First Interim Significant Const Deficiency Rept 107 Re Schedule 80,1 & 2-inch Carbon Steel Pipe fittings.Forty-two Items in Question Will Be Removed,Scrapped & Replaced.Next Rept by 840530
ML20084G618
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/24/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
107, W3K84-0927, W3K84-927, NUDOCS 8405070296
Download: ML20084G618 (3)


Text

'

gg a

UTiuTIES SYSTEM LOUISIANA POWER & LIGHT 24a ounoNoE stnm P O BOX 6008

_Q-3-A35.07.107 M @ @ ON$

J:

Mr. John T. Collins f Regional Administrator, Region IV APR 3 01984 ,

U. S. Nuclear Regulatory Commission bd' 611 Ryan Plaza Drive, Suite 1000 g Arlington, Texas 76012 L

REFERENCE:

Telecon C. Hooper (LP&L) and J. Boardman (NRC Region IV) on March 22, 1984

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 107

" Schedule 80, 1" and 2" Carbon Steel Pipe / Fittings 'P3'"

First Interim Report In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Interim Report on Significant Construction Deficiency No.

107, " Scheduled 80, 1" and 2" Carbon Steel Pipe / Fittings 'P3'".

This item was previously identified as PRD No. 160.

Very truly yours, V N2/

T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:SSTG Attachments cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 (15 copies) 8405070296 840424 PDR ADDCK 05000302 S pop ,

m>79

\

Mr. John T. Collins April 24, 1984 W3K84-0927 l Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.

Washington, D.C. 20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814

INTERIM REPORT OF SIGNIFICANT CONSTRUCTION DEFICIENCY NO. 107

" SCHEDULE 80, 1" AND 2" CARBON STEEL PIPE / FITTINGS 'P3'"

INTRODUCTION This report is submitted pursuant to 10CFR50.55(e). It describes 1" and 2" carbon steel pipe / fittings in ASME Section III Class III installation which lack adequate material traceability.

To the best of our knowledge, this deficiency has not been reported to the USNRC pursuant to 10CFR21.

DESCRIPTION Documentation review of installation packages identified the lack of trace-ability for 1" carbon steel (C.S.) SCHEDULE 80 pipe and 1" and 2" carbon steel 3000# fittings on three level stations (AC system) for Chilled Water Expansion Tanks A, B, and A/B and on one level station (CC system) of the Component Cooling Surge Tank. Forty-two items have been identified as having indeter-minate traceability.

SAFETY IMPLICATIONS The piping and fittings in question connect CCW surge tank level monitoring equipment which automatically actuates makeup from the Demineralized Water System, automatically bypasses dry cooling towers and isolates the respective CCW train on low level in the respective tank side. The piping and fittings associated with Chilled Water Expansion Tanks A, B, and A/B connect level switches which automatically control makeup water supplied from the CCW makeup pumps. Portions of the CCW System and the Essential Services Chilled Water System are required to function following a design bases accident.

Therefore, if left uncorrected, the safe operation of the plant could be advecsely affected.

CORRECTIVE ACTION The forty-two items in question will be removed, scrapped, and replaced per engineering disposition on Nonconformance Reports. Completion of corrective action is anticipated by May 15, 1984.

A Final Report will be submitted to the NRC on or before hsy 30, 1984.