AO 50-237/1974-37:on 740801,during HPCI Testing,Valve 2-2301-35 Failed to Open.Caused by out-of-adjustment Breaker Contractors.Contractors Adjusted.Breaker Operated Satisfactorily
ML20084L659
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/09/1974
From: Stephenson B
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084L663 List:
References
573-74, NUDOCS 8305230600
Download: ML20084L659 (2)


Text

-

.\ CommC' palth Etlison 4 --- / One brst L6nal P: ara. Ch:cano VMc.s

~

M,. Ac':ress ficply to: PoiTOTce' Box 7ts Chicago, !!hnois C0693 BBS Ltr.d573-74 Dresden Nuclear Power Station R. R. #1 4 Morris, Illinois 60450 .

August 9, 1974 o

?il rqb ll,_s AV\

fff,7y,r,) m ,

t. i

'8 +

Mr. Ja:nes G. Keppler,- Regional Director 7 WI s '.! jgi.

Directorate of Regulatory Operations-Region III \

\ '"9e y \ !

U. S. Atomic Energy Cc:=rission , /0 799 Roosevcit Road {

Glen Ellyn, Illinois 60137 ~~-...i.d9

~, ;

SUlMECT: PfPORT OF AEN0'U'AL 0CCffRRENCE PER SECTION 6.6.R OF 'INE TEO.!NICAL SPECIFICATIONS.

JIPCI VALVE 2-2301-35 UOULD N0_T OPEN.

Referencesi 1) Ete,ul s tory Guide 1.16 Rev.1 Appendix A

2) Notificaiion of Region III of AEC Regulatory Operations Telephone: !!r F. I' aura,1545 hours0.0179 days <br />0.429 hours <br />0.00255 weeks <br />5.878725e-4 months <br /> on 8/2/74.

Telegram: !!r. J. Kcppler, 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> on 8/2/74.

3) Drawing Na:cber: P&ID M-51 neport remocr: 20-b//N-3/

Report Date: August 9, 1974 Occurrence Date: August 1,.1974 Facility: Dresden Nucicar Power Station, Morris, Illinois -

IDEITTIFICATION 07 OCC11RRENCE On August 1,1974. HPCI valve 2-2301-35 would not open. The breaker was not tripped.

_ CONDITIONS PRIOR TO OCCURRENCE On August 1, 1974, Unit 2 was in start-up with a power icvel of approxtrately 5001Mt.

i DESCRIPTION OF OCCURRENCE On Aup,ust 1,1974 ITCI testing van in progress. It was found that valva 2-2391-35~' m i' '.7.t cren. The cyctea w.c beic3 tested bec.use Cre:c d hen a mie wo emap en & yrtc: . j

(

\

\

d"yh, =

8305230600 740009

) -

PDR ADOCK 05000237 S pm , l', (t ' 'v '

8 d, U J -

~

l

, W1'I br.H1 IWG10N

r Mr. J:mes C. Kappler August 9, 1974 lh )

DE'STCt!ATION OF APPARE!TT CAUSE OF FAIT.URE -

Component Failure Upon checking the breaker, it was found that the contactors were out of adjustment.

ANALYSIS OF OCCURRENCE There were no safety consequences to the public or plant personnel as a result of this occurrence becausa llPCI was never needed. Also, the backup system, auto blowdown, was always operable.

CORPICTIVE ACTION The contactors on the breaker were adjusted and the breaker cperated saticfactorily.

. There in a program to check these breakers on a periodic basia, but this breaker had not been inspected yet.

FAILURE DATA Tlila type vi ineoiet h.su iu d s lu il u failures in t.iie past. 'Ahnt is why the periodic inspaction progran was initiated. This inspection pro, gram should help to olhainate this type of failure.

EQUIPMENT IDE!TTIFICATION Cutler hammer 250V=DC breaker Sincerely,

. / ~ N/ G 8'

-[63IB.Stephenson Superintendent BBS:LJD:do 6

4 4 i

+