Commonwealth Edison Company ONE FIRST N A T IO N A L PLAZA
- C H I C A G O.
ILLENots Adeses tepfr fee POST OFFICE B O K F 6 7
- C H IC A G O. IL LIN OIS 4069 0 September 19, 1972 Mr. Donald J. Skovholt 50-254/265 Assistant Director for Operating Reactors Directorate of Licensing U.S. Atomic Energy Commission Washington, D.C.
20545
Dear Mr. Skovholt:
This letter is to confirm Mr. Harlan K. Hoyt's telephone conversation with you on September 18, 1972, concerning the torus vacuum breakers on Quad-Cities Units 1 and 2.
The lever arm modification, which will improve the torus N,
vacuum breaker operation, is in progress on Unit 2 at the present time.
Unit 2 is currently out of service for repairs to the jet pumps.
Unit 2 will not be returned to service until the vacuum breaker lever arm modification is complete.
Current plans for Quad-Cities Unit 1 call for the lever arm modification to be installed between October 8 and October 15, 1972.
This schedule is dictated by the return to service of Quad-Cities Unit 2 as mentioned above and Joliet Unit 8.
Joliet Unit 8, a 600 Mw fossil fueled unit, suffered the loss of its main trans-former last week.
Should any change in these plans be required, we will contact you immediately.
'G
[
,2 m
Very truly yours, c) u o
- y. )j
~
{
U N
$5 ci L. D. Butterfield, Jr.
U
}
g.,
' Ij,2 -
Nuclear Licensing Administrator p@
yn
}