Confirms 720918 Telcon Re Torus Vacuum Breakers.Lever Arm Mod for Unit 2 & Plans for Mod on Unit 1 in Progress
ML20084J305
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/19/1972
From: Butterfield L
COMMONWEALTH EDISON CO.
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084J218 List:
References
NUDOCS 8305120531
Download: ML20084J305 (1)


Text

_ _ _ _ _ _. _ - _ _ _

R

,O O"~%

O' 9

Commonwealth Edison Company ONE FIRST N A T IO N A L PLAZA

  • C H I C A G O.

ILLENots Adeses tepfr fee POST OFFICE B O K F 6 7

  • C H IC A G O. IL LIN OIS 4069 0 September 19, 1972 Mr. Donald J. Skovholt 50-254/265 Assistant Director for Operating Reactors Directorate of Licensing U.S. Atomic Energy Commission Washington, D.C.

20545

Dear Mr. Skovholt:

This letter is to confirm Mr. Harlan K. Hoyt's telephone conversation with you on September 18, 1972, concerning the torus vacuum breakers on Quad-Cities Units 1 and 2.

The lever arm modification, which will improve the torus N,

vacuum breaker operation, is in progress on Unit 2 at the present time.

Unit 2 is currently out of service for repairs to the jet pumps.

Unit 2 will not be returned to service until the vacuum breaker lever arm modification is complete.

Current plans for Quad-Cities Unit 1 call for the lever arm modification to be installed between October 8 and October 15, 1972.

This schedule is dictated by the return to service of Quad-Cities Unit 2 as mentioned above and Joliet Unit 8.

Joliet Unit 8, a 600 Mw fossil fueled unit, suffered the loss of its main trans-former last week.

Should any change in these plans be required, we will contact you immediately.

'G

[

,2 m

Very truly yours, c) u o

y. )j

~

{

U N

$5 ci L. D. Butterfield, Jr.

U

}

g.,

' Ij,2 -

Nuclear Licensing Administrator p@