ML20084L174
| ML20084L174 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/30/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 97, W3K84-0986, W3K84-986, NUDOCS 8405140367 | |
| Download: ML20084L174 (2) | |
Text
,
.* e.
w-142 DELARONDE STREET POWER & L1GHT P O BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 UTIUT:ES SYSTEM April 30, 1984 W3K84-0986 Q-3-A35.07.97 2@MDME %
Mr. John T. Collins Regional Administrator, Region IV IMY - 7 l$3d U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
-N Arlington, Texas 76012
REFERENCE:
LP&L letter W3K84-0813 dated April 5, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 97
" Diesel Generator "B" Turbocharger Failure" Fourth Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on April 27, 1984.
At the present time, corrective action is completed and verification of the supporting documentation is scheduled to be completed by May 4, 1984.
The Final Report will be submitted to the USNRC on May 11, 1984.
Very truly yours, ff M
VMM (
T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8405$40367 840430 PDR ADOCK 05000392 S
PDR h%
) D
- 4 Mr. John T. Collins April 30, 1984 W3K84-0986 Page 2 cc: EDirector Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann
[
1424 Whitney Building New Orleans, Louisiana 70130 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814 e
[
e d- -
I
. - -