ML20084J211

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to Tech Spec 3.1.3.1,clarifying 840217 Proposed Tech Spec Change Re Rod Control Sys,Per 840502 Telcon
ML20084J211
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/03/1984
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20084J214 List:
References
NUDOCS 8405090033
Download: ML20084J211 (2)


Text

Mamng Address

' Alibima Powir Comp:ny 600 North 18th Street Post Offica Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6090 R.P. Mcdonald Senior Vice President L

XXX%EXMX-XKXKH XXXXX AlabamaPower Flintridge Building the southern electre system May 3, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Ccmmission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Proposed Rod Control Technical Specification Change Gentlemen:

Pursuant to commitments made by Alabama Power Company in a telephone call with the NRC Staff on May 2,1984, attached are the revised changed x pages to Technical Specification 3.1.3.1 and its bases for the Joseph M.

Farley Nuclear Plant - Units 1 and 2. This submittal is simply a non-substantive editorial clarification of Alabama Power Comi'any s proposed technical specification change for the rod control system dated February 17, 1984. The intent of the previous submittal has not been altered by this clarification.

The proposed change does not involve a Significant Hazards Consideration as defined in 10CFR50.92. The change is similar to example (iv) of " Examples of Amendments that are Considered Not Likely to Involve Significant Hazards Considerations" listed in 48FR14870 dated April 6, 1983. The proposed change is similar in that the change requests relief from an operational restriction which can now be lifted based upon previous NRC staff rev.ew.

The Plant Operations Review Committee has reviewed this proposed change. The Nuclear ~ 0perations Review Board will review this proposed change at a future meeting. Westinghouse Corporation has reviewed and concurred with the intent of this change.

This clarification supplements the proposed technical specification change dated February 17, 1984 which was considered to be a Class III Amendment for Unit 1 and Class I Amendment for Unit 2 pursuant to 10CFR170.22. The applicable fee was enclosed with the February 17, 1984 letter.

8405090033 840503 PDR ADOCK 05000348 PDR P l (

Mr. S. A. Varga May 3, 1984 U. S. Nuclear Regulatory Comission Page 2 Pursuant to 10CFR50.90 three (3) signed originals and 40 conforming copies of this proposed change are enclosed. Pursuant to 10CFR50.91 (b) we have provided a copy of this letter and its attachments to Dr. I. L. Myers the designated representative of the State of Alabama.

If you have any questions, please advise.

Yours very truly, J

R. P. Mc onald RPM /CJS:ddr-D19 Attachments cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers i

i l

i ~

i t

l

[-