j i
k HUNTON & WILLIAMS 2000 PENNSYLVANIA AVENUE. N.W.
P.O. Box 19230 ETED tav s.., u a svassv
- p. o. som i.s.
wag 3INGTON. D.C. 20o06 v5N,RC a..
..ava.uc atw voan, atw voen soite micamomo, vinoimi assie TcLannome asa...o..aoo TcLammans.oe.v....soo twa vio...e co.*
TE LE PH O N E 202 955 1500 TELam7s47o.
- m. 33 souTM GR.No AvCNu1...
- 24'3LILolNG P o..on io 3
7 c.-m.....
v e u.-o c.m,.....
....m..
vau -o
....... 3 ri
,i 3..,. 2o..
h[N)IG & ses-o vmm.
..-.oiDY '5".*o=*^.~E *"'
May 9, 198,4 ei.., v e..i.
3 RANCH
' ' " ' " * ~ * * * ~ ' ' ' * * "
.; th".".*.".r.l.'.".';i
,'; "..m.
rim ~o.
oimact os.6 ro. aos....
Chairman Nunzio Palladino U.S. Nuclear Regulatory Commission 1717 H Street, N.W.
Washington, D.C.
20555 Long Island Lighting Company Shoreham Nuclear Power Station Docket No. 50-322-OL-4 (Low Power)
Dear Chairman Palladino:
At Monday's oral argument, the Commission requested in-formation concerning plants that have received operating li-censes without full compliance with the NRC's regulations as applicable to full power operation.
In addition to the ca.ses cited in LILCO's and the Staff's comments to the Commission and discussed during the oral argument, a number of recent low power licenses have been issued with conditions that suggest less than full compliance with the NRC's full power regula-tions.
A list of examples is attached.
The enclosed information was drawn from the licenses issued to the plants referenced.
The license conditions gener-ally do not cite the particular regulation requiring the condi-tion nor do they describe the background or the condition.
Consequently, the details of the license conditions were not readily available to LILCO.-
Nonetheless, the list does indi-cate that the NRC routinely assesses the need for full compli-ance with regulations written for full power operation in light of the activities authorized by the license.
Whether this analysis was done pursuant to S 50.57(c), an exemption provi-sion, or routine Staff practice for license conditions, it is precisely the type of analysis that was performed for Shoreham by the NRC Staff in approving LILCO's low power proposal.
Though the precise facts for each license condition may differ, 8405100009 840509 l
DR ADOCK 05000 l
Dse)
l
. s HUNTON & WILLI AMS the analytical approach is well understood and frequently ap-plied.
We hope this additional information is useful to the Commission.
Sincerely yours, sa/
'M f t
Anthony Earley, Jr.
Counsel for LILCO 221/765 Attachment cc:
Commissioner James K. Asselstine Commissioner Frederick M.
Bernthal Commissioner Victor Gilinsky Commissioner Thomas M. Roberts Service List O
N
's Examples of Conditions Imposed on Recent 5% Operatino Licenses f
)
Plant License Condition Completion Date La Salle 1 Pressure interlocks First refueling outage Grand Gulf 1 on valves at low /high pressure interfaces
-- implement isolation protection s
LaSalle 1 Reliability of diesel First refueling outage St. Lucie 2 generators -- implement San Onofre 3 design modifications San Onofre 2 to install heavy duty Grand Gulf 1 turbocharger gear drive assembly and DC prelube pump, and to-relocate instrumentation LaSalle 1 Reactor containment First refueling outage St. Lucie 2 electrical penetrations
-- add fault current devices on each penetrating circuit LaSalle 1 Separation of Class lE First. refueling outage Summer 1 and Non-Class lE cable trays -
provide adequate separation LaSalle 1 Fire protection program --
First refueling outage review certain doors and frames and certify t
their fire resistance l
ratings, or test "as l
installed" door design to determine rating, or replace doors
?
} Plant License Condition Completion Date Susquehanna 1 Battery room area --
Prior to exceeding test installed one-hour five percent power cable wrap configuration or install automatic fire extinguishing system Susquehanna 1 Containment purge system First refueling outage
-- install design features to prevent blocking of purge and vent valves by accident debris Susquehanna 1 Emergency diesel starting First refueling outage system -- install air dryers St. Lucie 2 Continuous containment Prior to exceeding purge system -- make five percent power modifications to insure operability in event of LOCA St. Lucie 2 Barrier for high energy First refuel [ng outage equipment -- install barrier amount transformer in cable spreading area McGuire 2 Thermal sleeves -- justify Ten months after Summer 1 continued operation with license for five thermal sleeves removed percent power from RCS McGuire 2 Hydrogen control measures First refueling outage
-- install adequate system i
e
1 3 Plant License Condition Completion Date San Onofre 3 Fire protection system --
Prior to exceeding install various detection /
five percent power extinguishing features and submit license amendment request to add to Tech.
Specs.
San Onofre 3 Qualification of auxiliary Prior to exceeding feedwater pump motor five percent power bearings -- propose a hardware modification and installation schedule San Onofre 2 Control room pressuriza-6 months after license tion capability -- complete modifications for positive pressure capability in control room San Onofre 2 Safety valve position Prior to exceeding indication -- environmen-five percent power tally and seismically qualify consistent with component to which attached Grand Gulf 1 Demonstrate 46 psig Prior to exceeding containment accident five percent power, pressure capability Summer 1 Overpressurization First refueling outage protection -- install low-temperature over-pressurization protection system Summer 1 Install source range First refueling out. age neutron flux monitor to alternate shutdown system to comply with 10 CFR Part 50, Appendix R
0 Plant License Condition Completion Date Summer 1 Fire protection system
--several exceptions to 10 CFR Part 50, App. R allowed Summer 1 Fire protection system Prior to exceeding
--install fire detection five percent power in several areas to comply with 10 CFR Part 50, Appendix R; in the interim establish 2-hr. fire watch t
... _. _