a-
[
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)841-4000 April 25, 1984 Docket Nos. 50-277 50-278 Dr. Thomas E. Murley Office of Inspection and Er.forcement U.S. Nuclear Regulatory Co mission Region I 631 Park Avenue King of Prussia, PA 19406
Dear Dr. Murley:
Enclosed is a copy of Annual Occupational Exposure Tabulation No. 8, January 1, 1983, to December 31, 1983, for Peach Bottom Atomic Power Station Units 2 and 3.
C2 This report is being submitted in compliance with Technical Specifications of Operating Licenses DPR-44 and DPR-56 and 10 CFR 20.407 (b).
Due to an administrative oversight in the final preparation of this report, it is not being submitted within the required time frame.
We have interviewed the personnel who are involved with this report in order to determine the source of this deficiency.
As a result, in order to prevent recurrence, a listing of periodic reporting requirements will be reviewed by my office on a monthly basis in order to identify impending due dates and assure compliance.
8405140436 840425 PDR ADOCK 05000277 R
pm i
g_
.e Dr. Thomas E. Murley April 25, 1984 Page 2 In order to relieve the inconvenience caused by this late submittal, we have forwarded, by separate cover, the data to Ms. Barbara Brooks at the NRC Office of Regulatory Research in Rockville, Maryland.
Very truly yours,
/
/
W. M. Alden, Engineer-In-Charge Licensing Section Nuclear Generation Division Enclosure cc: