Responds to IE Bulletin 84-02 Re GE Relays.Ge Hfa Relays Not in Use in safety-related Circuits.Facts Support Negative Declaration for Bulletin
ML20084J265
Person / Time
Site: Washington Public Power Supply System
Issue date: 04/24/1984
From: Root R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
G1-84-127, GO1-84-0127, GO1-84-127, IEB-84-02, IEB-84-2, NUDOCS 8405090056
Download: ML20084J265 (2)


Text

,

o o

J w.

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashington Way Richland. Washington 99352 (509)372 5000 April 24, 1984 G01-84-0127 Mr. J. B. Martin Regional Administrator Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, Calif. 94596

Subject:

NUCLEAR PROJECTS NOS 1 & 4 DOCKET NOS. 50-460 & 50-513 INSPECTION AND ENFORCEMENT (l&d)

BULLETIN 84 GENERAL ELELTRIC RELAYS We have established that we do not use GE HFA relays in safety-related circuits at WNP-1 or WNP-4 and we do not plan to add any.

Further, we will have an approved procedural mechanism in place that precludes inadvertent procurement of the subject relays and other " restricted" components by December 1984.

These facts support our negative declaration for IE Bulletin 84-02.

Regarding the request to describe our review of potential similiar generic problems with relays from other manufacturers, we have procured only fully qualified relays for use in safety-related circuits. Relays have been qualified to the requirements of Regulatory Guide 1.89, which includet effects of thermal aging as appropriate. Our planned operational surveillance testing program will detect relay failures if they occur in the futuro.

We do not plan any short-term actions on this matter, and our long-term actions will be covered by the routine operational surveillance and testing program. We anticipate that if any trend toward increased failure rates develops during the operational phase, it will be detected early enough to develop a responsive corrective action progra:a at that time, tailored to the observed failure modes.

We plan no further action on this subject.

R. W. Root. Director W1P-1/4 Program (821)

RWR: GAB:pp cc:

TA Mangelsdorf, BPC (862)

V Mani, UE&C (897)

EC Haren UE&C (895)

BDCC (828)

FDCC (899)

ORM (847)

NRC Doc. Control Desk, DC 0405090056 840424 l

PDR ADOCK 05000460 O

PDR

/E-2d I

i.:

STATE OF WASHINGTON l

COUNTY OF BENTON

)

l R. W. R001, being first duly sworn, deposes and says: That he is the Program Director WNP-1/4, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of l

said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED 2

, 1984

(/

/

d-R.W/RdbT l

On this day personally appeared before me R. W. ROOT to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this _ D h day of _ @ d 1984 M

WL k

Notary Pubihin anhr the State of Washington Raiding at Ne cud.