Requests Authorization to Proceed W/Phase 2 Activities for Turbine Roll Work Scope,Per Util 840215 & 0306 Ltrs.Const Completion Program,Quality Verification Program & Status Assessment Activities Completed Successfully
ML20084F714
Person / Time
Site: Midland
Issue date: 04/26/1984
From: Quamme D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084F641 List:
References
NUDOCS 8405040289
Download: ML20084F714 (3)


Text

-

I w

s OMEM N

j p } gerg Deen L Quemme Site Manager

~

, 00s%UY

~~

L i

Mid!="d Proicc'

,/

Midland Project: Po Box 1963 Mdand, MI 48640. (517) 631 8650 April 26, 1984 Mr J J Harrison Chief, Midland Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 MIDLAND DOCKET NOS 50-329, 50-330 PHASE 2 RELEASE FOR TURBINE ROLL SYSTEMS File:

0655, Bl.7.3 UFI: 00230(S)

Serial: CSC-7664 70*01

REFERENCES:

1.

DLQuamme letter to JJHarrison dated February 15, 1984, CSM-0734.

2.

DLQuamme letter to JJHarrison dated March 6, 1984, CSC-7421 3.

DLQuamme letter to JJHarrison dated April 2, 1984, CSC-7572 This letter requests your authorization to proceed with the Phase 2 activities for the Turbine Roll work scope as described in References 1 and 2.

The sys-tems and areas required for Turbine Roll have successfully completed the Con-struction Completion Program (CCP) Quality Verification Program (QVP) and Status Assessment activities. The processes, procedures, and the final, integrated product of Phase 1, including the readiness of all organization to commence Phase 2 activities, have been reviewed by the Executive Management Review Committee and found to be accepteble. Attached to this letter _are the following support documents:

1.

Release of CIO Hold Point Number 007 2.

Minutes from the April 18, 1984 Management Review meeting 3.

Copies of required area release forms 4.

A copy of the Construction Punch List showing all known to-go work as of the date indicated.

8405040289 840502 PDR ADOCK 05000329 A

PDR OC0484-0000A-CN02 J

e

~

l The relief valves (2PSV 3207 A&B, 3208 A&B, 3209 A&B), discussed in Reference 1, are excluded from this request. The removal of these valves was requested in Reference 3 and subsequent NRC concurrence was obtained.

The following corrections and errata to References.1 and 2 were discovered during the status assessment and QVP processes.

These changes are delinated as follows:

A) Due to recent area / module changes and the issuance of Project Schedule Change Notice (PSCN) No. 27, the following commodities have module de-signators changed:

PREVIOUS PRESENT COMMODITY MODULE DESIGNATOR MODULE DESIGNATOR 1.

'PR-631-2-1 620*

260 2.

PR-631-2-3 200 260 3.

PR-631-3-1 620*

260 4.

PR-631-3-3 200 260 5.

PR-632-2-1 200 260 6.

PR-632-2-3 200 260 7.

PR-632-3-1 200 260 8.

PR-632-3-3 200 260 9.

Large Pipe 36" 2ELB-11 From Column Line H to ELB/EBD Class Break 200 260 10.

Large Pipe 36" 2ELB-12 From Column Line H to ELB/EBD Class Break 200 260 11.

Anchor on 2ELB-11 at Data Point E-60 200 260 12.

Anchor on 2ELB-12 at Data Point A-60 200

-260

  • Typographical Errors B) Attachment 2 of the Reference 1 indicating Module 200, should have read Module 260. Module 180 Turbine Building should have read Module 180 Auxiliary Building.

C) Attachment 3 of the Reference 1 indicating Module 200, should have read " Module 260."

The Whip Restraints listed for System 1ABA-4 should read Module 260-4 each, Module 620-4 each and Module 630-4 each.

D) - Module 800, Service Water Pump Structure was previously addressed and released for Phase 1 and should not have been addressed again in Reference 1 and 2 as part of the Phase 1 release for the Turbine Roll Package.

e e

oC0484-0000A-CN02

r It is requested that an expeditious review by Region III be conducted so that approval for Phase 2 construction can be given as soon as possible.

fd&)

DLQ/ BHP /TAS/dmh ec: DSHo,od, US Nuclear Regulatory Commission RJCook, Midland Resident Inspector JGKeppler, Regional Administrator Region III RNGardner, US Nuclear Regulatory Commission c