gross Thermal Energy Ge'nerated (MWH) 0 0

121,918,244 0

0 38,775,512

17. Gross Electrical Energy Generated (MWHI

-1553

-3526 36~,727,096

18. Net Electrical Energy Generated (MWil) 0 0

68.8

19. Unit Senice Factor
20. Unit Asailability Factor 0

0 68.8 0

0 67.5

21. Unit Capacity Factor (Using MDC Net) 0 0

62.9

22. Unit Capacity Factor IUsing DER Net) 0 0

3.9

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Type, Date,and Duration of Each):
25. C." Shut Down At End Of Report Period. Estimated Date of Startup:

Ma y.

1983

26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION i

50 251 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO'.

UNIT N AME Turkey Point 4 DATE April 15, 1983 REPORT MONTH March, 1983 COMPLETED gy _P. L. Pa c e i

TELEPHONE (305) 552-3654 1

":=

c 5 3 3

-.*$5 Licensee 5 r, je Cause & Currective o

l No.

Date

{

3g

(

jg5 Event 3, V7 93 Action to 3 5 =!

Reporia E'

Prevent Recurrence i-m e

v i

6 i

4 18 821009 S

744 H

4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.

h i

i l

l 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Pefueling 3-Automatic Scram.

Event Report tLER) File (NURI G-D-Regulatory Restriction 9-Ot her ( Explain) 0161) i E-Operator Training & Ucense Examination p

F-Administrative 5

G-Operational Error (Explain) c. /.e; 4.

asewci..cl Eshibit I - Same Source (9/77)

Il-O her(Explain) b

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-251 UNIT Turkey Point 4 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH u,,,.s, 3003 Unit 4 continued the Steam Generator Repair Program.

Other major safety related maintenance activities included:

Several reactor protection circuits were repaired.

Numerous instrumentation transmitters were replaced.

A boric acid heat tracing circuit was repaired.

A safety injec_tio.n breaker was repaired.

Inspections and requirements of IE Bulletins and flVREG-0737 are contin'uing.

Florida Power & Light Company commitments for flVREG-0737 implementation are continuing.

in forma tion.

Refer to correspondence between FPL and flRC for additional r.

4

p

..'y f:

- 4" l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-335 UNIT St. Lucie 1 April 15, 1983 DATE COMPLETED BY - P. L. Pace

(-305) 552.365'4 TELEPHONE MONTH

!brch. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER 3 GE DAILY POWER LEVEL (MWe Net)

-(MWe-Net) g 2

gg 3

39 4

20 5

3 6

22 7

23

-~

~~~

8 24 10 1

26 1,

28 13 29

(

15 3g 16 INSTRUCTIONS On this format.hst the average daily unit power lesel in MWe-Nei for each day in the reporting anonth. Compute to the nearest whole megawart.

(9/77)

OPERATING DATA REPORT 50-335 DOCKET NO.

DATE April Ib, 1983 COMPLETED BY P. L. Pace TEI EPilONE (305) 552-3654 OPERATING STATUS St. Lucie 1 Note $

Unit I remained out of

1. Unit Name:

flarch, 1983 service for refueling and

2. Reporting Period;
3. Licensed Thermal Power (MWt):

2200 scheduled maintenance.

890

4. Nameplate Rating (Gross MWe):

830

5. Design Electrical Rating (Net MWe):

862

6. Masimum Dependable Capacity (Gross MWe):

817

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Gise Reasons:
9. Power Level To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumularise 744 2160 55.008 i1. Ilours in Reporting Period

12. Number Of Ilours Reactor Was Critical 0

1366.9 44,466.1 0

0 205.3

13. Reactor Reserve Shutdown Hours
14. Ilours Generator On-Line 0

1350.9 43,576.2 0

0 39.3

15. Unit Rewrve Shutdown l{ours
16. Gross Thermal Energy Generated (MWil) 0 3.532.422 108.667.938
17. Gross Electrical Energy Generated (MWil) 0__, _

1,160,280 35,373,875

-3003 1,096,534 33,360,725 IS. Net Electrical Energy Generated (MWH) 0 62.5 79.2

19. Unit Service Factor 0

62.5 79.3

20. Unit Availanility Factor
21. Unit capacity Factor iUsing MDC Net) 0 62.1 77.3 0

61.2 75.2

22. Unit Capacity Factor (Using DER Net) 0 1.1 4.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 MonthsIType.Date,and Duration of Eachp:

to be determined

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 19/77i

50-335 UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

i UNIT NAME DATE Anril 15. 1993 REPORT MONTH flarch, 1983 COMPLETED BY PI I - Para TELEPHONE (305) 552-3654

~.

E E

!?

3 j EE Licensee

[g

$*t C:ause & Corrective j

No.

Date g

3g i;

jg&

Event 3 'y p'

Action to

$~

55:

Report :

mL Prevent Recurrence o

u 6

3 830226 S

744 C

4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.

l 4

1 4

4 i,

'l 1

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Seram.

En ry Sheeis for Licensee C-Refueling 3 Automatic Scram.

Event Report (LE R) File (NURI G-D-Regulatory Restriction

$0ther (Explain) 0161)

E-Operator Training & 1; cense Examination F Administrative 5

G Operational Error (Explam) s_ toao 44a,vea..,1 Estubit I - Same Sourse i

(9/77) 114):her (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-335 UNIT St. Lucie Unit 1 DATE April 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Ma rch,1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.

Other major safety related maintenance included:

A rod position indication power supply was repaired.

A heat tracing circuit was repaired.

A fire detector was replaced.

The core barrel and thermal shield were inspected.

See LER 335-83-22 for details.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in formation.

In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.

a

P.O. BOX 529100 MIAMI, FL 33152 FLORIDA POWER & LIGHT COMPANY April 15, 1983 PNS-LI-83-278 Office of flanagement Information and Program Controls U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Attached are the March,1983, Operating Status Reports and Operating Summary Reports for Turkey Point Units Nos. 3 and 4 and St. Lucie Unit No. 1.

Very truly yours,

/a J. W. Williams, Jr.

Vice President Nuclear Energy JWW/PLP/mpc

\\

l l

/[/

PEOPLE.. SERVING PEOPLE

.._._.,,.._~__,

_