ML20084G578
| ML20084G578 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/24/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| REF-PT21-84-478-000 106, PT21-84-478, PT21-84-478-000, W3K84-0929, W3K84-929, NUDOCS 8405070278 | |
| Download: ML20084G578 (3) | |
Text
.
Louisiama
,42 cu. 0~oe s1em P O W E R & L i G H T! P O BOX 6000. NEW ORLEANS. LOutSIANA 70174
. (5041 366 2345
$S0$svsgg so April 24, 1984 W3K84- 0929 g-3-A35.07.106 J'
q/;
Mr. John T. Collins U. S. Nuclear Regulatory Commission j
Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
Telecon C. Hooper (LP&L) and W. Crossman (NRC Region IV) on April 9, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 106
" Fittings From Bonney Forge Listed on Bonney Forge Part 21 (GULFALLOY)"
Final Report In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Final Report of Significant Construction Deficiency No. 106,
" Fittings From Bonney Forge Listed on Bonney Forge Part 21 (GULFALLOY). This item was previously reported as PRD No. 163.
If you have any questions, please advise.
Very truly yours, wV T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:SSTG Attachment cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 (15 copies) h0
{
S
/J.La76 i
Mr. John T. Collins A ril 24 1984 W$K84-09}9 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson i
Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 l
Atlanta, Georgia 30339 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814
FINAL REPORT OF SIGNIFICANT CONSTRUCTION DEFICIENCY NO. 106
" GULF ALLOY, INC., 2" FPT x 1 " BUSHING F-304" INTRODUCTION This report is submitted pursuant to 10CFR50.55(e).
It describes bushing material purchased from Gulf Alloy, Inc., which does not meet the requirements of ASME NCA-3800.
This deficiency has been reported to the USNRC pursuant to 10CFR21, by the material manufacturer Bonney Forge Carlinville Plant.
DESCRIPTION Gulf Alloy, Inc., supplied the Waterford #3 site with twenty (20) fittings (2" FPT x 1 " bushings) on purchase order number WP3-4336.
In a letter dated 3/26/84, Gulf Alloy, Inc., notified Ebasco that the material manufactured by Bonney Forge Carlinville Plant was lacking the overcheck requirement of paragraph 3867.4(e)(2).
These fittings were traceable through the heat number and purchase order to the Ebasco warehouse.
SAFETY IMPLICATIONS The material in question was not installed. Therefore, no safety implications exist.
CORRECTIVE ACTION NCR-W3-7652 was issued to scrap the (twenty) 20 fittings.
Corrective action was completed on April 6, 1984, and the supporting documentation has been reviewed and the NCR was closed on April 6, 1984.
This report is submitted as the Final Report.