Provides Update Re Idvp Plans,Per & 840427 Telcon.Presentation of Program Plan to NRC Scheduled for 840509
ML20084H775
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/03/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8405080199
Download: ML20084H775 (3)


Text

__

m._

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET 4

P.O. BOX 8699 PHILADELPHIA. PA.19101 JOHN S. KEMPER p,

V IC E-PR ESID E N T E N4tNER RING AND RESE ARCH g

Mr. A. Schwencer, Chief Licensing Branch No. 2 U. S.

Nuclear Regulatory Commission 1

Washington, D.C.

20555

Subject:

Limerick Generating Station Design Verification Program -

Limerick Unit 1

References:

1.

Letter from PECO-J.

S.

Kemper to NRC-A. Schwencer dated 3/26/84.

2.

Telecon between NRC-R.

E.

Martin, T. Ankrum. H. Wang and J. Milhoan, PECO-G. J.

Beck and J.

T. Robb and Torrey Pines Technology-G. Wessman on 4/27/84.

4 File:

GOVT l-1 (NRC)

Dear Mr. Schwencer:

The reference 1 letter informed you of our plans for l

having an independent design verification program (IDVP)

~

performed for Limerick.

This letter is being written to provide an update on our IDVP plans.

1 The reference 1 letter informed you of our decision to retain Cygna Energy Services to perform the Limerick IDVP.

Cygna has subsequently informed us of their decision to withdraw from this assignment.

We have therefore selected Torrey Pines Technology to perform the IDVP for Limerick.

Torrey Pines has substantial i

significant experience in performing IDVP's and other reviews for nuclear power plant projects.

The reference 2 telecon discussed information which should be included in the program plan.

He plan to have the i

program plan ready for presentation to the NRC staff on Wednesday, May 9,

1984.

As discussed in the reference 2 telecon, work on the IDVP will not begin until we receive written concurrence with the program plan from the NRC.

t h

oh, O

0 A

L

  • I

, We look forward to presenting the program plan to you and anticipate that the IDVP will be useful to both the staff and ourselves.

Sincerely, b5 JTR/gra/0430841110&

JTR/gra/0430841120 cc:

See Attached Service List u

I cc: Judge Iawrence Brenner Judge Peter A. florris Judge Richanl F. Cole Troy B. Conner, Jr., Erq.

Ann P. Ilodgdon, Esq.

Mr. Frank R. Ikxmno Mr. Pobert L. Anthony Charles W. Elliot, Esq.

Zori G. Ferkin, Esq.

Mr. Thalas Genisky Director, Penna. Ibargency Managrsrnt Agency Angus R. Iove, Esq.

Mr. Joseph 11. hhite, III D<wid Worcan, Esq.

Pobort J. Sugamin, Esq.

Spence W. Perry, Esq.

Jay M. Gutierren, Esq.

Atanic Safety & Licensing Appnal Iknrd Atanic Safety & Licensing thani Panel Docket & Service Section thrtha U. Buch, Erq.

Mr. Jaman Uigginn lir. Tirothy H. S. Campbell fin. Phyllis Zitzor

-