ML20084F616

From kanterella
Jump to navigation Jump to search
Advises of Cancellation of Emergency Plan Implementing Procedures Erpip 4.1.19,ERPIP 4.1.20,ERPIP 4.1.22 & Erpip 4.5.1
ML20084F616
Person / Time
Site: Calvert Cliffs  
Issue date: 04/27/1984
From:
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8405040256
Download: ML20084F616 (2)


Text

_-___

ra /lA A "A FROM:

Vinnie Usi Emergency Planning Clerk Office / Train'ing Facility Calvert Cliffs DATE:

April 27, 1984 Attached you will find Emergency Response Plan Implementation Procedure's d

Revision (s) to be incorporated into your Emergency Response Plan Implementation Procedures manuals. Please make the necessary corrections to your manuals and return.

this form signed and dated.

Revision (s) to be incorporated into manuals:

Procedure 4.1.19 Cancel Procedure 4.1,20 Cancel Procedure 4.1.22 Cancel.

Procedure 4.5.1 Cancel 4

l 1 have ncorporated the above listed Revision (s)into my manuals.

k S;gned Date 1

l AAU: bee 8405040256 840427 l

PDR ADOCK 05000317

[

F pop l

i<

T O

April 24, 1984 TO:

ERPIP Holders FROM:

T. E. Forgette

SUBJECT:

ERPIP Cancellation This letter cancels the following ERPIPs for reasons specified.

1 ERPIP 4.1.19, Emergency Repair and Damage Control Team Leader Checklist. ERPIP 4.1.19 does not provide information above that normally possessed of people holding this position.

2 ERPIP 4.1.20, Emergency Recovery and Restoration Team Leader Checklist. The Recovery and Restoration Team does not exist as a separate entity.

It is actually the combination of Maintenance and Monitoring Teams that re-enter the plant to return systems

!O to normal. ERPIP 4.1.20 does not address items specific to tasks

(,)

done by these teams, it reiterates information in ERPIP 4.9, ERPIP 4.1.5 and ERPIP 4.6.1.

3.

ERPIP 4.1.22, Emergency Communicator Checklist.

Communicators do not require a checklist for their actions.

They receive training on where to report and when and on equipment use. _ERPIP 5.1, Communications, lists systems available and describes operations.

4.

ERPIP 4.5.1, On-Site Personnel Protection, Accountability and Evacuation.

Actions addressed in this ERPIP are handled by: ERPIP 3.1, Immediate' Actions; 4.1.2, SEC Checklist; 4.1.17 Security Team; and the Table of Contents.

//

Idie Supervisor-dmergency Planning

(

POSRC Mtg.

)

Plant Superintendent ftO TEF:bec sj b

i l L