Text
-
~
,4
'.[
N ROCHESTER GAS At.'D ELEC TRIC CORf CR ATION e 89 L AST AVENUE, ROCHE57CR, N.Y. lat649 LEON O WHef t JR.
Ts.e e. t es vaca passion =r m et a c oc,a... 546 2700 October 21, 1975 1
,W
l Director of Nuclear Reactor Regulation
~
1 l
ATTN: Mr. Karl Goller
~
~~
)
Assistant Director for Cperating Reactors
~
Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1,1973, con-cerning periodic inspection of hydraulic shock absorbers (snubbers), an inspection of all snubbers, both inside and outside of containment, was completed on October 14, 1975.
All snubbers were considered operable at this inspection. The Bergen-Paterson unit outside of containment, reported in our letter dated October 10, 1975 to have leakage indicated, was removed for repair of the accumulator. Fluid addition was made to one other Bergen-Paterson unit outside of containment although there was no leakage exhibited.
t Very truly yours,
,Th'.~'..,Y S.
L. D. White', Jr.
8304210394 751021 PDRADOCK05000g a
I M] d 1
--- #8'" """- -. '- - - - - -J